Search

Search bills, members, committees and pages...

H.R. 5631

U.S. HouseIn Senate Committee

Summary

H.R. 5631, the Geothermal Energy Advancement Act, was introduced in the House on Sep 30, 2025 by Rep. Jeff Hurd (R) with 5 co-sponsors. It last saw action on Jul 29, 2026: Committee on Energy and Natural Resources. Ordered to be reported without amendment favorably.


Record

Text

H.R. 5631 has 5 co-sponsors.

hb5631/engrossed-in-house.txt
119 HR 5631 EH: Geothermal Energy Advancement Act
U.S. House of Representatives
text/xml
EN
Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.
I
119th CONGRESS 2d Session
H. R. 5631
IN THE HOUSE OF REPRESENTATIVES
AN ACT
To promote responsible geothermal energy development on public lands, and for other purposes.
1.
Short title
This Act may be cited as the Geothermal Energy Advancement Act .
2.
Effect of pending civil actions on processing applications related to geothermal leasing
Section 4 of the Geothermal Steam Act of 1970 ( 30 U.S.C. 1003 ) is amended by adding at the end the following:
(h)
Effect of pending civil actions on processing applications related to geothermal leasing
(1)
Requirement to process applications
Notwithstanding the existence of any pending civil action that affects an application for a geothermal drilling permit, sundry notice, notice to proceed, right-of-way, or any other authorization under a valid existing geothermal lease, the Secretary shall, unless a United States Federal court vacates or provides injunctive relief for the applicable geothermal lease, geothermal drilling permit, sundry notice, notice to proceed, right-of-way, or other authorization, approve and issue, or deny, each such application not later than 60 days after completing all requirements under applicable Federal laws and regulations, including the National Environmental Policy Act of 1969, the Endangered Species Act of 1973, and division A of subtitle III of title 54, United States Code.
(2)
No new authority for Federal courts
Nothing in this subsection shall be construed as modifying any existing authority of a Federal court to vacate or provide injunctive relief for a geothermal lease, geothermal drilling permit, sundry notice, notice to proceed, right-of-way, or other authorization.
(3)
Definition of authorization
In this subsection, the term authorization means any license, permit, approval, finding, determination, or other administrative decision issued by a Federal agency, or any interagency consultation, that is required or authorized under Federal law or regulations in order to site, construct, reconstruct, or commence operations of a geothermal project administered by a Federal agency.
.
3.
Cost recovery from geothermal leasing, permitting, and inspections
Section 6 of the Geothermal Steam Act of 1970 ( 30 U.S.C. 1005 ) is amended by adding at the end the following:
(j)
Cost recovery
(1)
In general
During the period that begins on the date of enactment of this subsection and ends September 30, 2033, the Secretary may require an applicant for, or a holder of, a geothermal lease to reimburse the United States for all reasonable administrative and other costs incurred by the United States from—
(A)
processing the application for the geothermal lease, including any application for an operations plan, geothermal drilling permit, utilization plan, site license, facility construction permit, commercial use permit, and any other approval associated with a geothermal lease; and
(B)
inspecting and monitoring—
(i)
geophysical exploration activities;
(ii)
the drilling, plugging, and abandonment of wells; and
(iii)
the construction, operation, termination, and reclamation of any well site or facility for the utilization of geothermal resources pursuant to the geothermal lease.
(2)
Considerations
In determining whether to require reimbursement under paragraph (1), the Secretary shall consider whether there is in existence a cooperative cost share agreement between the United States and the holder of a geothermal lease.
(3)
Adjustments
The Secretary may reduce the amount to be reimbursed under paragraph (1) if the Secretary determines—
(A)
that full reimbursement would impose an economic hardship on the applicant; or
(B)
that a less than full reimbursement is necessary to promote the greatest use of geothermal resources.
(4)
Use
The amounts reimbursed under this subsection shall be credited to the currently applicable appropriation, account, or fund of the Department of the Interior as discretionary offsetting collections, and shall be available only to the extent provided in advance in appropriations Acts for—
(A)
processing the application for geothermal leases, including any application for operations plans, geothermal drilling permits, utilization plans, site licenses, facility construction permits, commercial use permits, and any other approval associated with geothermal leases; and
(B)
inspecting and monitoring—
(i)
geophysical exploration activities;
(ii)
the drilling, plugging, and abandonment of wells; and
(iii)
the construction, operation, termination, and reclamation of any well site or facility for the utilization of geothermal resources pursuant to geothermal leases.
.
4.
Report
(a)
Report
Not later than 5 years after the date of enactment of this Act, the Secretary of the Interior, in consultation with the geothermal industry and other stakeholders, shall submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate, and make publicly available on the website of the Department of the Interior, a report that includes—
