- H.R. 10171August 27, 2026
- H.R. 10156August 27, 2026
- H.R. 10172August 27, 2026
- H.R. 10160August 27, 2026
- H.R. 10181August 27, 2026
- H.R. 10176August 27, 2026
- H.Res. 1496August 27, 2026
- H.R. 10164August 27, 2026
- H.R. 10170August 27, 2026
- H.Res. 1494August 27, 2026
- H.R. 10163August 27, 2026
- H.R. 10157August 27, 2026
- AdministrationU.S. House
- AgricultureU.S. House
- Agriculture, Nutrition, And ForestryU.S. House
- AppropriationsU.S. House
- Armed ServicesU.S. House
- Banking, Housing, And Urban AffairsU.S. House
- BudgetU.S. House
- Commerce, Science, And TransportationU.S. House
- Education and WorkforceU.S. House
- Energy And CommerceU.S. House
- Energy And Natural ResourcesU.S. House
- Environment And Public WorksU.S. House
- EthicsU.S. House
- FinanceU.S. House
- Financial ServicesU.S. House
- Foreign AffairsU.S. House
- Foreign RelationsU.S. House
- Health, Education, Labor, And PensionsU.S. House
- Homeland SecurityU.S. House
- Homeland Security And Governmental Affa…U.S. House
- Indian AffairsU.S. House
- Indian and Insular AffairsU.S. House
- IntelligenceU.S. House
- JudiciaryU.S. House
- Natural ResourcesU.S. House
- Oversight And Government ReformU.S. House
- Permanent Select IntelligenceU.S. House
- RulesU.S. House
- Rules And AdministrationU.S. House
- Science, Space, And TechnologyU.S. House
- Select IntelligenceU.S. Senate
- Small BusinessU.S. House
- Small Business And EntrepreneurshipU.S. House
- Subcommittee on AviationU.S. House
- Subcommittee on Border Security and Enf…U.S. House
- Subcommittee on Coast Guard and Maritim…U.S. House
- Subcommittee on Commodity Markets, Digi…U.S. House
- Subcommittee on Conservation, Research,…U.S. House
- Subcommittee on Counterterrorism and In…U.S. House
- Subcommittee on Cybersecurity and Infra…U.S. House
- Subcommittee on Disability Assistance a…U.S. House
- Subcommittee on Economic Development, P…U.S. House
- Subcommittee on Economic OpportunityU.S. House
- Subcommittee on Emergency Management an…U.S. House
- Subcommittee on Energy and Mineral Reso…U.S. House
- Subcommittee on Federal LandsU.S. House
- Subcommittee on Forestry and Horticultu…U.S. House
- Subcommittee on General Farm Commoditie…U.S. House
- Subcommittee on HealthU.S. House
- Subcommittee on Highways and TransitU.S. House
- Subcommittee on Livestock, Dairy, and P…U.S. House
- Subcommittee on Nutrition and Foreign A…U.S. House
- Subcommittee on Oversight and Investiga…U.S. House
- Subcommittee on Oversight, Investigatio…U.S. House
- Subcommittee on Railroads, Pipelines, a…U.S. House
- Subcommittee on Transportation and Mari…U.S. House
- Subcommittee on Water Resources and Env…U.S. House
- Subcommittee on Water, Wildlife and Fis…U.S. House
- Transportation And InfrastructureU.S. House
- Veterans' AffairsU.S. House
- Ways And MeansU.S. House

SB 3529
Illinois Senate•Introduced
Summary
SB 3529, “MAKE-READY INFRASTRUCTURE ACT”, was introduced in the Senate on Feb 5, 2026 by Sen. Adriane Johnson (D) with 1 co-sponsor. It was referred to Assignments, and last saw action on May 12, 2026: Added as Co-Sponsor Sen. Sara Feigenholtz.
Record
Text
SB 3529 has 1 co-sponsor.
