HJR 75

Kentucky HouseSigned by Governor

Summary

HJR 75, “A JOINT RESOLUTION relating to road projects”, was introduced in the House on Mar 3, 2026 by Rep. Jason Petrie (R) with 3 co-sponsors. It last saw action on Apr 13, 2026: signed by Governor (Acts Ch. 144).


Record

Text

HJR 75 has 3 co-sponsors and 3 roll calls.

hjr75/chaptered.txt
CHAPTER 144 1
CHAPTER 144
( HJR 75 )
A JOINT RESOLUTION relating to road projects.
Be it resolved by the General Assembly of the Commonwealth of Kentucky:
Section 1. Notwithstanding KRS 48.110, 48.300, and 176.430, this Joint Resolution in conjunction with
2026 Regular Session HB 502 and 2026 Regular Session HJR 76 shall constitute the Six-Year Road Plan. The last
four years of the Six-Year Road Plan are as follows:
Signed by Governor April 13, 2026.
Legislative Research Commission PDF Version
2 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Adair 10047 KY-80 BRIDGE PROJECT IN ADAIR COUNTY ON PL
(001B00013N) KY-80 AT RUSSELL DN BRX 354,203
CREEK RW
UT
CN BRX 2,361,352
Project Cost: 0 0 2,715,555 0
Adair 22208 LN-9008 ADDRESS CONDITION OF Louie B. Nunn PL
Cumberland Parkway FROM MILEPOINT DN NHPM 730,000
48.15 TO MILEPOINT 57.791 RW
UT
CN NHPM 7,329,876
Project Cost: 0 0 8,059,876 0
Adair 80003 KY-55 KY 55 NEW TURNING LANE AT BETTY'S PL
OK COUNTRY COOKING. (18CCN) DN SPP 450,000
(2020CCR) (2022CCR) (2024CCR) RW SPP 1,420,000
UT SPP 1,880,000
CN SPP 4,330,000
Project Cost: 450,000 1,420,000 1,880,000 4,330,000
Adair 80200 KY-55 IMPROVE SAFETY AND MOBILITY ALONG PL
KY 55 NEAR DOC'S MARKET. (2022CCN) DN SPP 400,000
(2024CCR) RW SPP 1,260,000
UT SPP 1,730,000
CN SPP 4,040,000
Project Cost: 400,000 1,260,000 1,730,000 4,040,000
Adair 80351 KY-55 Provide access into Green River PL
Commerce Park along KY 55 to promote DN SPP 200,000
economic growth in Adair County. (MP RW SPP 790,000
16.6-16.75) (2024CCN) UT SPP 8,100,000
CN SPP 1,570,000
Project Cost: 200,000 790,000 8,100,000 1,570,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 3
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Adair 80352 KY-55 Improve mobility and congestion along KY PL
55 from US 127 in Russell County to the DN SPP 7,560,000
Louis B. Nunn Cumberland KY 55/KY6177 RW SPP 16,700,000
in Adair County. (Russell MP 0.0 - 8.159; UT SPP 11,230,000
Adair MP 0.0 - 9.68) (2024CCN)
CN SPP 104,930,000
Project Cost: 7,560,000 27,930,000 0 104,930,000
Adair 80411 KY-55 Improve horizontal and vertical geometrics PL
along KY 55 from 0.113 mile South of Tom DN
Andrews Rd to 0.107 mile North of Tom RW
Andrews Rd. (MP 8.631 to 8.85) UT
CN SPP 1,320,000
Project Cost: 1,320,000 0 0 0
Adair 80412 KY-61 Reconstruction KY 61 from Columbia PL
Bypass (KY 55) to Green County Line. DN
See Alternate 4 Priority Section in RW SPP 7,532,000
December 2002 scoping study. (MP UT SPP 3,000,000
12.213 to 19.745)
CN SPP 30,000,000
Project Cost: 0 7,532,000 3,000,000 30,000,000
Adair 80413 PF-9999 The proposed roadway would help PL
alleviate traffic on existing KY 206, DN SPP 2,700,000
KY3491, as well as traffic thru town on RW SPP 3,300,000
KY 55X and KY80. Eastern Columbia UT SPP 3,000,000
Bypass
CN SPP 30,000,000
Project Cost: 2,700,000 3,300,000 3,000,000 30,000,000
Total for Adair county PL
DN 11,310,000 1,084,203
RW 31,002,000
UT 11,230,000 17,710,000
CN 1,320,000 9,691,228 174,870,000
Total Amounts: 12,630,000 42,232,000 28,485,431 174,870,000
4 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Allen 8802 KY-100 WIDENING OF KY 100 (FRANKLIN ROAD) PL
TO 3 LANES WITH URBAN SECTION FROM DN
OLIVER STREET TO US 31E TO INCREASE RW SPP 610,000
CAPACITY/SAFETY. MP 11.800-12.700 UT SPP 580,000
(14CCN)(18CCN) (2020CCR) (2024CCR)
CN SPP 720,000
Project Cost: 1,190,000 720,000 0 0
Allen 10028 CR-1220 BRIDGE PROJECT IN ALLEN COUNTY ON PL
(002C00033N) PETROLEUM RD AT LITTLE DN FBP2 152,273
TRAMMEL CREEK RW
UT
CN FBP2 1,015,151
Project Cost: 0 0 0 1,167,424
Allen 20039 US-231, ADDRESS CONDITION OF US-231 FROM PL
US-31 MILEPOINT 0 TO MILEPOINT 8.569 DN STP5 880,000
RW
UT
CN STP5 10,120,000
Project Cost: 0 11,000,000 0 0
Allen 80207 KY-101 Improve safety on KY 101 from KY 234 to PL
the Warren County Line. (2022CCN) DN
(2024CCR) RW STP2 2,200,000
UT STP2 2,510,000
CN STP2 17,290,000
Project Cost: 4,710,000 17,290,000 0 0
Allen 80308 KY-100 IMPROVE SAFETY AND REDUCE PL
CONGESTION ALONG KY 100 (OLD DN SPP 526,000
GALLATIN RD) FROM THE INTERSECTION RW SPP 563,000
WITH WOODLAND CIRCLE DRIVE TO UT SPP 1,184,000
JOHN KELLY DRIVE IN SCOTTSVILLE.
CN SPP 1,974,000
Project Cost: 526,000 563,000 1,184,000 1,974,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 5
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Allen 80315 KY-101 RECONSTRUCTION/NEW CONSTRUCTION PL
OF TWO-LANE ROADWAY WITH DN SPP 9,120,000
SHOULDERS AND WIDER BRIDGES. RW SPP 10,546,000
(2024CCN) UT SPP 7,184,000
CN SPP 90,785,000
Project Cost: 9,120,000 17,730,000 0 90,785,000
Allen 80353 KY-100 Construct roundabout intersection at KY PL
100 and KY 3500 (Old Gallatin DN
Road/Franklin Road) (MP 13.05-13.15) RW SPP 250,000
(2024CCN) UT SPP 500,000
CN SPP 1,300,000
Project Cost: 250,000 500,000 1,300,000 0
Total for Allen county PL
DN 9,646,000 880,000 152,273
RW 3,060,000 11,109,000
UT 3,090,000 7,684,000 1,184,000
CN 28,130,000 1,300,000 93,774,151
Total Amounts: 15,796,000 47,803,000 2,484,000 93,926,424
Anderson 806 KY-151 IMPROVE KY 151 FROM US 127 AT PL
LAWRENCEBURG TO I-64 IN FRANKLIN DN
COUNTY. (2020CCN) (2024CCR) RW
UT SPP 420,000
CN SPP 1,800,000
Project Cost: 420,000 1,800,000 0 0
Anderson 8100.1000 US-62 WIDENING WITH ACCESS IMPROVEMENTS PL
TO ANDERSON CROSSING ON US62, DN
FROM 0.2MI W OF CORPORATE DR TO RW
US127B (LAWRENCEBURG BYPASS). UT STP1 4,160,000
PRIORITY SECTION (2016BOP) (2024CCN)
CN STP1 6,760,000
Project Cost: 0 4,160,000 6,760,000 0
6 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Anderson 10069 CR-1235 ADDRESS DEFICIENCIES OF BRIDGE ON E PL
BURGIN ROAD OVER LITTLE WILLOW DN BRZ 129,798
CREEK (003C00040N) RW
UT
CN BRZ 865,318
Project Cost: 995,116 0 0 0
Anderson 80001 US-62 IMPROVE US-62 (VERSAILLES RD.) FROM PL
HILLTOP DR. TO WEST END OF BRIDGE DN
OVER KENTUCKY RIVER AT RW
TYRONE(18CCN) (2020CCR) (2022CCR) UT
(2024CCR)
CN STP2 15,610,000
Project Cost: 15,610,000 0 0 0
Anderson 80406 US-127 Improve the intersection of US 127 at PL
Hawthorne Lane in Anderson County. DN SPP 150,000
RW
UT
CN SPP 350,000
Project Cost: 500,000 0 0 0
Anderson 80407 KY-44 Improve intersection on KY 44 to Scenic PL
Gardens Drive & Nautical Way in DN SPP 150,000
Lawrenceburg. RW SPP 100,000
UT SPP 250,000
CN SPP 500,000
Project Cost: 150,000 100,000 250,000 500,000
Total for Anderson county PL
DN 429,798
RW 100,000
UT 420,000 4,160,000 250,000
CN 16,825,318 1,800,000 6,760,000 500,000
Total Amounts: 17,675,116 6,060,000 7,010,000 500,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 7
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Ballard 118 US-60 Improve US-60 from Humphrey Creek PL
bridge to 0.4 mi west of Hester Sullivan DN
Lane. (02CCR) (2020CCR) (2022CCR) RW
(2024CCR) UT
CN NH 9,500,000
Project Cost: 9,500,000 0 0 0
Ballard 1140 US-51 CONSTRUCT NEW STRUCTURE OVER THE PL
OHIO RIVER AT CAIRO, ILLINOIS DN BRO2 2,500,000
(KENTUCKY'S SHARE)(004B00021N) RW
UT BRO2 256,000
CN BRO2 80,949,000 80,949,000 80,949,000 80,949,000
Project Cost: 83,705,000 80,949,000 80,949,000 80,949,000
Ballard 80300 US-60 ADDRESS CONDITION, SAFETY, PL
CONGESTION, AND FUTURE CAPACITY DN
ISSUES ON US-60 THROUGH THE CITY OF RW
LACENTER. (2024CCN) UT NH 1,500,000
CN NH 27,840,000
Project Cost: 29,340,000 0 0 0
Ballard 80301 US-60 ADDRESS CONDITION, SAFETY, PL
CONGESTION, AND FUTURE CAPACITY DN NH 2,000,000
FROM PROPOSED BARLOW EASTERN RW NH 2,500,000
BYPASS TO PROPOSED LACENTER UT NH 3,250,000
SOUTHERN BYPASS. (2024CCN)
CN NH 12,000,000
Project Cost: 2,000,000 0 5,750,000 12,000,000
Ballard 80320 US-51 THE PURPOSE OF THIS PROJECT IS TO PL
PROVIDE ROADWAY INFRASTRUCTURE DN
TO SUPPORT COMMUNITY RW SPP 400,000
GROWTH/DEVELOPMENT AND SAFE UT SPP 400,000
ACCESS FOR FREIGHT TRAFFIC TO
CN SPP 2,000,000
Project Cost: 800,000 0 2,000,000 0
8 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Ballard 80321 US-60 ADDRESS CONDITION, SAFETY AND PL
CONGESTION ISSUES ON US 60 DN NH 1,500,000
THROUGH THE CITY OF BARLOW. RW NH 2,500,000
(2024CCN) UT NH 1,050,000
CN NH 8,400,000
Project Cost: 1,500,000 0 3,550,000 8,400,000
Ballard 80322 KY-286 IMPROVE GEOMETRIC DEFICIENCIES, PL