(1)
an assessment of how the amendments made by section 3 of this Act affected the Bureau of Land Management’s geothermal program;
(2)
any recommendations for reauthorization of section 6(j) of the Geothermal Steam Act of 1970, as added by this Act; and
(3)
any other recommendations for updates to such section and the Bureau of Land Management’s geothermal program.
(b)
Considerations
In developing the report required in subsection (a), the Secretary of the Interior shall solicit facts or information from the geothermal industry and other stakeholders.
5.
Publication of Gold Book for geothermal operations on Federal lands
(a)
Identification
Not later than one year after the date of enactment of this Act, the Secretary of the Interior, in consultation with other relevant Federal agencies, shall identify standard procedures and guidelines for efficient and environmentally responsible geothermal leasing and permitting to the extent such standard procedures and guidelines are not addressed in the fourth edition of the Bureau of Land Management’s Surface Operating Standards and Guidelines for Oil and Gas Exploration and Development , commonly known as the Gold Book and last revised in 2007.
(b)
Publication
(1)
In general
Not later than 270 days after identifying standard procedures and guidelines under subsection (a), the Secretary of the Interior shall publish an updated version of the Gold Book incorporating any changes necessary to support efficient and environmentally responsible geothermal leasing and permitting for use by the field offices of the Bureau of Land Management and geothermal operators.
(2)
Renaming Gold Book
The Secretary of the Interior shall rename the Gold Book to reflect the incorporation of standard procedures and guidelines related to geothermal development.
(c)
Consultation
Before publishing an updated version of the Gold Book, the Secretary of the Interior shall consult with—
(1)
other relevant Federal agencies, including field offices of the Bureau of Land Management; and
(2)
outside stakeholders, including developers and other experts.
(d)
Inclusions
Each updated version of the Gold Book shall include standard procedures and guidelines for ensuring the efficient review and approval of environmentally responsible geothermal development, including—
(1)
exploration and geophysical operations;
(2)
permitting lease operations;
(3)
compliance with all applicable laws and regulations;
(4)
construction and maintenance; and
(5)
drilling, production, and utilization operations.
(e)
Periodic revision
The Secretary of the Interior shall—
(1)
at least once every five years, review the most recent version of the Gold Book; and
(2)
if determined necessary by the Secretary of the Interior to support efficient and environmentally responsible geothermal leasing and permitting, publish an updated version of the Gold Book.
6.
Geothermal ombudsman and permitting task force
(a)
Definitions
In this section:
(1)
Geothermal authorization
The term geothermal authorization means any license, permit, approval, finding, determination, or other administrative decision issued by the Bureau of Land Management and any interagency consultation that is required or authorized under Federal law in order to site, construct, reconstruct, or commence operations of a geothermal energy project administered by the Bureau of Land Management.
(2)
Geothermal energy project
The term geothermal energy project means a project wholly or partially located on public land that uses geothermal energy to generate heat or electricity.
(3)
Public Land
The term public land means lands subject to geothermal leasing under section 3 of the Geothermal Steam Act of 1970 ( 30 U.S.C. 1002 ).
(4)
Secretary
The term Secretary means the Secretary of the Interior.
(5)
Task force
The term Task Force means the Geothermal Permitting Task Force established under subsection (c).
(b)
Geothermal ombudsman
(1)
In general
Not later than 60 days after the date of enactment of this Act, the Secretary shall appoint from within the Bureau of Land Management a Geothermal Ombudsman.
(2)
Duties
The Geothermal Ombudsman appointed under paragraph (1) shall—
(A)
act as a liaison between—
(i)
the individual field, district, and State offices of the Bureau of Land Management;
(ii)
the Division Chief of the National Renewable Energy Coordination Office of the Bureau of Land Management; and
(iii)
the Director of the Bureau of Land Management;
(B)
provide dispute resolution services between the individual field, district, and State offices of the Bureau of Land Management and applicants for geothermal authorizations;
(C)
monitor and facilitate permit processing practices and timelines across individual field offices of the Bureau of Land Management;
(D)
develop best practices for the permitting and leasing process for geothermal resources; and
(E)
coordinate with the Federal Permitting Improvement Steering Council.
(c)
Geothermal permitting task force
(1)
Establishment
Not later than 60 days after the date of enactment of this Act, the Secretary shall establish within the Bureau of Land Management a Geothermal Permitting Task Force.
(2)
Leadership
The Task Force shall be headed by the Geothermal Ombudsman appointed under subsection (b).
(3)
Permitting support
The Task Force shall support the duties of the Geothermal Ombudsman appointed under subsection (b).
