SB 3529, “MAKE-READY INFRASTRUCTURE ACT”, was introduced in the Senate on Feb 5, 2026 by Sen. Adriane Johnson (D) with 1 co-sponsor. It was referred to Assignments, and last saw action on May 12, 2026: Added as Co-Sponsor Sen. Sara Feigenholtz.


Record

Text

SB 3529 has 1 co-sponsor.

sb3529/introduced.txt
Select Language
×
The Illinois General Assembly offers the Google Translate™ service for visitor convenience. In no way should it be considered accurate as to the translation of any content herein.
Visitors of the Illinois General Assembly website are encouraged to use other translation services available on the internet.
The English language version is always the official and authoritative version of this website.
NOTE: To return to the original English language version, select the "Show Original" button on the Google Translate™ menu bar at the top of the window.
Choose Language
English
Afrikaans
Albanian
Arabic
Armenian
Azerbaijani
Basque
Bengali
Bosnian
Catalan
Croatian
Czech
Danish
Dutch
Esperanto
Estonian
Filipino
Finnish
French
Galician
Georgian
German
Greek
Gujarati
Haitian Creole
Hausa
Hawaiian
Hebrew
Hindi
Hungarian
Icelandic
Indonesian
Interlingua
Interlingue
Inuktitut
Irish
Italian
Japanese
Javanese
Kannada
Khmer
Korean
Latin
Latvian
Lithuanian
Luxembourgish
Macedonian
Malagasy
Malayalam
Maltese
Maori
Marathi
Myanmar
Nepali
Norwegian
Odia
Pashto
Punjabi
Romanian
Russian
Samoan
Sango
Sanskrit
Sardinian
Sindhi
Sinhala
Slovak
Slovenian
Somali
Southern Sotho
Spanish
Sundanese
Swahili
Swedish
Tamil
Telugu
Thai
Tigrinya
Tonga
Turkish
Ukrainian
Urdu
Vietnamese
Welsh
Xhosa
Yiddish
Yoruba
Zulu
Powered by Translate
Close
Illinois General Assembly
Top Navigation Bar
Translate
Learn
Select General Assembly
Search the 104th General Assembly
Enter search terms for legislation, members, committees, or schedules.
ILGA.GOV
Mobile Top Bar
Search the 104th General Assembly
Enter keywords to search the Illinois General Assembly website.
Full Text of SB3529
Home
Legislation
Full Text
SB3529 - 104th General Assembly
Bill Status
Full Text
Votes
Witness Slips
Select Menu
Bill Status
Full Text
Votes
Witness Slips
Printer Friendly Version
Introduced
Printer Friendly Version
Introduced
Open PDF
104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026
SB3529
Introduced 2/5/2026, by Sen. Adriane Johnson
SYNOPSIS AS INTRODUCED:
New Act
Creates the Make-Ready Infrastructure Rules Act. Sets forth findings. Defines terms. Provides that an electric utility shall propose a new rule, before the electric utility submits its next Multi-Year Integrated Rate Plan, that authorizes the electric utility to design and deploy all electrical distribution infrastructure on the utility side of the meter for all customers who have installed separately metered or submetered infrastructure to support electric vehicle charging stations, other than charging stations in single-family residences. Provides that an electric utility shall recover its revenue requirement for the design and deployment of such electrical distribution infrastructure through periodic Multi-Year Integrated Rate Plan proceedings or through other methods determined by the Commission by rule. Provides that the Commission shall require an electric utility to provide an accurate and full accounting of all the electric utility's expenses related to electrical distribution infrastructure and shall apply appropriate penalties to an electric utility that is not accurately tracking all expenses. Provides that the new proposed rule, once effective, shall be offered to customers as an alternative to the transmission line extension rules in place as of the effective date of the Act for electric vehicle infrastructure and any customer allowances established under the rule shall be based on the full useful life of the electrical distribution infrastructure. Makes other changes.
LRB104 18278 AAS 31718 b
A BILL FOR
SB3529 LRB104 18278 AAS 31718 b
AN ACT concerning regulation.
Be it enacted by the People of the State of Illinois,
represented in the General Assembly:
Section 1. Short title. This Act may be cited as the
Make-Ready Infrastructure Rules Act.
Section 5. Findings. The General Assembly finds that:
(1) reducing the cost of building public and fleet
charging stations will benefit the State of Illinois by
(i) improving the health and environmental quality of the
residents of Illinois through reduced pollution, (ii)
reducing the transportation costs borne by consumers and
businesses, (iii) shifting the demand for imported
petroleum to locally produced electricity, and (iv)
increasing access to charging that is needed to electrify
the transportation sector, which puts downward pressure on
electric rates to the benefit of all utility customers;
and
(2) it is necessary, in order to remove obstacles to
building public charging, to change the Commission's
practice from a practice of authorizing the electrical
distribution infrastructure that is located on the utility
side of a meter and that is needed to charge electric
vehicles on a case-by-case basis to a practice of treating
SB3529 - 2 - LRB104 18278 AAS 31718 b
the electrical distribution infrastructure and any
associated design, engineering, and construction work the
same as other necessary distribution infrastructure in an
electric utility's Multi-Year Integrated Grid Plan that is
authorized by the Commission on an ongoing basis.
Section 10. Definitions. As used in this Act:
"Commission" means the Illinois Commerce Commission.
"Electric vehicle" means (i) a battery-powered electric
vehicle that is operated solely by electricity or (ii) a
plug-in hybrid electric vehicle that operates on electricity
and gasoline and has a battery that can be recharged from an
external source.
"Electric vehicle charging station" means a station that
delivers electricity from a source outside of an electric
vehicle and into one or more electric vehicles.
"Electrification" means any new use of electricity,
expanded use of electricity, or change in the use of
electricity, including, but not limited to, uses in the
industrial, commercial, agricultural, housing, or
transportation sectors.
"Electrical distribution infrastructure" means poles,
vaults, service drops, transformers, mounting pads, trenching,
conduit, wire, cable, meters, and other equipment as necessary
and any associated engineering and civil construction work.
"Electric utility" means an electric utility serving more
SB3529 - 3 - LRB104 18278 AAS 31718 b
than 500,000 customers in this State.
"Make-ready electrical infrastructure" means any
electrical and construction work that is necessary between the
distribution circuit and the connection point of charging
equipment.
"Utility side of the meter" means all the equipment,
wires, transformers, and other electrical equipment that
belong to a public utility and are used to deliver electrical
service up to the point of the meter itself.
Section 15. Provision of make-ready electrical
infrastructure on the utility side of the meter.
(a) An electric utility shall propose a new rule, before
the electric utility submits its next Multi-Year Integrated
Rate Plan, that authorizes the electric utility to design and
deploy all electrical distribution infrastructure on the
utility side of the meter for all customers who have installed
separately metered or submetered infrastructure to support
electric vehicle charging stations, other than charging
stations in single-family residences. The electric utility
shall recover its revenue requirement for the design and
deployment of such electrical distribution infrastructure
through periodic Multi-Year Integrated Rate Plan proceedings
or through other methods determined by the Commission by rule.
In a Multi-Year Integrated Rate Plan proceeding, the electric
utility's costs shall be treated the same as costs incurred by
SB3529 - 4 - LRB104 18278 AAS 31718 b
the electric utility for other necessary distribution
infrastructure.
(b) The Commission shall require an electric utility to
provide an accurate and full accounting of all the electric
utility's expenses related to electrical distribution
infrastructure under this Section and shall apply appropriate
penalties to an electric utility that is not accurately
tracking all expenses.
(c) The new rule proposed under this Section, once
effective, shall be offered to customers as an alternative to
the transmission line extension rules in place as of the
effective date of this Act for electric vehicle
infrastructure, and any customer allowances established under
the new rule shall be based on the full useful life of the
electrical distribution infrastructure. The Commission may
revise the policy described in subsection (a) and this
subsection (c) after the completion of the Multi-Year
Integrated Grid Plan of the electric utility following the
Multi-Year Integrated Grid Plan during which the proposal was
filed if the Commission determines that a change in the policy
is necessary to ensure just and reasonable rates for
ratepayers. Electric utilities shall take reasonable efforts
to ensure that any infrastructure built pursuant to this
Section is efficiently sized and operated. Such efforts
include, but are not limited to, considering customers'
reasonably foreseeable load management activities and
SB3529 - 5 - LRB104 18278 AAS 31718 b
deploying distributed energy resources.