FREIGHT TRUCK MOBILITY, AND IMPROVE DN
SAFETY ON KY 286 FROM HERSHEL RW SPP 3,700,000
JONES ROAD TO KY 473. (2024CCN) UT SPP 500,000
CN SPP 2,000,000
Project Cost: 4,200,000 2,000,000 0 0
Ballard 80413 US-60 Improve safety, truck, and future traffic PL
operations on US 60 from Shawnee Creek DN SPP 1,000,000
to Ballard Elementary School. (MP 5.87 to RW SPP 1,500,000
9.751) UT SPP 500,000
CN SPP 4,800,000
Project Cost: 1,000,000 1,500,000 500,000 4,800,000
Ballard 80414 KY-286 Minor widening of KY 286 from KY 473 to PL
Bethel Church Road to improve safety, DN SPP 400,000
truck mobility, and geometrics (MP 11.108 RW SPP 300,000
to 11.956) UT SPP 225,000
CN SPP 1,500,000
Project Cost: 400,000 300,000 225,000 1,500,000
Total for Ballard county PL
DN 7,400,000
RW 4,100,000 1,800,000 5,000,000
UT 2,656,000 5,025,000
CN 118,289,000 82,949,000 82,949,000 107,649,000
Total Amounts: 132,445,000 84,749,000 92,974,000 107,649,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 9
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Barren 10030 KY-740 BRIDGE PROJECT IN BARREN COUNTY PL
ON (005B00046N) KY-740 AT BLUE DN BRX 223,534
SPRINGS CREEK RW
UT
CN BRX 1,490,228
Project Cost: 0 0 0 1,713,762
Barren 10059 KY-3179 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-3179 OVER PETER CREEK DN BRZ 241,608
(005B00090N) RW
UT
CN BRZ 1,610,719
Project Cost: 0 0 0 1,852,327
Barren 22061 I -65 ADDRESS CONDITION OF I-065 FROM PL
MILEPOINT 48 TO MILEPOINT 53.3 (53.2 DN NHPM 760,000
CARDINAL) RW
UT
CN NHPM 7,643,500
Project Cost: 0 0 8,403,500 0
Barren 22063 I -65 ADDRESS CONDITION OF I-065 FROM PL
MILEPOINT 53.2 (53.3 NON-CARDINAL) TO DN NHPM 130,000
MILEPOINT 53.956 RW
UT
CN NHPM 1,300,000
Project Cost: 1,430,000 0 0 0
Barren 80002 LN-9008 NEW INTERCHANGE ON THE LOUIE NUNN PL
CUMBERLAND PARKWAY AT KY DN SPP 2,030,000
(CONTINGENT ON ECONOMIC RW SPP 3,020,000
DEVELOPMENT PROJECTS)-249 IN UT SPP 1,060,000
GLASGOW(18CCN) (2022CCR)
CN SPP 23,390,000
Project Cost: 2,030,000 4,080,000 23,390,000 0
10 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Barren 80300 LN-9008 REDUCE CONGESTION AND INCREASE PL
MOBILITY ON US 31E FROM ABERDEEN DN
DRIVE TO TROJAN TRAIL, INCLUDING RW SPP 330,000
RECONSTRUCTION OF THE INTERCHANGE UT SPP 1,860,000
WITH LN 9008. (2024CCN)
CN SPP 14,800,000 10,000,000
Project Cost: 330,000 1,860,000 14,800,000 10,000,000
Barren 80319 US-31 IMPROVE SAFETY AND MOBILITY ON PL
US-31E IN THE HAYWOOD AREA. DN NH 620,000
(2024CCN) RW NH 650,000
UT NH 620,000
CN NH 4,960,000
Project Cost: 620,000 650,000 620,000 4,960,000
Barren 80352 KY-3600 Addition of southbound left turn lane and PL
northbound right turn lane at new DN
Southern States facility on KY 3600 (MP RW
1.95). (2024CCN) UT
CN SPP 190,000
Project Cost: 190,000 0 0 0
Total for Barren county PL
DN 2,780,000 760,000 465,142
RW 330,000 3,670,000
UT 2,920,000 620,000
CN 1,490,000 45,833,500 18,060,947
Total Amounts: 4,600,000 6,590,000 47,213,500 18,526,089
Bath 193 KY-111 RECONSTRUCT KY-111 IN THE VICINITY PL
OF THE "S-CURVE" EAST OF DN SPP 380,000
OWINGSVILLE (14CCR) (2022CCN) RW SPP 2,300,000
(2024CCR) UT SPP 1,960,000
CN SPP 7,840,000
Project Cost: 380,000 2,300,000 1,960,000 7,840,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 11
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Bath 8404 KY-965 RECONSTRUCT CURVE AT .8 MILE SOUTH PL
OF KY-36 (08CCN)(12CCR) MILEPOINT DN SPP 270,000
7.147 TO 7.247) (2022CCN) RW SPP 580,000
UT SPP 350,000
CN SPP 3,100,000
Project Cost: 270,000 930,000 3,100,000 0
Bath 8814 KY-36 CORRECT HORIZONTAL AND WIDTH PL SPP 400,000
DEFICIENCIES ON KY 36 FROM "OLD KY DN SPP 3,640,000
11" MP 1.004 TO KY 1325 (MP 6.97) TO RW SPP 5,750,000
IMPROVE SAFETY AND OPERATIONAL UT SPP 3,920,000
EFFICIENCY OF ROADWAY (14CCN)
CN SPP 81,200,000
Project Cost: 4,040,000 0 9,670,000 81,200,000
Bath 10069 US-60 BRIDGE PROJECT IN BATH COUNTY ON PL
(006B00015N) US-60 AT LICKING RIVER DN BRX 1,346,018
RW
UT
CN
Project Cost: 0 0 0 1,346,018
Bath 80101 KY-36 IMPROVE SAFETY ON KY 36 FROM THE PL
INTERSECTION WITH I-64 TO THE DN
INTERSECTION OF KY 965 INCLUDING THE RW
CURVES KNOWN AS CLEAR CREEK UT SPP 2,430,000
FURNACE AND THOMAS HILL (2020CCN)
CN SPP 6,000,000 6,000,000
Project Cost: 8,430,000 6,000,000 0 0
Bath 80102 KY-36 IMPROVE SAFETY AND OPERATIONAL PL
EFFICIENCY ON KY 36 FROM NORTH OF DN SPP 720,000
MARIELLA DR TO THE INTERSECTION OF RW SPP 1,300,000
OLD KY 36 (2020 CCN) (2022CCN) UT SPP 1,860,000
(2024CCR)
CN SPP 6,600,000
Project Cost: 720,000 1,300,000 1,860,000 6,600,000
12 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Bath 80250 US-60 REALIGN ROADWAY ON US 60 NEAR PL
OWINGSVILLE BEGINNING IN THE DN
VICINITY OF ROSE BUSH LN AND ENDING RW SPP 1,820,000
AT WELLS ROAD NEAR I 64 EXIT 123 UT SPP 1,300,000
(2022CCN) (2024CCR)
CN SPP 11,600,000
Project Cost: 3,120,000 11,600,000 0 0
Bath 80406 KY-36 Improve safety and mobility on KY 36 from PL
0.1 miles south of Suiter Branch Rd. to the DN SPP 2,000,000
intersection with US 460 (MP 6.136). RW SPP 3,250,000
UT SPP 6,500,000
CN SPP 16,500,000
Project Cost: 2,000,000 3,250,000 6,500,000 16,500,000
Total for Bath county PL 400,000
DN 7,010,000 1,346,018
RW 1,820,000 7,430,000 5,750,000
UT 3,730,000 350,000 14,240,000
CN 6,000,000 17,600,000 3,100,000 112,140,000
Total Amounts: 18,960,000 25,380,000 23,090,000 113,486,018
Bell 167 KY-74 ENHANCING CUMBERLAND AVENUE PL
FROM US 25E TO 18TH STREET WITH DN
STREET IMPROVEMENTS FOR VEHICLE RW
AND PEDESTRIANS, AS WELL AS STORM UT SPP 3,860,000
WATER MANAGEMENT TO IMPROVE
CN SPP 17,580,000
Project Cost: 21,440,000 0 0 0
Bell 8702 US-119 PROVIDE PASSING OPPORTUNITIES ON PL
US 119 IN THE VICINITY OF MP 4.5 IN DN
BELL COUNTY. (12CCN)(14CCR) RW SPP 1,240,000
(2020CCN) (2024CCR) UT SPP 610,000
CN SPP 5,600,000
Project Cost: 1,850,000 5,600,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 13
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Bell 10101 CS-2222 BRIDGE PROJECT IN BELL COUNTY ON PL
(007C00072N) 17TH STREET AT YELLOW DN BRZ 90,720
CREEK RW
UT
CN BRZ 604,802
Project Cost: 695,522 0 0 0
Bell 10167 KY-66 BRIDGE PROJECT IN BELL COUNTY ON PL
(007B00007N) KY-66 AT SIMS FORK DN FBP2 250,108
RW
UT
CN FBP2 1,667,385
Project Cost: 0 0 0 1,917,493
Bell 10169 US-25 BRIDGE PROJECT IN BELL COUNTY ON PL
(007B00024L) US-25E-10 AT YELLOW DN BRO 805,362
CREEK RW
UT
CN
Project Cost: 0 0 0 805,362
Bell 10170 KY-1534 BRIDGE PROJECT IN BELL COUNTY ON PL
(007B00051N) KY-1534 AT WILLIAMS DN BRX 97,566
BRANCH RW
UT
CN BRX 650,440
Project Cost: 0 0 748,006 0
Bell 80300 US-119 Improve mobility by constructing a 2+1 PL
road on US 119 in Bell County by adding a DN
continuous third lane that serves as an RW NH 2,400,000
alternate passing lane (MP 3.5 - 9.3). UT NH 2,320,000
(2024CCN)
CN NH 30,000,000
Project Cost: 0 2,400,000 2,320,000 30,000,000
14 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Bell 80400 US-25 Corridor study of US25E through Bell & PL SPP 350,000
Knox to determine locations for the DN
installation of RCUTs (approximately 43 RW
miles of roadway). UT
CN
Project Cost: 350,000 0 0 0
Bell 80419 US-25 Improve safety and reduce congestion on PL
US 25E from KY 74 to KY 441 (MP 1.70 to DN SPP 750,000
2.80) RW SPP 1,000,000
UT SPP 1,000,000
CN SPP 12,000,000
Project Cost: 2,750,000 12,000,000 0 0
Bell 80420 KY-441 Improvement of existing KY 441/KY 2402 PL
intersection (MP 4.25) DN SPP 500,000
RW SPP 500,000
UT SPP 300,000
CN SPP 4,000,000
Project Cost: 1,000,000 300,000 4,000,000 0
Total for Bell county PL 350,000
DN 1,340,720 97,566 1,055,470
RW 2,740,000 2,400,000
UT 5,470,000 300,000 2,320,000
CN 18,184,802 17,600,000 4,650,440 31,667,385
Total Amounts: 28,085,522 20,300,000 7,068,006 32,722,855
Boone 79 I -75 IMPROVE SAFETY, MOBILITY, PL
OPERATIONS, AND GEOMETRICS AT THE DN
JUNCTION OF I-75 AND I-275 AND THE RW NH 20,000,000
SYSTEM-TO-SYSTEM RAMPS. (2024CCR) UT NH 10,000,000
CN NH 260,000,000
Project Cost: 30,000,000 0 0 260,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 15
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boone 80 I -75 REDUCE CONGESTION AND IMPROVE PL
TRAFFIC MOBILITY AT THE INTERCHANGE DN
OF I-75 AND KY-14 IN WALTON. RW NH 10,000,000
(2020CCR) (2022CCR) (2024CCR) UT NH 1,680,000
CN NH 36,000,000
Project Cost: 11,680,000 36,000,000 0 0
Boone 113 KY-338 CONDUCT PLANNING STUDY TO PL SPP 500,000
EVALUATE OPTIONS FOR DN
RECONSTRUCTING KY 338 (RICHWOOD RW
ROAD) FROM TRIPLE CROWN BLVD TO UT
US 42.