(4)
Cross-office personnel assignments
(A)
In general
In their capacity as head of the Task Force, the Geothermal Ombudsman may coordinate with any Departmental bureau or office to assign personnel with relevant expertise to assist with completion of geothermal authorizations in field, district, or State offices other than the official duty station where such personnel are located if—
(i)
the Departmental bureau or office determines that such assignment will not materially delay ongoing completion of authorizations within the office where the employee is located; and
(ii)
approval is received from the head of the official duty station where the assigned employee is located.
(B)
Assigned personnel requirements
Department personnel assigned to assist with completion of geothermal authorizations under subparagraph (A) shall—
(i)
work in-person full-time at an official Department office;
(ii)
if necessary as determined by the Geothermal Ombudsman, travel to the Bureau of Land Management field, district, or State office with jurisdiction over the geothermal authorization to which the employee has been assigned by the Geothermal Ombudsman;
(iii)
participate as part of the team of personnel working on geothermal authorizations to which the employee has been assigned by the Geothermal Ombudsman; and
(iv)
regularly report to the head of the field, district, or State office of the Bureau of Land Management with jurisdiction over geothermal authorizations to which the employee has been assigned by the Geothermal Ombudsman.
(C)
Retention allowances
(i)
In general
Subject to the availability of appropriations, the Geothermal Ombudsman may pay a retention allowance to an employee assigned to assist with the completion of geothermal authorizations under subparagraph (A). Retention allowances—
(I)
shall be stated as the percentage of the rate of basic pay of an employee, and may not exceed 25 percent of such rate of basic pay;
(II)
may not be considered to be part of the basic pay of an employee, and the reduction or elimination of a retention allowance may not be appealed; and
(III)
shall be paid at the same time and in the same manner as the employee’s basic pay is paid.
(ii)
Considerations
In exercising the retention allowance authority described in clause (i), the Geothermal Ombudsman shall consider—
(I)
an employee’s specialized expertise related to geothermal authorizations;
(II)
the demonstrated need to retain an employee to meet the performance improvement objectives for geothermal authorization timelines and develop best practices for completion of geothermal authorizations; and
(III)
the difficulty in recruiting or replacing qualified personnel with relevant expertise related to geothermal authorizations.
(D)
Savings clause
Cross-office personnel assignments carried out under this paragraph shall not alter the underlying jurisdiction of other offices of the Bureau of Land Management over applicable geothermal authorizations.
(d)
Report
The Geothermal Ombudsman shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives an annual report that describes the activities of the Task Force and evaluates the effectiveness of geothermal permit processing during the preceding 1-year period.
7.
Geothermal royalties
(a)
Definitions
Section 2 of the Geothermal Steam Act of 1970 ( 30 U.S.C. 1001 ) is amended by adding at the end the following:
(h)
Geothermal electric generating facility means a facility, including all necessary equipment or structures (including turbines and cooling equipment), that produces electricity using geothermal resources. For purposes of section 5(a)(1), a facility described in the preceding sentence shall be considered a separate facility from any other such facility unless the facility shares a turbine with any other such facility.
(i)
In-service date means, with respect to a geothermal electric generating facility, the date on which the geothermal electric generating facility begins operating.
.
(b)
Geothermal royalties
Section 5(a)(1) of the Geothermal Steam Act of 1970 ( 30 U.S.C. 1004(a)(1) ) is amended—
(1)
in subparagraph (A)—
(A)
by inserting with respect to a geothermal electric generating facility producing electricity from such resources, before not less than ;
(B)
by inserting by the geothermal electric generating facility after produced ; and
(C)
by striking the first 10 years of production under the lease and inserting each year of the 10-year period following the in-service date of the geothermal electric generating facility ; and
(2)
in subparagraph (B)—
(A)
by inserting with respect to a geothermal electric generating facility producing electricity from such resources, before not less than ;
(B)
by inserting by the geothermal electric generating facility after produced ; and
(C)
by striking such 10-year period and inserting the period of 10 years described in subparagraph (A) .
8.
NEPA review
Section 390 of the Energy Policy Act of 2005 ( 42 U.S.C. 15942 ) is amended—
(1)
in subsection (a), by inserting , or the Geothermal Steam Act of 1970 ( 30 U.S.C. 1001 et seq. ) for the purpose of exploration or development of geothermal resources after or gas ; and
(2)
in subsection (b)—
(A)
in paragraph (2), by striking or gas and inserting , gas, or geothermal ; and
(B)
in paragraph (3), by striking or gas and inserting , gas, or geothermal .
Passed the House of Representatives June 2, 2026. Kevin F. McCumber, Clerk.

