S. 5074

U.S. SenateIn Senate Committee

Summary

S. 5074, the Enhancing Electric Grid Resilience Act, was introduced in the Senate on Jul 22, 2026 by Sen. Peter Welch (D). It was referred to Energy And Natural Resources, and last saw action on Jul 22, 2026: Read twice and referred to the Committee on Energy and Natural Resources.


Record

Text

S. 5074 has no co-sponsors and has not gone to a roll call.

s5074/introduced-in-senate.txt
119 S5074 IS: Enhancing Electric Grid Resilience Act
U.S. Senate
2026-07-22
text/xml
EN
Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain.
II 119th CONGRESS 2d Session S. 5074 IN THE SENATE OF THE UNITED STATES July 22, 2026 Mr. Welch introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources A BILL
To amend the Federal Power Act to authorize the allocation of the costs of certain interstate electric power transmission lines and electric power transmission lines that are located offshore, and for other purposes.
1.
Short title
This Act may be cited as the Enhancing Electric Grid Resilience Act .
2.
Allocation of costs of certain transmission facilities
Part II of the Federal Power Act ( 16 U.S.C. 824 et seq. ) is amended by adding at the end the following:
224.
Allocation of costs of certain transmission facilities
(a)
Allocation of costs
(1)
In general
Any entity that proposes to own, control, or operate a transmission facility of national significance may file a tariff with the Commission in accordance with section 205 and the regulations of the Commission allocating the costs of such transmission facility of national significance.
(2)
Cost causation principle
The Commission shall require that any tariff filed under paragraph (1) allocate the costs of a transmission facility of national significance to customers within the applicable transmission planning region or regions in a manner that is at least roughly commensurate with the estimated anticipated benefits described in paragraph (3).
(3)
Cost allocation principle
The Commission shall require that any tariff filed under paragraph (1) allocate costs based on the broad range of reliability, economic, public policy, resilience, environmental, and other reasonably anticipated benefits of the applicable transmission facility of national significance.
(b)
Transmission facility of national significance
In this section, the term transmission facility of national significance means—
(1)
an interstate electric power transmission line (and any facilities necessary for the operation of such electric power transmission line) or an electric power transmission line that is located offshore (and any facilities necessary for the operation of such electric power transmission line)—
(A)
that has a transmission capacity of not less than 1,000 megawatts; and
(B)
the construction of which is completed on or after the date of enactment of this section; or
(2)
an expansion of, or upgrade to, an interstate electric power transmission line (and any facilities necessary for the operation of such electric power transmission line) or an electric power transmission line that is located offshore (and any facilities necessary for the operation of such electric power transmission line) that—
(A)
increases the transmission capacity of such electric power transmission line by at least 500 megawatts; and
(B)
is completed on or after the date of enactment of this section.
(c)
Savings provision
This section does not affect the authority of the Commission to approve the allocation of costs of transmission facilities other than transmission facilities of national significance.
.

Tracker

The tracker indicates the progress of this legislation as it moves through the legislative process.

  1. Introduced2026-07-22
  2. Passed Senate
  3. Passed House
  4. Conference
  5. To President
  6. Became Law

A bill to amend the Federal Power Act to authorize the allocation of the costs of certain interstate electric power transmission lines and electric power transmission lines that are located offshore, and for other purposes.

Sponsors

Sen. Peter Welch (D) sponsors S. 5074 alone.

Committees

S. 5074 went before 1 committee: Energy and Natural Resources.

Energy and Natural Resources
Energy and Natural Resources
Referred To · Jul 22, 2026 · 314 Bills

Actions

S. 5074 has taken 2 actions since Jul 22, 2026.

ChamberAction
Jul 22, 2026
Senate
Read twice and referred to the Committee on Energy and Natural Resources.Energy and Natural Resources Committee
Jul 22, 2026
Introduced in Senate

Votes

S. 5074 has not gone to a roll call.

1 bill is related to S. 5074.

Titles

S. 5074 goes by 3 titles, 1 of them short titles.

  • Enhancing Electric Grid Resilience Act — Display Title
  • Enhancing Electric Grid Resilience Act — Short Title(s) as Introduced
  • A bill to amend the Federal Power Act to authorize the allocation of the costs of certain interstate electric power transmission lines and electric power transmission lines that are located offshore, and for other purposes. — Official Title as Introduced

Classification

The Congressional Research Service files S. 5074 under Energy, one of its 31 policy areas.

CRS Subjects

CRS assigns every bill one policy area from its 31; S. 5074’s is Energy.

s5074/policy-areas.txt
EnergyAgriculture and FoodAnimalsArmed Forces and National SecurityArts, Culture, ReligionCivil Rights and Liberties, Minority IssuesCommerceCongressCrime and Law EnforcementEconomics and Public FinanceEducationEmergency ManagementEnvironmental ProtectionFamiliesFinance and Financial SectorForeign Trade and International FinanceGovernment Operations and PoliticsHealthHousing and Community DevelopmentImmigrationInternational AffairsLabor and EmploymentLawNative AmericansPublic Lands and Natural ResourcesScience, Technology, CommunicationsSocial WelfareSports and RecreationTaxationTransportation and Public WorksWater Resources Development

Source: congress.gov · legiscan.com