CN
Project Cost: 500,000 0 0 0
Boone 446.1000 US-42 Provide East-West Connectivity and PL
Improve Mobility From KY 237 to KY 842. DN
(2024BOP) RW SPP 15,750,000
UT SPP 1,800,000
CN
Project Cost: 15,750,000 1,800,000 0 0
Boone 446.2000 US-42 Provide East-West Connectivity and PL
Improve Mobility from KY 842 to Mall Road. DN
(2024BOP) RW SPP 36,750,000
UT SPP 3,600,000
CN
Project Cost: 36,750,000 3,600,000 0 0
Boone 447.1000 US-25 Reconstruct US 25 from Winning Colors PL
Drive to Melinda Lane. (2024BOP) DN
RW SPP 10,500,000
UT SPP 4,160,000
CN SPP 20,880,000
Project Cost: 14,660,000 20,880,000 0 0
16 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boone 447.2000 US-25 Reconstruct US 25 from Melinda Lane to PL
RR Spur Crossing. (2024BOP) DN
RW SPP 15,750,000
UT SPP 6,240,000
CN SPP 25,520,000
Project Cost: 15,750,000 6,240,000 25,520,000 0
Boone 966.0800 CO-0 DEDICATED FEDERAL-AID STP FUNDS PL
EARMARKED FOR NKY URBANIZED DN
AREA AND SUBJECT TO MPO CONTROL RW
FOR FY 2026 THROUGH FY 2032. UT
(FUNDING SUBJECT TO FISCAL
CN SNK 8,600,000 8,600,000 8,600,000 8,600,000
Project Cost: 8,600,000 8,600,000 8,600,000 8,600,000
Boone 8000.2000 I -275 I-275/KY-212 INTERCHANGE AND KY-20 PL
RECONSTRUCTION NEAR GREATER DN SPP 6,990,000
CINCINNATI AIRPORT. (2004BOPC)(KYTC RW SPP 16,780,000
SHARE @ 46.6%) (2024CCN) UT SPP 5,250,000
CN SPP 54,920,000
Project Cost: 6,990,000 16,780,000 5,250,000 54,920,000
Boone 10028 I -275 ADDRESS DEFICIENCIES OF BRIDGE ON PL
I-275 OVER OHIO RIVER (008B00052N) DN FBP 2,500,000
RW
UT
CN FBP 25,000,000
Project Cost: 0 27,500,000 0 0
Boone 20007 I -275 ADDRESS CONDITION OF I-275 FROM PL
MILEPOINT 7.25 TO MILEPOINT 13.076 DN NHPM 1,230,000
RW
UT
CN NHPM 12,279,090
Project Cost: 0 0 13,509,090 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 17
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boone 20063 I -75 ADDRESS CONDITION OF I-075 FROM PL
MILEPOINT 178.024 TO MILEPOINT DN NHPM 960,000
183.094 (182.816 NON-CARDINAL) RW
UT
CN NHPM 9,606,432
Project Cost: 0 0 0 10,566,432
Boone 22128 I -75 ADDRESS CONDITION OF I-075 FROM PL
MILEPOINT 182.816 (183.094 CARDINAL) DN NHPM 750,000
TO MILEPOINT 183.312 RW
UT
CN NHPM 7,450,000
Project Cost: 0 8,200,000 0 0
Boone 80000 KY-237 RECONSTRUCT GUNPOWDER RD. FROM PL
US-42 TO KY-536. (18CCN) (2020CCR) DN
(2022CCR) (2024CCR) RW SPP 19,800,000
UT SPP 4,320,000
CN SPP 32,250,000
Project Cost: 19,800,000 4,320,000 32,250,000 0
Boone 80001 KY-237 EXPANSION OF ROUNDABOUTS ALONG PL
KY-237 AT CARDINAL COVE AND DN
GRAVES RD(18CCN) (2020CCR) RW SPP 2,880,000
(2022CCR) (2024CCR) UT SPP 1,570,000
CN SPP 5,040,000
Project Cost: 2,880,000 1,570,000 5,040,000 0
Boone 80100 KY-1017, CONVERT TURFWAY RD AND PL
KY-717 THOROUGHBRED BLVD FROM 2 WAY TO DN STPF 3,000,000
ONE WAY AND CONSTRUCT NEW I-75 RW STPF 13,750,000
ACCESS (2020CCN) (2022CCR) UT STPF 1,800,000
(2024CCR)
CN STPF 30,000,000
Project Cost: 3,000,000 13,750,000 1,800,000 30,000,000
18 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boone 80101 KY-18 CONVERT KY 18 (BURLINGTON PIKE) TO PL
A SUPER STREET (2020CCN) (2022CCR) DN
(2024CCR) RW
UT
CN NH 10,000,000
Project Cost: 10,000,000 0 0 0
Boone 80102 KY-3060 Reconstruct KY 3060 (Frogtown Road) PL
from US 42 to US 25. (2022CCR) DN
(2024CCR) RW SPP 16,680,000
UT SPP 4,710,000
CN SPP 26,680,000
Project Cost: 16,680,000 4,710,000 26,680,000 0
Boone 80150 KY-717 Reconstruct Turfway Road (KY 717) PL
from Aero Parkway (MP 0.0) to Donaldson DN
Road (MP 1.67). (2020CCN) (2022CCR) RW
(2024CCR) UT
CN STPF 7,000,000
Project Cost: 7,000,000 0 0 0
Boone 80202 KY-536, Conduct a planning study to evaluate PL SPP 810,000
US-42 potential improvement options to promote DN
economic growth through central Boone RW
County as well as improving safety and UT
modernizing existing roadways
CN
Project Cost: 810,000 0 0 0
Boone 80204 KY-536, PLANNING STUDY TO IMPROVE EXISTING PL SPP 840,000
US-42 ALIGNMENTS AND NEW CONSTRUCTION DN
BETWEEN KY 536 (HATHAWAY ROAD) RW
AND KY 14 (VERONA MUDLICK ROAD) UT
(2022CCN) (2024CCR)
CN
Project Cost: 840,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 19
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boone 80206 KY-18 Improve safety and address geometric PL
deficiencies along KY 18 from Caroline DN SPP 1,040,000
Williams Way to KY 338; include RW SPP 2,932,500
multi-modes. (2022CCN) (2024CCR) UT SPP 985,600
CN SPP 9,600,000
Project Cost: 1,040,000 2,932,500 985,600 9,600,000
Boone 80207 CR-1001 Improve safety & mobility, reduce PL
congestion and address geometric DN
deficiencies along Camp Ernst Road (CR RW STPF 10,000,000
1001) from KY 237 (Pleasant Valley Rd) to UT STPF 2,800,000
KY 536 (Hathaway Rd). (2022CCN)
CN STPF 34,720,000
Project Cost: 12,800,000 34,720,000 0 0
Boone 80208 CR-1001 Improve safety & mobility, reduce PL
congestion and address geometric DN SPP 2,690,000
deficiencies along Camp Ernst Road (CR RW SPP 13,800,000
1001) from Long Branch Rd. to KY 237 UT SPP 3,360,000
(Pleasant Valley Rd.) (2022CCN)(See Item
CN SPP 29,760,000
Project Cost: 2,690,000 17,160,000 0 29,760,000
Boone 80209 KY-237 Improve access to KY 237 for Litton Lane. PL
(2022CCN) (2024CCR) DN
RW SPP 7,350,000
UT SPP 520,000
CN SPP 6,050,000
Project Cost: 7,350,000 520,000 6,050,000 0
Boone 80210 KY-18 Paired Grade-Separated Intersections PL
along KY 18 at KY 842 and Mall Road. DN SPP 4,992,000
(2022CCN) (2024CCR) RW SPP 14,662,500
UT SPP 3,942,400
CN SPP 33,040,000
Project Cost: 4,992,000 14,662,500 3,942,400 33,040,000
20 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boone 80211 KY-18 Improve capacity at the KY 18 (Burlington PL
Pike) intersection with KY 1017 (Aero DN SPP 1,860,000
Parkway) to support existing and future RW SPP 19,500,000
traffic volumes. Consider grade UT SPP 1,000,000
separation design options. (2022CCN)
CN SPP 24,800,000
Project Cost: 1,860,000 19,500,000 1,000,000 24,800,000
Boone 80257 I -75 EXPAND NORTHBOUND AND PL
SOUTHBOUND REST AREAS ON I-71/I-75 DN
IN BOONE COUNTY TO ADD MORE TRUCK RW
PARKING. (2022CCN) (2024CCR) UT NH 450,000
CN NH 16,000,000
Project Cost: 450,000 16,000,000 0 0
Boone 80304 CR-1151 IMPROVE SAFETY AND REDUCE PL
CONGESTION ALONG HICKS PIKE (CR DN STPF 5,160,000
1151) FROM US 42 TO KY 338. RW STPF 15,600,000
(2024CCN) UT STPF 3,410,000
CN STPF 37,200,000
Project Cost: 5,160,000 15,600,000 3,410,000 37,200,000
Boone 80316 US-25 IMPROVE SAFETY & MOBILITY, AND PL
ADDRESS GEOMETRIC DEFICIENCIES DN STPF 4,320,000
ALONG US 25 (DIXIE HWY.) BETWEEN KY RW STPF 6,000,000
16 (MARY GRUBBS HIGHWAY) AND KY UT STPF 3,480,000
338 (RICHWOOD RD.) (2024CCN)
CN STPF 46,800,000
Project Cost: 4,320,000 6,000,000 3,480,000 46,800,000
Boone 80317 CR-1042 IMPROVE SAFETY AND REDUCE PL
CONGESTION ON LIMABURG ROAD FROM DN STPF 2,160,000
CONRAD LANE TO KY 18 (BURLINGTON RW STPF 12,000,000
PIKE). (2024CCN) UT STPF 4,180,000
CN STPF 29,760,000
Project Cost: 2,160,000 12,000,000 4,180,000 29,760,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 21
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boone 80318 KY-20 IMPROVE SAFETY AND MOBILITY ALONG PL
KY 20 (PETERSBURG ROAD) FROM DN SPP 4,380,000
GRAVES ROAD TO KY 237 (NORTH BEND RW SPP 15,840,000
ROAD). (2024CCN) UT SPP 3,370,000
CN SPP 38,440,000
Project Cost: 4,380,000 15,840,000 3,370,000 38,440,000