Tracker

The tracker indicates the progress of this legislation as it moves through the legislative process.

  1. Introduced2025-09-30
  2. Passed House2026-06-02
  3. Passed Senate
  4. Conference
  5. To President
  6. Became Law

CRS Summary

The summaries are the Congressional Research Service’s, one per stage. Read them in full.

Reported to House May 20, 2026

hb5631/reported-to-house.md

Shown Here:
Reported to House (05/20/2026)

Geothermal Ombudsman for National Deployment and Optimal Reviews Act

This bill establishes a geothermal ombudsman and task force to oversee geothermal project permitting and authorizations on federal land.

The Department of the Interior must appoint a geothermal ombudsman from within the Bureau of Land Management (BLM). The ombudsman must act as a liaison among different parts of BLM, provide dispute resolution services between BLM and geothermal project applicants, and facilitate permit processing in different BLM field offices regarding geothermal projects on federal land.

The ombudsman must also lead the Geothermal Permitting Task Force established by this bill. The task force must support the ombudsman’s duties. Through the task force, the ombudsman may reassign employees from other Interior bureaus or offices to assist in the completion of geothermal authorizations. The ombudsman may pay a retention allowance to reassigned employees.

Sponsors

Rep. Jeff Hurd (R) sponsors H.R. 5631, and 5 members have co-sponsored it.

Committees

H.R. 5631 went before 4 committees: Energy and Natural Resources, Public Lands, Forests, and Mining Subcommittee, Natural Resources and Energy and Mineral Resources Subcommittee.

Energy and Natural Resources
Energy and Natural Resources
Markup By · Jul 29, 2026 · 314 Bills
Public Lands, Forests, and Mining Subcommittee
Public Lands, Forests, and Mining Subcommittee
Hearings By (subcommittee) · Jul 15, 2026
Natural Resources
Natural Resources
Reported By · May 20, 2026 · 395 Bills
Energy and Mineral Resources Subcommittee
Energy and Mineral Resources Subcommittee
Discharged from · Mar 5, 2026 · 15 Bills

Reports

1 committee report has been filed on H.R. 5631, the latest H. Rept. 119-660.

  • H. Rept. 119-660 — GEOTHERMAL OMBUDSMAN FOR NATIONAL DEPLOYMENT AND OPTIMAL REVIEWS ACT

Actions

H.R. 5631 has taken 19 actions since Sep 30, 2025, the latest on Jul 29, 2026.