Creates the Make-Ready Infrastructure Rules Act. Sets forth findings. Defines terms. Provides that an electric utility shall propose a new rule, before the electric utility submits its next Multi-Year Integrated Rate Plan, that authorizes the electric utility to design and deploy all electrical distribution infrastructure on the utility side of the meter for all customers who have installed separately metered or submetered infrastructure to support electric vehicle charging stations, other than charging stations in single-family residences. Provides that an electric utility shall recover its revenue requirement for the design and deployment of such electrical distribution infrastructure through periodic Multi-Year Integrated Rate Plan proceedings or through other methods determined by the Commission by rule. Provides that the Commission shall require an electric utility to provide an accurate and full accounting of all the electric utility's expenses related to electrical distribution infrastructure and shall apply appropriate penalties to an electric utility that is not accurately tracking all expenses. Provides that the new proposed rule, once effective, shall be offered to customers as an alternative to the transmission line extension rules in place as of the effective date of the Act for electric vehicle infrastructure and any customer allowances established under the rule shall be based on the full useful life of the electrical distribution infrastructure. Makes other changes.

Sponsors

Sen. Adriane Johnson (D) sponsors SB 3529, and 1 member has co-sponsored it.

Committees

SB 3529 went before 2 committees: Assignments and Energy and Public Utilities.

Assignments
Assignments
Referred to · Feb 5, 2026
Energy and Public Utilities
Energy and Public Utilities
Referred to · Feb 17, 2026

History

SB 3529 has taken 8 actions since Feb 5, 2026, the latest on May 12, 2026.

ChamberAction
May 12, 2026
Senate
Added as Co-Sponsor Sen. Sara Feigenholtz
Apr 24, 2026
Senate
Rule 3-9(a) / Re-referred to Assignments
Mar 27, 2026
Senate
Rule 2-10 Committee Deadline Established As April 24, 2026
Mar 13, 2026
Senate
Rule 2-10 Committee Deadline Established As March 27, 2026
Feb 17, 2026
Senate
Assigned to Energy and Public Utilities

Votes

SB 3529 has not gone to a roll call.


Source: ilga.gov · legiscan.com