Boone 80320 KY-237 Transportation improvements adjoining KY PL
237 Central Parkway in Partnership with DN
Boone County (TID). (2024CCN) RW
UT
CN SPP 10,400,000
Project Cost: 10,400,000 0 0 0
Boone 80350 KY-2951 Improve Steeplechase Elementary School PL
access and safety by extending Grand DN SPP 2,000,000
National Blvd to Chambers Road. RW SPP 4,000,000
(2024CCN) UT SPP 200,000
CN SPP 15,000,000
Project Cost: 2,000,000 4,200,000 15,000,000 0
Boone 80352 I -75 Add additional exit lane on I-75 PL
Southbound (MP 171 South) ramp and DN
align lights to provide 2 left turn lanes and I RW
right turn lane on HWY 14/16 Nart Grubbs UT
HWY. Ramp only work. (2024CCN)
CN NH 1,560,000
Project Cost: 1,560,000 0 0 0
Boone 80356 CR-1042 Reconstruct Limaburg Road from KY 18 to PL
Gateway Blvd (CR 1086) (2024CCN) DN SPP 4,500,000
RW SPP 12,500,000
UT SPP 4,000,000
CN SPP 35,000,000
Project Cost: 4,500,000 16,500,000 35,000,000 0
22 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boone 80357 KY-20 Reconstruct KY 20 from the new KY 495 PL
(Graves Road) Interchange to KY 18 DN SPP 4,500,000
(MP14.6-16.7) (2024CCN) RW SPP 25,500,000
UT SPP 6,000,000
CN SPP 46,000,000
Project Cost: 4,500,000 25,500,000 6,000,000 46,000,000
Boone 80358 KY-536 Reconstruct KY 536 from Camp Ernst PL
Road to Old Union Road (MP 8.0-10.8) DN SPP 6,750,000
(2024CCN) RW SPP 20,000,000
UT SPP 3,000,000
CN SPP 60,000,000
Project Cost: 6,750,000 20,000,000 3,000,000 60,000,000
Boone 80359 US-25 Improve safety & mobility and address PL
geometric deficiencies along US 25 (Dixie DN SPP 4,000,000
Hwy) between KY 16 and KY 338 RW SPP 10,000,000
(Richwood Rd) (MP 2.2-4.7) (2024CCN) UT SPP 3,000,000
CN SPP 39,000,000
Project Cost: 4,000,000 10,000,000 3,000,000 39,000,000
Boone 80360 PF-9999 CONSTRUCT A NEW CONNECTION PL
BETWEEN KY 1292, BEAVER ROAD, TO DN SPP 6,000,000
KY 2951, CHAMBERS ROAD, AND KY 16. RW SPP 30,000,000
(2024CCN) UT SPP 5,000,000
CN SPP 85,000,000
Project Cost: 6,000,000 30,000,000 5,000,000 85,000,000
Boone 80405 I-71 Widen I-71 to six lanes in Boone County PL
between KY 14 and the I-75 interchange. DN NH 4,000,000
RW NH 5,000,000
UT NH 2,500,000
CN NH 165,000,000
Project Cost: 4,000,000 5,000,000 2,500,000 165,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 23
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boone 80406 KY-14 Reconstruct KY 14 (Verona Mudlick Rd) PL SPP 250,000
from I 71 to US 42. DN SPP 3,500,000
RW SPP 8,000,000
UT SPP 1,250,000
CN SPP 45,000,000
Project Cost: 3,750,000 8,000,000 1,250,000 45,000,000
Boone 80416 I-71 "Planning study to determine feasibility of PL SPP 250,000
charging fees for using added capacity on DN
projects (ie a convenience lane) in RW
Kentucky and specifically reviewing the UT
addition of a convenience lane on
CN
Project Cost: 250,000 0 0 0
Total for Boone county PL 2,650,000
DN 71,842,000 3,250,000 1,230,000 960,000
RW 165,460,000 245,865,000
UT 19,090,000 30,320,000 48,168,000
CN 37,560,000 148,650,000 166,419,090 1,052,526,432
Total Amounts: 296,602,000 428,085,000 215,817,090 1,053,486,432
Bourbon 474 CO-0 Extend Stewart Street to Bellafato Street PL
in the City of Paris to provide improved DN SPP 355,000
access to US 460. RW SPP 150,000
UT SPP 310,000
CN SPP 3,390,000
Project Cost: 355,000 150,000 310,000 3,390,000
Bourbon 10036 KY-1879 BRIDGE PROJECT IN BOURBON COUNTY PL
ON (009B00055N) KY-1879 AT LAYSONS DN BRX 149,023
BRANCH RW
UT
CN BRX 993,485
Project Cost: 0 0 0 1,142,508
24 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Bourbon 80104 US-460 IMPROVE US 460 FROM RUSSELL CAVE PL
RD TO I 75 (2ND PART OF 7-8705) DN
(2020CCN)(SEE 7-8705.10) (2022CCR) RW
(2024CCR) UT
CN STP2 10,000,000
Project Cost: 10,000,000 0 0 0
Bourbon 80155 KY-537 IMPROVE SAFETY OF CANE RIDGE ROAD PL
(KY 537) FROM THE INTERSECTION WITH DN SPP 3,240,000
460 TO THE ENTRANCE PAST COLOR RW
POINT (2020CCN) (2022CCR) UT
CN
Project Cost: 3,240,000 0 0 0
Bourbon 80321 KY-627 Improve safety on KY 627 (Winchester PL
Rd) from Clark/Bourbon CL to US 68X DN SPP 350,000
(High St). Breakout section including the RW SPP 100,000
KY 57 (Austerlitz Rd) intersection and UT SPP 100,000
continuing North for approx. 0.70 miles.
CN SPP 1,250,000
Project Cost: 350,000 100,000 100,000 1,250,000
Bourbon 80412 KY-1939 Modernize roadway, improving PL
congestion, safety on KY 1939 DN SPP 1,100,000
(Bethlehem Road) from Westridge Lane to RW SPP 3,600,000
approx. 2,000 ft south of Cross Creek UT SPP 2,300,000
Drive.
CN SPP 6,200,000
Project Cost: 1,100,000 3,600,000 2,300,000 6,200,000
Total for Bourbon county PL
DN 5,045,000 149,023
RW 3,850,000
UT 2,710,000
CN 10,000,000 11,833,485
Total Amounts: 15,045,000 3,850,000 2,710,000 11,982,508
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 25
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boyd 180 KY-716 IMPROVE SAFETY AND DECREASE PL
CONGESTION ON KY 716 FROM MP 0.0 DN SPP 520,000
(US 60) TO MP 0.56 (KY 3293) (2020CCR) RW SPP 280,000
(2024CCN) UT SPP 1,080,000
CN SPP 2,800,000
Project Cost: 520,000 280,000 1,080,000 2,800,000
Boyd 208.0600 CO-0 FEDERAL 'STP' FUNDS DEDICATED TO PL
HUNTINGTON-ASHLAND MPO FOR FY DN
2022-2028. (FUNDING SUBJECT TO RW
FISCAL CONSTRAINT PENDING MPO TIP) UT
(2020CCR) (2022CCR) (2024CCR)
CN SAH 1,800,000 1,800,000 1,800,000 1,800,000
Project Cost: 1,800,000 1,800,000 1,800,000 1,800,000
Boyd 10074 US-23 BRIDGE PROJECT IN BOYD COUNTY ON PL
(010B00058N) US-23S AT OHIO DN BRO 1,800,000
RIVER,CSX,STREETS RW
UT
CN BRO 18,000,000
Project Cost: 0 0 19,800,000 0
Boyd 10075 CR-1243 BRIDGE PROJECT IN BOYD COUNTY ON PL
(010C00018N) STRAIGHT CRK AT DN FBP2 213,974
STRAIGHT CREEK RW
UT
CN FBP2 1,426,494
Project Cost: 0 0 1,640,468 0
Boyd 20036 US-60 ADDRESS CONDITION OF US-60 FROM PL
MILEPOINT 4.135 TO MILEPOINT 9.638 DN STP5 480,000
RW
UT
CN STP5 5,520,000
Project Cost: 0 0 0 6,000,000
26 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boyd 80301 US-23 Improve the operational efficiency of PL
Greenup Avenue (US-23) from the DN NH 560,000
southern split with Winchester Avenue RW NH 60,000
(US-23X) (MP 17.065) to the intersection UT NH 60,000
of 20th Street (MP 18.055). (2024CCN)
CN NH 1,550,000
Project Cost: 560,000 60,000 60,000 1,550,000
Boyd 80350 KY-168 Improve safety, mobility and accessibility PL
at the intersection of KY 168 and CS 2341 DN SPP 760,000
(Robert's Drive); located within close RW SPP 2,400,000
proximity of an at grade CSX Railroad UT SPP 1,630,000
Crossing (MP 6.7-6.8) (2024CCN)
CN SPP 6,000,000
Project Cost: 760,000 2,400,000 1,630,000 6,000,000
Boyd 80351 CR-1299 Improve Commerce Drive (CR 1299), PL
including widening, improving geometrics DN SPP 780,000
and drainage (2024CCN) RW SPP 1,150,000
UT SPP 840,000
CN SPP 9,600,000
Project Cost: 780,000 1,150,000 840,000 9,600,000
Boyd 80353 PF-9999 Construct a new bridge over the Little PL
Sandy River and construct a roadway DN
from the south side of Camp Landing. RW SPP 600,000
Project to be complete through a UT SPP 1,000,000
Memorandum of Agreement with Boyd
CN SPP 10,000,000
Project Cost: 1,600,000 10,000,000 0 0
Boyd 80400 US-23 Improve pedestrian mobility and safety PL
along US-23 by constructing a pedestrian DN SPP 250,000
sidewalk or shared-use-path with curb RW SPP 250,000
and gutter from KY-5 in Boyd County to UT SPP 400,000
Russell Plaza Drive in Greenup County.