ChamberAction
Jul 29, 2026
Senate
Committee on Energy and Natural Resources. Ordered to be reported without amendment favorably.Energy and Natural Resources Committee
Jul 15, 2026
Senate
Committee on Energy and Natural Resources Subcommittee on Public Lands, Forests, and Mining. Hearings held.Public Lands, Forests, and Mining Subcommittee
Jun 3, 2026
Senate
Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.Energy and Natural Resources Committee
Jun 2, 202615:51
House
Mr. Westerman moved to suspend the rules and pass the bill, as amended.
Jun 2, 202615:51
House
Considered under suspension of the rules. (consideration: CR H3760-3765)

Votes

H.R. 5631 has not gone to a roll call.

1 bill is related to H.R. 5631.

Titles

H.R. 5631 goes by 8 titles, 4 of them short titles.

  • To promote responsible geothermal energy development on public lands, and for other purposes. — Official Titles as Amended by House
  • Geothermal Energy Advancement Act — Display Title
  • Geothermal Energy Advancement Act — Short Titles from RFS (Referred to Senate) bill text
  • To promote responsible geothermal energy development on public lands, and for other purposes. — Official Titles from EH (Engrossed in House) bill text
  • Geothermal Energy Advancement Act — Short Title(s) as Passed House
  • Geothermal Ombudsman for National Deployment and Optimal Reviews Act — Short Title(s) as Reported to House
  • Geothermal Ombudsman for National Deployment and Optimal Reviews Act — Short Title(s) as Introduced
  • To appoint a Geothermal Ombudsman and establish a Geothermal Permitting Task Force from within the Bureau of Land Management, and for other purposes. — Official Title as Introduced

Lobbying

10 clients hired 10 firms and 122 registered lobbyists who named H.R. 5631 in 25 quarterly filings, 2025 to 2026. Reported under the Lobbying Disclosure Act; a filing’s income covers everything its registrant worked that quarter, so the amounts below are the filings’, not this bill’s.

Filed under Budget/Appropriations, Energy/Nuclear, Taxation/Internal Revenue Code, Trade (domestic/foreign), Natural Resources, Agriculture, Environment/Superfund, Labor Issues/Antitrust/Workplace.

Clients

Who paid to be heard, by how many filings named the bill.

ClientBusinessStateFirmsFilingsReported
COBANKColorado16$600K
CORPORATE ENERGY BUYERS ASSOCIATIONDistrict of Columbia15
FERVO ENERGY COMPANYEnhanced Geothermal Energy Company.Texas15
FERVO ENERGYFervo Energy provides advanced geothermal energy 24/7 for major power purchasers.Texas12$180K
ZANSKAR GEOTHERMAL & MINERALS, INC.Issues relating to geothermal energy discovery, development and deployment.Utah12
SIFF & ASSOCIATES, PLLC (OBO THE MECHANICAL CONTRACTORS ASSOCIATION OF AMERICA)Law firmDistrict of Columbia11$40K
CHAMBER OF COMMERCE OF THE U.S.A.District of Columbia11
CHEVRON U.S.A. INC.California11
CITIZENS FOR RESPONSIBLE ENERGY SOLUTIONS, INC.District of Columbia11
UNITED ASSN OF JOURNEYMEN & APPRENTICES OF THE PLUMBING & PIPEFITTING INDUSTRYMaryland11

Firms

Registrants who filed on the bill, by filings.

Lobbyists

Named on the filings that cite the bill. The 20 named most often, of 122.

Filings

The documents themselves, on the Senate’s Lobbying Disclosure site, largest reported first.