sb3529/introduced.txtSelect Language×The Illinois General Assembly offers the Google Translate™ service for visitor convenience. In no way should it be considered accurate as to the translation of any content herein.Visitors of the Illinois General Assembly website are encouraged to use other translation services available on the internet.The English language version is always the official and authoritative version of this website.NOTE: To return to the original English language version, select the "Show Original" button on the Google Translate™ menu bar at the top of the window.Choose LanguageEnglishAfrikaansAlbanianArabicArmenianAzerbaijaniBasqueBengaliBosnianCatalanCroatianCzechDanishDutchEsperantoEstonianFilipinoFinnishFrenchGalicianGeorgianGermanGreekGujaratiHaitian CreoleHausaHawaiianHebrewHindiHungarianIcelandicIndonesianInterlinguaInterlingueInuktitutIrishItalianJapaneseJavaneseKannadaKhmerKoreanLatinLatvianLithuanianLuxembourgishMacedonianMalagasyMalayalamMalteseMaoriMarathiMyanmarNepaliNorwegianOdiaPashtoPunjabiRomanianRussianSamoanSangoSanskritSardinianSindhiSinhalaSlovakSlovenianSomaliSouthern SothoSpanishSundaneseSwahiliSwedishTamilTeluguThaiTigrinyaTongaTurkishUkrainianUrduVietnameseWelshXhosaYiddishYorubaZuluPowered by TranslateCloseIllinois General AssemblyTop Navigation BarTranslateLearnSelect General AssemblySearch the 104th General AssemblyEnter search terms for legislation, members, committees, or schedules.ILGA.GOVMobile Top BarSearch the 104th General AssemblyEnter keywords to search the Illinois General Assembly website.Full Text of SB3529HomeLegislationFull TextSB3529 - 104th General AssemblyBill StatusFull TextVotesWitness SlipsSelect MenuBill StatusFull TextVotesWitness SlipsPrinter Friendly VersionIntroducedPrinter Friendly VersionIntroducedOpen PDF104TH GENERAL ASSEMBLYState of Illinois2025 and 2026SB3529Introduced 2/5/2026, by Sen. Adriane JohnsonSYNOPSIS AS INTRODUCED:New ActCreates the Make-Ready Infrastructure Rules Act. Sets forth findings. Defines terms. Provides that an electric utility shall propose a new rule, before the electric utility submits its next Multi-Year Integrated Rate Plan, that authorizes the electric utility to design and deploy all electrical distribution infrastructure on the utility side of the meter for all customers who have installed separately metered or submetered infrastructure to support electric vehicle charging stations, other than charging stations in single-family residences. Provides that an electric utility shall recover its revenue requirement for the design and deployment of such electrical distribution infrastructure through periodic Multi-Year Integrated Rate Plan proceedings or through other methods determined by the Commission by rule. Provides that the Commission shall require an electric utility to provide an accurate and full accounting of all the electric utility's expenses related to electrical distribution infrastructure and shall apply appropriate penalties to an electric utility that is not accurately tracking all expenses. Provides that the new proposed rule, once effective, shall be offered to customers as an alternative to the transmission line extension rules in place as of the effective date of the Act for electric vehicle infrastructure and any customer allowances established under the rule shall be based on the full useful life of the electrical distribution infrastructure. Makes other changes.LRB104 18278 AAS 31718 bA BILL FORSB3529 LRB104 18278 AAS 31718 b1 AN ACT concerning regulation.2 Be it enacted by the People of the State of Illinois,3represented in the General Assembly:4 Section 1. Short title. This Act may be cited as the5Make-Ready Infrastructure Rules Act.6 Section 5. Findings. The General Assembly finds that:7 (1) reducing the cost of building public and fleet8 charging stations will benefit the State of Illinois by9 (i) improving the health and environmental quality of the10 residents of Illinois through reduced pollution, (ii)11 reducing the transportation costs borne by consumers and12 businesses, (iii) shifting the demand for imported13 petroleum to locally produced electricity, and (iv)14 increasing access to charging that is needed to electrify15 the transportation sector, which puts downward pressure on16 electric rates to the benefit of all utility customers;17 and18 (2) it is necessary, in order to remove obstacles to19 building public charging, to change the Commission's20 practice from a practice of authorizing the electrical21 distribution infrastructure that is located on the utility22 side of a meter and that is needed to charge electric23 vehicles on a case-by-case basis to a practice of treatingSB3529 - 2 - LRB104 18278 AAS 31718 b1 the electrical distribution infrastructure and any2 associated design, engineering, and construction work the3 same as other necessary distribution infrastructure in an4 electric utility's Multi-Year Integrated Grid Plan that is5 authorized by the Commission on an ongoing basis.6 Section 10. Definitions. As used in this Act:7 "Commission" means the Illinois Commerce Commission.8 "Electric vehicle" means (i) a battery-powered electric9vehicle that is operated solely by electricity or (ii) a10plug-in hybrid electric vehicle that operates on electricity11and gasoline and has a battery that can be recharged from an12external source.13 "Electric vehicle charging station" means a station that14delivers electricity from a source outside of an electric15vehicle and into one or more electric vehicles.16 "Electrification" means any new use of electricity,17expanded use of electricity, or change in the use of18electricity, including, but