CN SPP 2,500,000
Project Cost: 250,000 650,000 2,500,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 27
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boyd 80402 US-60 Improve operational efficiency of the US PL
60 (13th Street) and KY 168 (Blackburn DN NH 800,000
Ave) intersection RW NH 4,000,000
UT NH 2,500,000
CN NH 3,000,000
Project Cost: 800,000 4,000,000 2,500,000 3,000,000
Boyd 80403 KY-5 Improve operational efficiency and reduce PL
congestion by constructing a right turn DN SPP 250,000
lane on KY 5 approaching US 23 and a RW SPP 350,000
TWLTL for turns to adjacent businesses. UT SPP 500,000
CN SPP 1,200,000
Project Cost: 250,000 350,000 500,000 1,200,000
Boyd 80404 US-23 Improve operation efficiency of the PL
intersection of US 23 (Greenup Avenue) DN NH 850,000
and US 23X (Winchester Avenue). RW NH 5,000,000
UT NH 1,500,000
CN NH 3,000,000
Project Cost: 850,000 6,500,000 3,000,000 0
Boyd 80408 KY-180 Improve safety on KY 180 in the proximity PL
of the Shell/McDonalds. DN SPP 150,000
RW SPP 50,000
UT SPP 50,000
CN SPP 1,000,000
Project Cost: 150,000 50,000 50,000 1,000,000
Total for Boyd county PL
DN 4,920,000 2,013,974 480,000
RW 600,000 13,540,000
UT 1,000,000 1,900,000 6,660,000
CN 1,800,000 11,800,000 26,726,494 32,470,000
Total Amounts: 8,320,000 27,240,000 35,400,468 32,950,000
28 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boyle 80000 PF-9999 CONSTRUCT A NEW CONNECTOR ROAD PL
ON THE EAST SIDE OF DANVILLE DN
CONNECTING KY-34 AND US-150 RW SPP 6,600,000
BYPASS(18CCN) (2020CCR) UT SPP 3,000,000
CN SPP 43,750,000
Project Cost: 6,600,000 3,000,000 43,750,000 0
Boyle 80204 KY-52 RECONSTRUCT KY 52 FROM KY 1805 PL
(Goggin Ln) TO KY 590 (2022CCN) DN
(2024CCR) RW
UT STP2 3,480,000
CN STP2 3,805,000 4,000,000
Project Cost: 7,285,000 4,000,000 0 0
Boyle 80250 KY-34 "IMPROVE THE SAFETY AND MOBILITY PL
OF KY 34 FROM ALUM SPRINGS DN
CROSSPIKE (MP 10.391) TO APPROX. RW SPP 3,360,000
1,000 FEET WEST OF CORPORATE DRIVE UT SPP 1,120,000
(MP 10.800) (2022CCN)"
CN SPP 8,140,000
Project Cost: 3,360,000 1,120,000 8,140,000 0
Boyle 80300 KY-1805 Widen the Goggin Ln from MP 0 to MP PL
2.712 to create a road shoulder that
would improve safety (2024CCN) DN NH 1,300,000
SPP 2,430,000
RW NH 4,600,000
SPP 5,100,000
UT NH 3,360,000
SPP 3,450,000
CN NH 4,060,000
SPP 15,850,000
Project Cost: 3,730,000 13,150,000 19,210,000 4,060,000
Boyle 80302 KY-34 Improve roadway geometry to promote PL
safety on KY 34 from Lexington Avenue DN SPP 1,500,000
to Old Bridge Road in Boyle County. RW SPP 6,600,000
(2024CCN) UT SPP 3,000,000
CN SPP 13,700,000
Project Cost: 1,500,000 9,600,000 13,700,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 29
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Boyle 80313 KY-52 PLANNING STUDY TO EVALUATE PL
OPTIONS FOR IMPROVING SAFETY ON DN
KY 52 BETWEEN DANVILLE AND RW SPP 2,000,000
LANCASTER. (2024CCN) UT SPP 4,100,000
CN SPP 15,800,000
Project Cost: 2,000,000 4,100,000 15,800,000 0
Boyle 80354 US-68 Improve the existing geometry and typical PL
section of US 68 from approx. MP 5.2 to DN
MP 6.39 at the intersection of 2nd Street in RW SPP 1,250,000
Perryville (2024CCN) UT SPP 2,000,000
CN SPP 6,500,000
Project Cost: 0 1,250,000 2,000,000 6,500,000
Boyle 80419 US-150 Resconstruction of the intersection of PL
US-150 (Perryville Rd) at KY-3366 DN SPP 350,000
(Bluegrass Pike) RW SPP 750,000
UT SPP 1,200,000
CN SPP 2,150,000
Project Cost: 350,000 1,950,000 2,150,000 0
Boyle 80425 KY-2168 Intersection Improvements at KY 2168/US PL
127 and KY 2168/KY34 (MP O to 3.088) DN
RW
UT
CN SPP 3,500,000
Project Cost: 3,500,000 0 0 0
Total for Boyle county PL
DN 5,580,000
RW 11,960,000 18,300,000
UT 3,480,000 15,870,000 5,360,000
CN 7,305,000 4,000,000 99,390,000 10,560,000
Total Amounts: 28,325,000 38,170,000 104,750,000 10,560,000
30 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Bracken 355.2200 KY-8 OPERATION OF AUGUSTA FERRY FOR PL
FY 2027 THROUGH FY 2032.(12CCR) DN
(14CCR) (2020CCR) (2024CCR) RW
UT
CN SPP 338,000 338,000 338,000 338,000
Project Cost: 338,000 338,000 338,000 338,000
Bracken 80103 KY-8 RECONSTRUCT KY 8 FROM WRANGLING PL
RUN RD TO OLD KY 19. (2020CCN) DN SPP 4,550,000
(2022CCR) (2024CCR) RW SPP 5,350,000
UT SPP 3,050,000
CN SPP 31,633,000
Project Cost: 4,550,000 8,400,000 31,633,000 0
Bracken 80250 KY-9 IMPROVE SAFETY AND MOBILITY AT THE PL
INTERSECTION OF KY 9 (AA HIGHWAY) DN SPP 140,000
AND KY 1019 (LENNOXBURG FOSTER RW SPP 20,000
ROAD). (2022CCN) (2024CCR) UT SPP 120,000
CN
Project Cost: 140,000 20,000 120,000 0
Bracken 80413 KY-8 Improve safety and mobility along KY 8 PL
(Mary Ingles Highway) from KY 2228 DN SPP 3,000,000
(Foster Road) to milepoint 2.78. (MP 1.19 RW SPP 1,500,000
to 2.78) UT SPP 1,000,000
CN SPP 25,000,000
Project Cost: 3,000,000 2,500,000 25,000,000 0
Bracken 80414 KY-8 Improve safety and mobility along KY 8 PL
(Mary Ingles Highway) from milepoint 2.78 DN SPP 2,000,000
to Willow Creek Road. (MP 2.78 to 3.597) RW SPP 1,000,000
UT SPP 500,000
CN SPP 13,000,000
Project Cost: 2,000,000 1,000,000 500,000 13,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 31
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Bracken 80415 KY-10 Improvements to KY 10 from Brooksville to PL
Germantown (Delaney Subdivision Road DN SPP 2,000,000
to Hillsdale Road ) to address the safety RW SPP 1,500,000
issue as well as the geometric UT SPP 750,000
deficiencies along the roadway (MP 16.5
CN SPP 13,000,000
Project Cost: 0 2,000,000 2,250,000 13,000,000
Total for Bracken county PL
DN 9,690,000 2,000,000
RW 7,870,000 1,500,000
UT 4,050,000 1,370,000
CN 338,000 338,000 56,971,000 26,338,000
Total Amounts: 10,028,000 14,258,000 59,841,000 26,338,000
Breathitt 375 KY-205 IMPROVE KY-205 FROM NORTH OF PL
KY-1812 TO SOUTH OF PEGGS FORK RD. DN
(2020CCR) RW
UT STPF 2,360,000
CN STPF 5,000,000 5,550,000
Project Cost: 2,360,000 5,000,000 5,550,000 0
Breathitt 10070 KY-1812 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-1812 OVER BOONE FORK OF DN BRZ 165,340
FROZEN CRE (013B00006N) RW
UT
CN BRZ 1,102,264
Project Cost: 0 0 1,267,604 0
Breathitt 10072 KY-542 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-542 OVER SPRING FK-QUICKSAND DN BRZ 159,286
CRK (013B00043N) RW
UT
CN BRZ 1,061,904
Project Cost: 0 0 1,221,190 0
32 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Breathitt 80107 CR-1125 REPLACE BRIDGE OVER PUNCHEON PL
CREEK ON MAX ROARK RD (2020CCN) DN SPP 150,000
RW SPP 10,000
UT SPP 10,000
CN SPP 150,000
Project Cost: 150,000 10,000 10,000 150,000
Breathitt 80353 CR-1007 Replace bridge and approaches on Round PL
Bottom Rd to reduce flooding issues DN FBP2 158,545
(013C00054N) RW
UT
CN FBP2 1,056,965
Project Cost: 0 1,215,510 0 0
Breathitt 80410 KY-30 Reconstruction of KY 30 from 0.006 miles PL
West of KY 3237 to 1.044 miles East of DN SPP 900,000
KY 2469. See KY 30 Planning Study RW SPP 800,000
September 2014 Alternate 2A (MP 5.203 UT SPP 700,000
to 6.97)
CN SPP 9,300,000
Project Cost: 0 900,000 1,500,000 9,300,000
Breathitt 80411 KY-1110 Improve reliability of KY 1110 between MP PL
14 and MP 15. DN
RW SPP 500,000
UT SPP 750,000
CN SPP 14,250,000
Project Cost: 0 500,000 750,000 14,250,000
Total for Breathitt county PL
DN 150,000 1,058,545 324,626
RW 510,000 800,000
UT 2,360,000 1,460,000
CN 6,056,965 7,714,168 23,700,000
Total Amounts: 2,510,000 7,625,510 10,298,794 23,700,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 33
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Breckinridge 8702 KY-79 ADDRESS SAFETY AND GEOMETRIC PL
DEFICIENCIES ON KY 79 FROM KY 477 TO DN
KY 144 (12CCN)(14CCR)(18CCN)(2020 RW SPP 4,200,000
CCR) (COMBINED W/ 4-8703) (2022CCR) UT SPP 2,430,000
(2024CCR)
CN SPP 8,700,000
Project Cost: 6,630,000 8,700,000 0 0
Breckinridge 8904 KY-992 MINOR WIDENING OF KY 992 BETWEEN PL
ROCK QUARRY AND US 60. (16CCN) DN STP2 560,000
(18CCN) (2024CCN) RW STP2 900,000
UT STP2 900,000
CN SPP 3,720,000
Project Cost: 560,000 1,800,000 3,720,000 0
Breckinridge 10080 CR-1349 ADDRESS DEFICIENCIES OF BRIDGE ON PL
CARL NEWBY RD OVER ROCK LICK DN BRZ 103,141
CREEK (014C00034N) RW
UT
CN BRZ 687,608
Project Cost: 0 0 0 790,749
Breckinridge 80300 KY-79 ADDRESS SAFETY, GEOMETRIC PL
DEFICIENCIES AND MAINTENANCE ISSUES DN SPP 1,400,000
ALONG KY 79 FROM MCCOY-ROFF RW SPP 2,190,000
ROAD TO 600' N OF SAND ROCK PASS UT SPP 1,500,000
ROAD. (2024CCN)
CN SPP 10,000,000
Project Cost: 1,400,000 3,690,000 10,000,000 0
Breckinridge 80306 KY-261 ADDRESS GEOMETRIC DEFICIENCIES PL
ALONG KY 261 AT THE S-CURVES JUST DN SPP 340,000
NORTH OF FIRST STREET. SEE 4-8903.00. RW SPP 180,000
(2024CCN) UT SPP 190,000
CN
Project Cost: 340,000 180,000 0 190,000
34 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Breckinridge 80408 KY-79 ADDRESS SAFETY, GEOMETRIC PL
DEFICIENCIES AND MAINTENANCE ISSUES DN SPP 2,000,000
ALONG KY 79 FROM 600' NORTH OF RW SPP 3,400,000
SAND ROCK PASS ROAD TO US 60 AT UT SPP 2,500,000
HARNED.
