Search

Search bills, members, committees and pages...

HB 589

Louisiana HouseIn House Committee

Summary

HB 589, which requires a five hundred foot setback for carbon dioxide pipelines, was introduced in the House on Feb 26, 2026 by Rep. Les Farnum (R). It was referred to Natural Resources and Environment, and last saw action on Mar 9, 2026: Read by title, under the rules, referred to the Committee on Natural Resources and Environment.


Record

Text

HB 589 has no co-sponsors and has not gone to a roll call.

hb589/introduced.txt
HLS 26RS-515 ORIGINAL
2026 Regular Session
HOUSE BILL NO. 589
BY REPRESENTATIVE FARNUM
ENERGY/PIPELINES: Requires a five hundred foot setback for carbon dioxide pipelines
AN ACT
To amend and reenact R.S. 30:1113, relative to siting requirements; to add a setback for
construction of carbon dioxide transport pipelines; and to provide for related matters.
Be it enacted by the Legislature of Louisiana:
Section 1. R.S. 30:1113 is hereby amended and reenacted to read as follows:
§1113. Siting requirements
A. No Class VI injection wellhead shall be located within five hundred feet
of the following:
(1) Inhabited dwellings not owned by the storage operator or any owner in
interest bound by a contract with the storage operator that allows for location of a
Class VI injection well within five hundred feet of an inhabited dwelling.
(2) Schools.
(3) Healthcare facilities.
B. No pipeline for transport of carbon dioxide shall be constructed within
five hundred feet of the following:
(1) Inhabited dwellings.
(2) Schools.
(3) Healthcare facilities.
Page 1 of 2
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.
HLS 26RS-515 ORIGINAL
HB NO. 589
DIGEST
The digest printed below was prepared by House Legislative Services. It constitutes no part
of the legislative instrument. The keyword, one-liner, abstract, and digest do not constitute
part of the law or proof or indicia of legislative intent. [R.S. 1:13(B) and 24:177(E)]
HB 589 Original 2026 Regular Session Farnum
Abstract: Adds a five hundred foot setback for construction of carbon dioxide transport
pipelines in certain areas.
Present law prohibits Class VI injection wellheads from being located within 500 ft. of
inhabited dwellings, schools, and healthcare facilities.
Proposed law retains present law and adds a prohibition for construction of pipelines for
transport of carbon dioxide within 500 ft. of inhabited dwellings, schools, and healthcare
facilities.
(Amends R.S. 30:1113)
Page 2 of 2
CODING: Words in struck through type are deletions from existing law; words underscored
are additions.

Requires a five hundred foot setback for carbon dioxide pipelines

Sponsors

Rep. Les Farnum (R) sponsors HB 589 alone.

Committees

HB 589 went before 1 committee: Natural Resources and Environment.

Natural Resources and Environment
Natural Resources and Environment
Referred to · Feb 26, 2026 · 37 Bills

History

HB 589 has taken 4 actions since Feb 26, 2026, the latest on Mar 9, 2026.

ChamberAction
Mar 9, 2026
House
Read by title, under the rules, referred to the Committee on Natural Resources and Environment.
Feb 27, 2026
House
First appeared in the Interim Calendar on 2/27/2026.
Feb 26, 2026
House
Prefiled.
Feb 26, 2026
House
Under the rules, provisionally referred to the Committee on Natural Resources and Environment.

Votes

HB 589 has not gone to a roll call.


Source: legis.la.gov · legiscan.com