not limited to, uses in the19industrial, commercial, agricultural, housing, or20transportation sectors.21 "Electrical distribution infrastructure" means poles,22vaults, service drops, transformers, mounting pads, trenching,23conduit, wire, cable, meters, and other equipment as necessary24and any associated engineering and civil construction work.25 "Electric utility" means an electric utility serving moreSB3529 - 3 - LRB104 18278 AAS 31718 b1than 500,000 customers in this State.2 "Make-ready electrical infrastructure" means any3electrical and construction work that is necessary between the4distribution circuit and the connection point of charging5equipment.6 "Utility side of the meter" means all the equipment,7wires, transformers, and other electrical equipment that8belong to a public utility and are used to deliver electrical9service up to the point of the meter itself.10 Section 15. Provision of make-ready electrical11infrastructure on the utility side of the meter.12 (a) An electric utility shall propose a new rule, before13the electric utility submits its next Multi-Year Integrated14Rate Plan, that authorizes the electric utility to design and15deploy all electrical distribution infrastructure on the16utility side of the meter for all customers who have installed17separately metered or submetered infrastructure to support18electric vehicle charging stations, other than charging19stations in single-family residences. The electric utility20shall recover its revenue requirement for the design and21deployment of such electrical distribution infrastructure22through periodic Multi-Year Integrated Rate Plan proceedings23or through other methods determined by the Commission by rule.24In a Multi-Year Integrated Rate Plan proceeding, the electric25utility's costs shall be treated the same as costs incurred bySB3529 - 4 - LRB104 18278 AAS 31718 b1the electric utility for other necessary distribution2infrastructure.3 (b) The Commission shall require an electric utility to4provide an accurate and full accounting of all the electric5utility's expenses related to electrical distribution6infrastructure under this Section and shall apply appropriate7penalties to an electric utility that is not accurately8tracking all expenses.9 (c) The new rule proposed under this Section, once10effective, shall be offered to customers as an alternative to11the transmission line extension rules in place as of the12effective date of this Act for electric vehicle13infrastructure, and any customer allowances established under14the new rule shall be based on the full useful life of the15electrical distribution infrastructure. The Commission may16revise the policy described in subsection (a) and this17subsection (c) after the completion of the Multi-Year18Integrated Grid Plan of the electric utility following the19Multi-Year Integrated Grid Plan during which the proposal was20filed if the Commission determines that a change in the policy21is necessary to ensure just and reasonable rates for22ratepayers. Electric utilities shall take reasonable efforts23to ensure that any infrastructure built pursuant to this24Section is efficiently sized and operated. Such efforts25include, but are not limited to, considering customers'26reasonably foreseeable load management activities andSB3529 - 5 - LRB104 18278 AAS 31718 b1deploying distributed energy resources.
Creates the Make-Ready Infrastructure Rules Act. Sets forth findings. Defines terms. Provides that an electric utility shall propose a new rule, before the electric utility submits its next Multi-Year Integrated Rate Plan, that authorizes the electric utility to design and deploy all electrical distribution infrastructure on the utility side of the meter for all customers who have installed separately metered or submetered infrastructure to support electric vehicle charging stations, other than charging stations in single-family residences. Provides that an electric utility shall recover its revenue requirement for the design and deployment of such electrical distribution infrastructure through periodic Multi-Year Integrated Rate Plan proceedings or through other methods determined by the Commission by rule. Provides that the Commission shall require an electric utility to provide an accurate and full accounting of all the electric utility's expenses related to electrical distribution infrastructure and shall apply appropriate penalties to an electric utility that is not accurately tracking all expenses. Provides that the new proposed rule, once effective, shall be offered to customers as an alternative to the transmission line extension rules in place as of the effective date of the Act for electric vehicle infrastructure and any customer allowances established under the rule shall be based on the full useful life of the electrical distribution infrastructure. Makes other changes.
Sponsors
Sen. Adriane Johnson (D) sponsors SB 3529, and 1 member has co-sponsored it.
Committees
SB 3529 went before 2 committees: Assignments and Energy and Public Utilities.
History
SB 3529 has taken 8 actions since Feb 5, 2026, the latest on May 12, 2026.
| Chamber | Action | |||
|---|---|---|---|---|
May 12, 2026 | Senate | Added as Co-Sponsor Sen. Sara Feigenholtz | ||
Apr 24, 2026 | Senate | Rule 3-9(a) / Re-referred to Assignments | ||
Mar 27, 2026 | Senate | Rule 2-10 Committee Deadline Established As April 24, 2026 | ||
Mar 13, 2026 | Senate | Rule 2-10 Committee Deadline Established As March 27, 2026 | ||
Feb 17, 2026 | Senate | Assigned to Energy and Public Utilities |
Votes
SB 3529 has not gone to a roll call.
Source: ilga.gov · legiscan.com