CN SPP 15,600,000
Project Cost: 2,000,000 5,900,000 15,600,000 0
Total for Breckinridge county PL
DN 4,300,000 103,141
RW 4,200,000 6,670,000
UT 2,430,000 4,900,000 190,000
CN 8,700,000 29,320,000 687,608
Total Amounts: 10,930,000 20,270,000 29,320,000 980,749
Bullitt 43 KY-44 RECONSTRUCT KY 44 FROM KY 1319 PL
KINGS CHURCH HIGHWAY TO SPENCER DN SPP 1,250,000
COUNTY LINE (2020CCN) (2024CCR) RW SPP 1,050,000
UT SPP 890,000
CN SPP 5,570,000
Project Cost: 1,250,000 1,050,000 890,000 5,570,000
Bullitt 150.0200 KY-44 RECONSTRUCT KY 44 FROM I 65 TO PL
CHIMNEY ROCK DRIVE (MILEPOINT 13.1 DN
TO MILEPOINT 15.1). (2022CCN) RW SPP 9,170,000
UT SPP 11,360,000
CN SPP 22,540,000
Project Cost: 0 9,170,000 11,360,000 22,540,000
Bullitt 150.4000 KY-44 SECTION 4 - FROM ARMSTRONG LANE PL
TO US 31EX DN SPP 1,140,000
RW SPP 12,280,000
UT SPP 8,160,000
CN SPP 15,290,000
Project Cost: 1,140,000 20,440,000 0 15,290,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 35
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Bullitt 150.5000 KY-44 SECTION 5 FROM CS 3316/CS 3628 TO PL
US 31E BYPASS (2008BOPC) (2022CCN) DN
(2024CCR) RW
UT
CN SPP 3,140,000
Project Cost: 3,140,000 0 0 0
Bullitt 347.5000 KY-44 MT. WASHINGTON-TAYLORSVILLE RD; PL
RECONSTRUCT KY 44 FROM US31E DN
BYPASS TO KY 1319 KINGS CHURCH RW
HIGHWAY (2020CCN) (2022CCR) UT SPP 1,770,000
(2024CCR)
CN SPP 13,730,000
Project Cost: 1,770,000 13,730,000 0 0
Bullitt 8307.2000 KY-245 WIDEN KY-245 FROM FLAGET HOSPITAL PL
(MP 7.722) THROUGH COUNTY LINE DN
(MP12.261 NELSON/MP0.000 BULLITT) TO RW
HAPPY HOLLOW RD (MP 4.425). UT SPP 12,880,000
(2022CCN) (2024CCR)
CN SPP 72,000,000
Project Cost: 12,880,000 72,000,000 0 0
Bullitt 20036 KY-480 ADDRESS CONDITION OF KY-480 FROM PL
MILEPOINT 0 TO MILEPOINT 5.14 DN
(2024CCR) RW
UT
CN NHPM 1,060,000
Project Cost: 1,060,000 0 0 0
Bullitt 22067 I -65 ADDRESS CONDITION OF I-065 FROM PL
MILEPOINT 110.7 TO MILEPOINT 118.58 DN
RW
UT
CN NHPM 42,000,000
Project Cost: 42,000,000 0 0 0
36 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Bullitt 22068 I -65 ADDRESS CONDITION OF I-065 FROM PL
MILEPOINT 118.58 TO MILEPOINT 123.18 DN NHPM 5,000,000
RW
UT
CN NHPM 50,000,000
Project Cost: 0 55,000,000 0 0
Bullitt 80101 KY-1450 IMPROVE SAFETY AND REDUCE PL
CONGESTION ON KY 1450 (BLUE LICK DN
RD.) BETWEEN THE INTERSECTIONS WITH RW
KY 1526 (JOHN HARPER HIGHWAY) AND UT SPP 5,750,000
CR 1512A (JEFFIE LANE) (2020CCN)
CN SPP 6,550,000
Project Cost: 5,750,000 0 6,550,000 0
Bullitt 80103 KY-44 RECONSTRUCT KY 44 FROM BOGARD PL
LANE TO ARMSTRONG LANE (2020CCN) DN
(2022CCR) RW SPP 5,640,000
UT SPP 7,660,000
CN SPP 16,940,000
Project Cost: 0 13,300,000 16,940,000 0
Bullitt 80338 KY-44 RAISE THE ROADWAY BY 4 FEET, WIDEN PL
IT FROM 2 TO 3 LANES (ADDING A DN FBP 410,093
TWO-WAY LEFT TURN), AND REPLACING RW
BRIDGE ID #015B00020N UT
CN FBP 2,733,952
Project Cost: 0 0 3,144,045 0
Bullitt 80339 KY-1526 REDUCE CONGESTION, IMPROVE PL SPP 260,000
SAFETY, AND ENHANCE MOBILITY ON DN
JOHN HARPER HWY (KY 1526) FROM I-65 RW
(MP 11.4) TO KY 61 (MP 12.9) (2024CCN) UT
CN
Project Cost: 260,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 37
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Bullitt 80354 US-31 Improve traffic operations and improve PL
safety along US 31E DN
(Louisville-Bardstown Rd) from the RW STPF 880,000
Bullitt/Nelson County Line to KY 44. UT STPF 860,000
Consider a 2+1 configuration and/or
CN STPF 15,150,000
Project Cost: 0 880,000 860,000 15,150,000
Bullitt 80412 KY-44 Improve safety and reduce congestion on PL
KY 44 between the I-65 interchange and DN
the KY 61 intersection. Consider access RW
management. UT SPP 800,000
CN SPP 1,300,000
Project Cost: 800,000 1,300,000 0 0
Bullitt 80419 KY-1450 Improve safety and reduce congestion at PL
the intersection of KY 1450 and KY 1526 DN SPP 1,000,000
east of the I-65/KY 1526 interchange. RW SPP 400,000
UT SPP 300,000
CN SPP 5,000,000
Project Cost: 1,000,000 700,000 5,000,000 0
Bullitt 80429 KY-61 Improve safety and reduce congestion on PL
KY 61 from KY 44 in Shepherdville to KY DN SPP 5,670,000
245. Project will evaluate widening from 2 RW SPP 2,130,000
to 4 travel lanes and consider other lower UT SPP 3,270,000
impact alternatives. (MP 9.42-14.5)
CN SPP 25,605,000
Project Cost: 0 5,670,000 2,130,000 28,875,000
Total for Bullitt county PL 260,000
DN 3,390,000 10,670,000 410,093
RW 29,420,000 2,130,000
UT 21,200,000 16,120,000 13,110,000 3,270,000
CN 46,200,000 137,030,000 31,223,952 84,155,000
Total Amounts: 71,050,000 193,240,000 46,874,045 87,425,000
38 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Butler 125.1500 KY-269 OPERATION OF REED'S FERRY AT PL
LOGANSPORT FOR FY 2027 THROUGH DN
FY 2032.(12CCR) (2020CCR) (2024CCR) RW
UT
CN SPP 173,000 173,000 173,000 173,000
Project Cost: 173,000 173,000 173,000 173,000
Butler 8504.1000 KY-369 OPERATION OF THE ROCHESTER FERRY PL
BY THE BUTLER AND OHIO COUNTY DN
FERRY AUTHORITY FOR FY 2027-2032. RW
(12CCR) (2020CCR) (2024CCR) UT
CN SPP 173,000 173,000 173,000 173,000
Project Cost: 173,000 173,000 173,000 173,000
Butler 10032 US-231 BRIDGE PROJECT IN BUTLER COUNTY ON PL
(016B00012N) US-231 AT RENFROW DN BRX 104,535
CREEK RW
UT
CN BRX 696,900
Project Cost: 0 0 0 801,435
Butler 10033 KY-70 BRIDGE PROJECT IN BUTLER COUNTY ON PL
(016B00016N) KY-70 AT MUDDY CREEK DN BRZ 845,336
RW
UT
CN BRZ 5,635,575
Project Cost: 0 6,480,911 0 0
Butler 10060 I -165 ADDRESS DEFICIENCIES OF BRIDGE ON PL
I-165 OVER GREEN RIVER (016B00061N) DN BRO 220,000
RW
UT
CN BRO 2,200,000
Project Cost: 0 0 0 2,420,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 39
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Butler 22311 US-231 ADDRESS CONDITION OF US-231 FROM PL
MILEPOINT 10.68 TO MILEPOINT 10.94 DN STP4 88,000
RW
UT
CN STP4 1,012,000
Project Cost: 1,100,000 0 0 0
Butler 80406 KY-79 Lane departure safety improvements on PL
KY-79 between the KY-70 crossroads DN
and the Grayson County line RW SPP 500,000
UT SPP 500,000
CN SPP 2,500,000
Project Cost: 0 1,000,000 2,500,000 0
Butler 80407 KY-185 Improve safety and mobility on KY 185 PL
from MP 3 to MP 4.8. DN SPP 1,500,000
RW SPP 1,250,000
UT SPP 500,000
CN SPP 5,250,000
Project Cost: 2,750,000 500,000 5,250,000 0
Butler 80408 KY-70 Improve safety and mobility on KY 70 from PL
US 231 to I 165 DN SPP 1,000,000
RW SPP 4,000,000
UT SPP 4,000,000
CN SPP 7,000,000
Project Cost: 1,000,000 4,000,000 4,000,000 7,000,000
Butler 80412 KY-70 Widen KY-70 to provide turning lanes at PL
KY 1468 (Gardiner Lane) and new DN
industrial access road. Extend Industrial RW SPP 200,000
Drive to KY 70 for new access to UT SPP 1,100,000
industrial park.
CN SPP 2,900,000
Project Cost: 0 1,300,000 2,900,000 0
40 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Butler county PL
DN 2,588,000 845,336 324,535
RW 1,250,000 4,700,000
UT 2,100,000 4,000,000
CN 1,358,000 5,981,575 10,996,000 10,242,900
Total Amounts: 5,196,000 13,626,911 14,996,000 10,567,435
Caldwell 11 I -24 STUDY THE I-24 CORRIDOR FROM THE PL NH 750,000
I-69 INTERCHANGE IN LYON COUNTY TO DN
THE TENNESSEE STATE LINE. RW
UT
CN
Project Cost: 750,000 0 0 0
Caldwell 187.6000 US-641 RELOCATE US-641 FROM SOUTH OF THE PL
LYON/CALDWELL COUNTY LINE TO DN
FREDONIA, 4.5 MILES. (2020CCN) RW
(2022CCR) (2024CCR) UT
CN STPF 5,000,000 17,000,000
Project Cost: 5,000,000 17,000,000 0 0
Caldwell 10062 I -69 BRIDGE PROJECT IN CALDWELL COUNTY PL
ON (017B00033L and 017B00033R) I-69 DN BRO 1,687,179
AT TRADEWATER RIVER RW
UT
CN BRO 11,247,863
Project Cost: 0 0 12,935,042 0
Caldwell 10064 CR-1011 BRIDGE PROJECT IN CALDWELL COUNTY PL
ON (017B00060N) LEWISTOWN CHURCH DN BRX 365,223
R AT I-69 RW
UT
CN
Project Cost: 0 0 0 365,223
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 41
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Caldwell 22080 I -69 ADDRESS CONDITION OF I-069 FROM PL
MILEPOINT 77.994 TO MILEPOINT 79.35 DN NHPM 120,000
RW
UT
CN NHPM 1,200,000
Project Cost: 1,320,000 0 0 0
Caldwell 22081 I -69 ADDRESS CONDITION OF I-069 FROM PL
MILEPOINT 79.35 TO MILEPOINT 82.934 DN STP3 320,000
RW
UT
CN STP3 3,201,221
Project Cost: 3,521,221 0 0 0
Caldwell 22082 I -69 ADDRESS CONDITION OF I-069 FROM PL
MILEPOINT 86.344 TO MILEPOINT 89.848 DN STP4 300,000
RW
UT
CN STP4 3,018,190
Project Cost: 3,318,190 0 0 0
Caldwell 80304 CS-1006 RECONSTRUCT CS 1006 (JEFF WATSON PL
RD) FROM KY 91 TO KY 2617. (2024CCN) DN SPP 730,000
RW SPP 860,000
UT SPP 1,680,000
CN SPP 3,330,000
Project Cost: 730,000 860,000 1,680,000 3,330,000
Caldwell 80307 US-62 ADDRESS TRAFFIC CONTROL AT THE PL
INTERSECTION OF KY2617 AND US62 DN NH 780,000
WEST TO IMPROVE TURN MOVEMENTS RW NH 500,000
FROM KY 2617. (2024CCN) UT NH 400,000
CN NH 2,000,000
Project Cost: 780,000 500,000 400,000 2,000,000
42 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Caldwell 80308 KY-91 EXTEND 3 LANE SECTION OF KY 91 PL
(MARION ROAD) FROM MP 12.9 TO DN
BECKNER LANE (MP 13.4) (2024CCN) RW SPP 600,000
UT SPP 300,000
CN SPP 2,000,000
Project Cost: 900,000 2,000,000 0 0
Total for Caldwell county PL 750,000
DN 2,250,000 1,687,179 365,223
RW 600,000 1,360,000
UT 300,000 2,080,000
CN 12,419,411 19,000,000 11,247,863 5,330,000
Total Amounts: 16,319,411 20,360,000 15,015,042 5,695,223
Calloway 10103 KY-893 BRIDGE PROJECT IN CALLOWAY PL
COUNTY ON (018B00079N) KY-893 AT DN BRZ 189,934
BRANCH OF MCCULLOUGH CRE RW
UT
CN BRZ 1,266,225
Project Cost: 0 0 0 1,456,159
Calloway 80100 PF-9999 PLANNING STUDY FOR SCENIC BYWAY PL SPP 250,000
ALONG KENTUCKY LAKE (2020CCN) DN
(2024CCR) RW
UT
CN
Project Cost: 250,000 0 0 0
Calloway 80200 CS-1047 Address congestion, geometric PL
deficiencies, and access issues from DN
KY121 to Utterback Road in Murray. RW SPP 3,300,000
(2022CCN) (2024CCR) UT SPP 3,240,000
CN SPP 8,640,000
Project Cost: 3,300,000 3,240,000 8,640,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 43
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Calloway 80316 KY-94 CORRECT ROADWAY GEOMETRICS AND PL
ADDRESS CONGESTION AND SAFETY DN SPP 270,000
ISSUES AT KY 94 AND KY 1660 (JOHNNY RW SPP 320,000
ROBERTSON ROAD) NEAR MURRAY. UT SPP 210,000
(2024CCN)
CN SPP 750,000
Project Cost: 270,000 320,000 210,000 750,000
Calloway 80412 KY-1550 Improve existing alignment to PL
accommodate addition of right drop lane DN
and two-way left turn lane for new RW SPP 150,000
entrances to proposed Murray Elementary UT SPP 200,000
School.