ClientRegistrantPeriodReportedDocument
CHAMBER OF COMMERCE OF THE U.S.A.CHAMBER OF COMMERCE OF THE U.S.A.2026 second_quarter$17M2nd Quarter - Report
CHEVRON U.S.A. INC.CHEVRON U.S.A. INC.2026 second_quarter$1.7M2nd Quarter - Report
FERVO ENERGY COMPANYFERVO ENERGY COMPANY2026 second_quarter$1.7M2nd Quarter - Report
FERVO ENERGY COMPANYFERVO ENERGY COMPANY2026 first_quarter$690K1st Quarter - Report
UNITED ASSN OF JOURNEYMEN & APPRENTICES OF THE PLUMBING & PIPEFITTING INDUSTRYUNITED ASSN OF JOURNEYMEN & APPRENTICES OF THE PLUMBING & PIPEFITTING INDUSTRY2026 second_quarter$260K2nd Quarter - Report
CITIZENS FOR RESPONSIBLE ENERGY SOLUTIONS, INC.CITIZENS FOR RESPONSIBLE ENERGY SOLUTIONS, INC.2026 second_quarter$260K2nd Quarter - Report
FERVO ENERGY COMPANYFERVO ENERGY COMPANY2025 fourth_quarter$220K4th Quarter - Report
CORPORATE ENERGY BUYERS ASSOCIATIONCORPORATE ENERGY BUYERS ASSOCIATION2025 fourth_quarter$210K4th Quarter - Report
CORPORATE ENERGY BUYERS ASSOCIATIONCORPORATE ENERGY BUYERS ASSOCIATION2026 second_quarter$200K2nd Quarter - Amendme…
CORPORATE ENERGY BUYERS ASSOCIATIONCORPORATE ENERGY BUYERS ASSOCIATION2026 first_quarter$200K1st Quarter - Report
CORPORATE ENERGY BUYERS ASSOCIATIONCORPORATE ENERGY BUYERS ASSOCIATION2026 second_quarter$190K2nd Quarter - Report
CORPORATE ENERGY BUYERS ASSOCIATIONCORPORATE ENERGY BUYERS ASSOCIATION2026 second_quarter$190K2nd Quarter - Report
FERVO ENERGY COMPANYFERVO ENERGY COMPANY2026 second_quarter$180K2nd Quarter - Amendme…
FERVO ENERGY COMPANYFERVO ENERGY COMPANY2026 first_quarter$170K1st Quarter - Amendme…
COBANKCORNERSTONE GOVERNMENT AFFAIRS, INC.2025 first_quarter$130K1st Quarter - Report
COBANKCORNERSTONE GOVERNMENT AFFAIRS, INC.2025 second_quarter$110K2nd Quarter - Report
ZANSKAR GEOTHERMAL & MINERALS, INC.ZANSKAR GEOTHERMAL & MINERALS, INC.2026 second_quarter$95.4K2nd Quarter - Report
COBANKCORNERSTONE GOVERNMENT AFFAIRS, INC.2026 second_quarter$90K2nd Quarter - Report
COBANKCORNERSTONE GOVERNMENT AFFAIRS, INC.2026 first_quarter$90K1st Quarter - Report
FERVO ENERGYBOUNDARY STONE PARTNERS2025 fourth_quarter$90K4th Quarter - Amendme…

Classification

The Congressional Research Service files H.R. 5631 under Energy, one of its 31 policy areas, and gives it 6 legislative subjects.

CRS Subjects

CRS assigns every bill one policy area from its 31; H.R. 5631’s is Energy.

hr5631/policy-areas.txt
EnergyAgriculture and FoodAnimalsArmed Forces and National SecurityArts, Culture, ReligionCivil Rights and Liberties, Minority IssuesCommerceCongressCrime and Law EnforcementEconomics and Public FinanceEducationEmergency ManagementEnvironmental ProtectionFamiliesFinance and Financial SectorForeign Trade and International FinanceGovernment Operations and PoliticsHealthHousing and Community DevelopmentImmigrationInternational AffairsLabor and EmploymentLawNative AmericansPublic Lands and Natural ResourcesScience, Technology, CommunicationsSocial WelfareSports and RecreationTaxationTransportation and Public WorksWater Resources Development

Legislative Subjects

H.R. 5631 carries 6 of CRS’s legislative subjects, from Advisory bodies to Licensing and registrations.

hr5631/subjects.txt
Advisory bodiesCongressional oversightDepartment of the InteriorEarth sciencesGovernment employee pay, benefits, personnel managementLicensing and registrations

Constitutional authority

The clause the sponsor cites as Congress’s power to enact H.R. 5631, as entered in the Congressional Record.

[Congressional Record Volume 171, Number 160 (Tuesday, September 30, 2025)][House]From the Congressional Record Online through the Government Publishing Office [www.gpo.gov]By Mr. HURD of Colorado:H.R. 5631.Congress has the power to enact this legislation pursuantto the following:Article I, Section 8[Page H4509]

Source: congress.gov · legiscan.com