CN SPP 750,000
Project Cost: 350,000 750,000 0 0
Total for Calloway county PL 250,000
DN 270,000 189,934
RW 3,450,000 320,000
UT 200,000 3,240,000 210,000
CN 750,000 8,640,000 2,016,225
Total Amounts: 4,170,000 4,310,000 8,850,000 2,206,159
Campbell 23 I -471 ADD LANE ON RAMP FROM EASTBOUND PL
I-275 TO NORTHBOUND I-471. (2024CCR) DN NH 2,320,000
RW
UT
CN NH 5,000,000 5,000,000
Project Cost: 7,320,000 5,000,000 0 0
Campbell 81 I -471 REDUCE CONGESTION ALONG THE I-471 PL NH 1,080,000
CORRIDOR FROM US-27 TO OHIO STATE DN NH 45,000,000
LINE. (2024CCR) RW NH 35,000,000
UT NH 20,000,000
CN NH 1,750,000,000
Project Cost: 46,080,000 0 55,000,000 1,750,000,000
44 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Campbell 352.1000 PF-9999 Extend Pond Creek Road from US 27 to PL
Persimmon Grove, KY 1121. (2024BOP) DN
RW
UT
CN SPP 10,000,000 12,000,000
Project Cost: 10,000,000 12,000,000 0 0
Campbell 352.2000 PF-9999 Extend Pond Creek Road from Persimmon PL
Grove, KY 1121 to AA Highway, KY 9 . DN
(2024BOP) RW SPP 22,000,000
UT SPP 8,640,000
CN SPP 46,400,000
Project Cost: 30,640,000 46,400,000 0 0
Campbell 1086 KY-8 REPLACE 4TH STREET BRIDGE OVER THE PL
LICKING RIVER BETWEEN COVINGTON DN
AND NEWPORT; BRIDGE NUMBER RW
059B00037N UT
CN BRO 2,450,000
Project Cost: 2,450,000 0 0 0
Campbell 8104 I -471, KY-8 CONSTRUCT NEW I-471 SOUTHBOUND PL
OFF-RAMP AT KY-8 (SEE ALSO DN
6-183.00). (02CCN)(06CCN) (2020CCN) RW NH 5,750,000
UT NH 1,080,000
CN NH 31,200,000
Project Cost: 0 6,830,000 31,200,000 0
Campbell 10035 I -471 BRIDGE PROJECT IN CAMPBELL COUNTY PL
ON (019B00039L) I-471 NC AT OHIO DN BRO 1,500,000
RIVER RW
UT
CN BRO 15,000,000
Project Cost: 0 16,500,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 45
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Campbell 10036 I -471 BRIDGE PROJECT IN CAMPBELL COUNTY PL
ON (019B00039R) I-471 AT OHIO RIVER DN BRO 1,500,000
RW
UT
CN BRO 15,000,000
Project Cost: 0 16,500,000 0 0
Campbell 10051 I -275 ADDRESS DEFICIENCIES OF BRIDGE ON PL
I-275 WB OVER OHIO RIVER @ BRENT DN
(019B00040L) RW
UT
CN BRO 40,000,000
Project Cost: 0 0 0 40,000,000
Campbell 10053 I -275 ADDRESS DEFICIENCIES OF BRIDGE ON PL
I-275 EB OVER OHIO RIVER @ BRENT DN
(019B00040R) RW
UT
CN FBP 40,000,000
Project Cost: 0 0 0 40,000,000
Campbell 10064 US-27 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US-27 OVER OHIO RIVER (019B00076N) DN BRX 1,800,000
RW
UT
CN BRX 18,000,000
Project Cost: 0 19,800,000 0 0
Campbell 20010 I -275 ADDRESS CONDITION OF I-275 FROM PL
MILEPOINT 73.061 TO MILEPOINT 77.579 DN NHPM 1,070,000
RW
UT
CN NHPM 10,680,000
Project Cost: 0 0 0 11,750,000
46 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Campbell 20017 US-27 ADDRESS CONDITION OF US-27 FROM PL
MILEPOINT 8.83 TO MILEPOINT 10.52 DN STP3 120,000
RW
UT
CN STP3 1,380,000
Project Cost: 0 1,500,000 0 0
Campbell 80311 KY-9 IMPROVE SAFETY AND REDUCE PL
CONGESTION AT THE I-275 DN SPP 5,000,000
INTERCHANGE WITH KY-9 (AA HWY.) RW SPP 500,000
(2024CCN) UT SPP 2,000,000
CN SPP 50,000,000
Project Cost: 5,000,000 500,000 2,000,000 50,000,000
Campbell 80313 PF-9999 Construct a roundabout at the intersection PL
of KY 1892 (Grand Ave) and Highland DN SPP 810,000
Ave (2024CCN) RW SPP 3,300,000
UT SPP 1,160,000
CN SPP 3,100,000
Project Cost: 810,000 4,460,000 3,100,000 0
Campbell 80314 US-27 IMPROVE CONDITIONS BY PL
CONSTRUCTING A SOUTHBOUND TRUCK DN SPP 780,000
CLIMBING LANE NORTH OF KY 709, AND RW SPP 1,500,000
RECONSTRUCT THE INTERSECTION OF UT SPP 750,000
KY 709 AND US 27 TO ALLOW FOR
CN SPP 7,750,000
Project Cost: 780,000 2,250,000 7,750,000 0
Total for Campbell county PL 1,080,000
DN 53,910,000 4,920,000 1,070,000
RW 22,000,000 11,050,000 35,000,000
UT 8,640,000 2,990,000 22,000,000
CN 17,450,000 112,780,000 42,050,000 1,890,680,000
Total Amounts: 103,080,000 131,740,000 99,050,000 1,891,750,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 47
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Carlisle 333 US-51, US-62 CORRECT GEOMETRIC DEFICIENCIES AT PL
INTERSECTION OF US-51/US-62/FRONT DN
ST/ELM ST IN BARDWELL TO ADDRESS RW
FLOW, SAFETY, AND ACCESS ISSUES. UT
(12CCR)(18CCN)
CN SPP 340,000
Project Cost: 340,000 0 0 0
Carlisle 10107 KY-80 BRIDGE PROJECT IN CARLISLE COUNTY PL
ON (020B00068N) KY-80 AT LONGGEAR DN BRX 117,079
CREEK RW
UT
CN BRX 780,528
Project Cost: 0 897,607 0 0
Carlisle 80302 US-62 CORRECT SUBSTANDARD ROADWAY PL
GEOMETRICS ON US-62 FROM KY 1181 DN
TO KY 408 TO ADDRESS ACCESS RW NH 500,000
ISSUES, SAFETY CONCERNS, FLOOD UT NH 1,000,000
PRONE AREA, AND REGIONAL
CN NH 6,000,000
Project Cost: 500,000 1,000,000 6,000,000 0
Carlisle 80303 US-62 IMPROVE SAFETY, MOBILITY, PL
CONNECTIVITY, AND ADDRESS DN
GEOMETRIC DEFICIENCIES ALONG US-62 RW NH 400,000
BETWEEN HOBBS ROAD/BOSWELL UT NH 300,000
ROAD TO KY 307. (2024CCN)
CN NH 2,500,000
Project Cost: 0 700,000 2,500,000 0
Carlisle 80309 US-51 CORRECT ROADWAY GEOMETRICS AND PL
IMPROVE SAFETY, ACCESS AND DN NH 900,000
REGIONAL CONNECTIVITY FROM RW NH 400,000
HICKMAN COUNTY LINE TO KY 1377 UT NH 2,500,000
SOUTH OF BARDWELL. (2024CCN)
CN NH 5,800,000
Project Cost: 900,000 2,900,000 0 5,800,000
48 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Carlisle 80323 US-51 CORRECT SUBSTANDARD ROADWAY PL
GEOMETRICS, TO IMPROVE TRAFFIC DN
FLOW, SAFETY AND ACCESS RW NH 1,000,000
MANAGEMENT ISSUES FROM KY 1377 TO UT NH 3,000,000
TRUMAN CREEK BRIDGE IN BARDWELL.
CN NH 7,000,000
Project Cost: 1,000,000 3,000,000 7,000,000 0
Carlisle 80331 US-62 IMPROVE INTERSECTION WITH US 62 AND PL
KY 1628 / PALESTINE RD (CR 1024). DN NH 750,000
(2024CCN) RW NH 500,000
UT NH 135,000
CN NH 900,000
Project Cost: 750,000 500,000 135,000 900,000
Total for Carlisle county PL
DN 1,650,000 117,079
RW 1,500,000 1,300,000
UT 6,800,000 135,000
CN 340,000 780,528 15,500,000 6,700,000
Total Amounts: 3,490,000 8,997,607 15,635,000 6,700,000
Carroll 20050 KY-467 ADDRESS CONDITION OF KY-467 FROM PL
MILEPOINT 0 TO MILEPOINT 4.52 DN STP5 64,000
RW
UT
CN STP5 736,000
Project Cost: 0 0 800,000 0
Carroll 80219 KY-36 Improve safety and mobility and address PL
geometric deficiencies at the intersection DN SPP 740,000
of KY 36 & KY 1492 (Locust Road). RW SPP 450,000
(2022CCN) (2024CCR) UT SPP 280,000
CN SPP 3,948,000
Project Cost: 740,000 450,000 280,000 3,948,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 49
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Carroll 80301 US-42 IMPROVE SAFETY AND MOBILITY AND PL
ADDRESS GEOMETRIC DEFICIENCIES DN SPP 2,160,000
ALONG US 42 FROM THE WESTERN CITY RW SPP 5,400,000
LIMIT OF GHENT TO THE GALLATIN UT SPP 930,000
COUNTY LINE. (2024CCN)
CN SPP 25,200,000
Project Cost: 2,160,000 6,330,000 25,200,000 0
Carroll 80302 KY-55 IMPROVE SAFETY AND MOBILITY AND PL
ADDRESS GEOMETRIC DEFICIENCIES DN SPP 4,320,000
ALONG KY 55 FROM KY 389 TO US 42. RW SPP 3,130,000
(2024CCN) UT SPP 1,800,000
CN SPP 51,200,000
Project Cost: 4,320,000 3,130,000 1,800,000 51,200,000
Carroll 80409 I-71 Widen I-71 to 6 lanes from KY 227 in PL
Carroll County to KY 1039 in Gallatin DN NH 9,364,253
County. RW
UT NH 936,425
CN NH 121,735,290
Project Cost: 9,364,253 936,425 0 121,735,290
Carroll 80410 I-71 Widen I 71 to 6 lanes in Carroll County and PL
build new structure over KY DN NH 1,070,200
227/Kentucky River. RW
UT NH 142,693
CN NH 7,000,000 7,269,338
Project Cost: 1,070,200 142,693 7,000,000 7,269,338
Carroll 80411 KY-389 Improve safety along KY 389 from I 71 to PL
KY 55. DN SPP 3,300,000
RW SPP 3,000,000
UT SPP 700,000
CN SPP 27,300,000
Project Cost: 3,300,000 3,000,000 700,000 27,300,000
50 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Carroll 80417 KY-36 RECONSTRUCTION FROM MILTON TO US PL
42 AT CARROLLTON to increase safety, DN SPP 11,250,000
ease travel and reduce travel times on KY RW SPP 18,000,000
36 (MP 0 to 8.132) UT SPP 7,000,000
CN SPP 150,000,000
Project Cost: 0 0 11,250,000 175,000,000
Total for Carroll county PL
DN 20,954,453 11,314,000
RW 11,980,000 18,000,000
UT 2,009,118 2,780,000 7,000,000
CN 32,936,000 361,452,628
Total Amounts: 20,954,453 13,989,118 47,030,000 386,452,628
Carter 8401 US-60 RECONSTRUCT US-60 FROM WEST OF PL
GLENWOOD HOLLOW ROAD TO EAST OF DN STP2 1,040,000
KY-3296. THE PROJECT SHALL INCLUDE RW SPP 3,450,000
12' LANES, WIDE PAVED SHOULDERS, UT SPP 4,480,000
UNOBSTRUCTED CLEAR ZONES,
CN SPP 24,000,000
Project Cost: 1,040,000 3,450,000 4,480,000 24,000,000
Carter 9021 US-60 CONSTRUCT TURN LANES AND SAFETY PL
FEATURES AT PROPOSED NEW HIGH DN
SCHOOL AND CAREER TECHNOLOGY RW
CENTER. (2024CCR) UT
CN SPP 1,040,000
Project Cost: 1,040,000 0 0 0
Carter 10079 KY-174 BRIDGE PROJECT IN CARTER COUNTY ON PL
(022B00033N) KY-174 AT TYGARTS DN BRX 329,052
CREEK RW
UT
CN BRX 2,193,682
Project Cost: 0 2,522,734 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 51
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Carter 22055 I -64 ADDRESS CONDITION OF I-064 FROM PL
MILEPOINT 171.2 TO MILEPOINT 180.812 DN NHPM 780,000
RW
UT
CN NHPM 7,829,870
Project Cost: 0 8,609,870 0 0
Carter 80050 US-60 IMPROVE US-60 GEOMETRY BEGINNING PL
TERMINI AT NEW CONSTRUCTION AT DN
OLIVE HILL MP 12.4 EXTENDING 1.1 MILES RW STP1 7,700,000
TO I-64 EXIT 161.(18CCN) (2022CCR) UT STP1 7,020,000
(2024CCR)
CN STP1 11,600,000
Project Cost: 7,700,000 7,020,000 11,600,000 0
Carter 80201 KY-3297 Improve safety and operational efficiency PL
of KY 3297 near East Carter Middle DN
School and the new sports complex. RW SPP 280,000
(2022CCN) (2024CCR) UT SPP 220,000
CN SPP 710,000
Project Cost: 280,000 220,000 710,000 0
Carter 80304 PF-9999 Improve connectivity in Grayson between PL
KY 1 (Carol Malone Blvd) and KY 3297 DN
(Midland Trail). (2024CCN) RW SPP 6,600,000
UT SPP 4,640,000
CN SPP 8,100,000
Project Cost: 0 11,240,000 8,100,000 0
Carter 80305 KY-174 Curve correction on KY 174 to improve PL
horizontal alignment which will include a DN SPP 1,350,000
bridge replacement. (2024CCN) RW SPP 720,000
UT SPP 700,000
CN SPP 10,540,000
Project Cost: 1,350,000 720,000 700,000 10,540,000
52 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Carter 80409 US-60 Improve US 60 by upgrading geometrics to PL
a 45mph design speed with wider DN NH 4,000,000
shoulders and an improved clear zone RW NH 7,000,000
(MP 18.2-23.9) UT NH 6,000,000
CN NH 40,000,000
Project Cost: 4,000,000 13,000,000 40,000,000 0
Carter 80410 US-60 Improve US 60 by upgrading geometrics to PL
a 45mph design speed with wider DN NH 5,000,000
shoulders and an improved clear zone RW NH 10,000,000
(MP 13.4 to 18.0) UT NH 7,500,000
CN NH 50,000,000
Project Cost: 5,000,000 17,500,000 50,000,000 0
Carter 80411 I-64 Construct a new interchange between PL
I-64 and US-60 west of Grayson to DN NH 8,000,000
provide better access and connectivity to RW NH 5,000,000
the new Carter County School site UT NH 44,000,000
CN NH 40,000,000
Project Cost: 8,000,000 49,000,000 40,000,000 0
Total for Carter county PL
DN 19,390,000 1,109,052
RW 7,980,000 32,770,000
UT 69,380,000 5,180,000
CN 1,040,000 10,023,552 150,410,000 34,540,000
Total Amounts: 28,410,000 113,282,604 155,590,000 34,540,000
Casey 164 PF-9999, IMPROVE SAFETY AND GEOMETRIC PL
US-127 DEFICIENCIES ALONG US 127 AT DN
DUNNVILLE (2022CCN) RW
UT NH 1,030,000
CN NH 13,500,000
Project Cost: 1,030,000 0 13,500,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 53
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Casey 8701 KY-70 NEW ALIGNMENT ON KY-70 FROM MP PL
16.8 TO 19 (12CCN) (2022CCN) DN SPP 1,200,000
(2024CCR) RW SPP 2,420,000
UT SPP 2,240,000
CN SPP 20,420,000
Project Cost: 3,620,000 2,240,000 20,420,000 0
Casey 8702 US-127 CORRECT VERTICAL ALIGNMENT ON US PL
127 AND KY 1552 NEAR INTERSECTION. DN NH 210,000
(12CCN) RW NH 260,000
(2024CCN) UT NH 290,000
CN NH 1,950,000
Project Cost: 210,000 260,000 290,000 1,950,000
Casey 8703 KY-70 RECONSTRUCT BELL HILL FROM MP 10.4 PL
TO MP 11.9.(12CCN)(16CCR)(18CCN) DN
(2020CCR) (2024CCR) RW
UT SPP 1,090,000
CN SPP 14,040,000
Project Cost: 0 1,090,000 14,040,000 0
Casey 8704 KY-49 RECONSTRUCT BRUSH CREEK HILL FROM PL
MP 1.8 TO MP 2.8.(12CCN)(16CCR) DN
(18CCN) (2020CCR) (2022CCR) RW
(2024CCR) UT SPP 1,040,000
CN SPP 12,960,000
Project Cost: 1,040,000 0 12,960,000 0
Casey 8706 KY-70 CONSTRUCT A NEW STORM DRAINING PL
SYSTEM, CURB AND GUTTER FROM DN
BELDON AVENUE EASTWARD AND RW
CONSTRUCT A NEW LEFT TURN ONTO UT PROT 6,370,000
COLLEGE STREET.(12CCN)
CN PROT 13,680,000
Project Cost: 6,370,000 0 13,680,000 0
54 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Casey 20019 KY-910 ADDRESS CONDITION OF KY-910 FROM PL
MILEPOINT 1.464 TO MILEPOINT 8.801 DN STP5 160,000
RW
UT
CN STP5 1,840,000
Project Cost: 0 0 0 2,000,000
Casey 80150 US-127 ADD LANES (TWO PLUS ONE) TO US 127 PL
FROM LIBERTY TO THE LINCOLN CO LINE DN
(2020CCN) (2024CCR) RW NH 3,620,000
UT NH 4,440,000
CN SPP 26,880,000
Project Cost: 3,620,000 0 4,440,000 26,880,000
Casey 80415 KY-49 Improve safety by improving the PL
geometrics along KY 49 (MP 0.114 to 1.8) DN SPP 1,012,000
RW SPP 2,590,000
UT SPP 2,024,000
CN SPP 11,802,000
Project Cost: 1,012,000 4,614,000 11,802,000 0
Total for Casey county PL
DN 2,422,000 160,000
RW 6,040,000 2,850,000
UT 8,440,000 5,354,000 4,730,000
CN 86,402,000 30,670,000
Total Amounts: 16,902,000 8,204,000 91,132,000 30,830,000
Christian 10 I -24 Improve capacity and mobility of the PL
I-24/KY 115 interchange (Exit 89) in DN
Christian County, KY (2022BOP). RW
(2024CCR) UT NH 2,000,000
CN NH 18,000,000
Project Cost: 2,000,000 18,000,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 55
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Christian 136 PF-9999 EXTEND KY-1682 FROM THE E.T. PL
BREATHITT PARKWAY TO US-68/KY-80 DN
EAST OF HOPKINSVILLE (HOPKINSVILLE RW SPP 5,170,000
NORTHEAST BYPASS). (2020CCN) UT SPP 2,710,000
(2022CCR) (2024CCR)
CN SPP 41,010,000
Project Cost: 5,170,000 2,710,000 41,010,000 0
Christian 227 KY-1007, RECONSTRUCT KY 1007 FROM US 68 TO PL
PF-9999 KY 1682 IN HOPKINSVILLE. (INCLUDES DN
2-227.10)(2020CCR) (2022CCR) RW SPP 7,250,000
(2024CCR) UT SPP 7,400,000
CN SPP 12,320,000
Project Cost: 7,250,000 7,400,000 12,320,000 0
Christian 8703 KY-107 IMPROVE KY-107 FROM THE BYPASS TO PL
KY-380.(12CCN)(14CCR) (2020CCR) DN
(2024CCN) RW
UT SPP 1,800,000
CN SPP 2,530,000
Project Cost: 1,800,000 2,530,000 0 0
Christian 10066 US-41 BRIDGE PROJECT IN CHRISTIAN COUNTY PL
ON (024B00021N) US-41 AT CSX DN BRX 624,338
RAILROAD RW
UT
CN
Project Cost: 0 0 0 624,338
Christian 10067 KY-117 BRIDGE PROJECT IN CHRISTIAN COUNTY PL
ON (024B00034N) KY-117 AT SINKING DN BRX 802,254
FORK CREEK RW
UT
CN
Project Cost: 0 0 0 802,254
56 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Christian 10070 KY-1453 BRIDGE PROJECT IN CHRISTIAN COUNTY PL
ON (024B00062N) KY-1453 AT DN BRX 279,575
MONTGOMERY CREEK RW
UT
CN BRX 1,863,831
Project Cost: 0 0 0 2,143,406
Christian 10074 KY-800 BRIDGE PROJECT IN CHRISTIAN COUNTY PL
ON (024B00099N) KY-800 AT PENNYRILE DN BRX 1,257,758
PARKWAY RW
UT
CN
Project Cost: 0 0 0 1,257,758
Christian 20061 US-41 ADDRESS CONDITION OF US-41A FROM PL
MILEPOINT 4 TO MILEPOINT 12.56 DN STP3 760,000
RW
UT
CN STP3 8,740,000
Project Cost: 760,000 8,740,000 0 0
Christian 22012 I -24 ADDRESS CONDITION OF I-024 FROM PL
MILEPOINT 69.83 TO MILEPOINT 76.142 DN NHPM 3,210,000
(75 NON-CARDINAL) RW
UT
CN NHPM 32,095,800
Project Cost: 0 0 0 35,305,800
Christian 22014 I -24 ADDRESS CONDITION OF I-024 PL
NON-CARDINAL DIRECTION FROM DN
MILEPOINT 75 TO MILEPOINT 85.563 RW
UT
CN NHPM 3,138,790
Project Cost: 3,138,790 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 57
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Christian 22320 US-41 ADDRESS CONDITION OF US-41 FROM PL
MILEPOINT 9.2 TO MILEPOINT 11.39 DN NHPM 1,200,000
RW
UT
CN NHPM 13,800,000
Project Cost: 0 0 0 15,000,000
Christian 80001 US-41 US 41A NEW TURNING LANE PL
NORTHBOUND AT EXISTING MEDIAN DN SPP 60,000
CROSSOVER NEAR MILEPOST 11.4. CITY RW
TO CONSTRUCT AND BE REIMBURSED. UT
(18CCN) (2020CCR)
CN SPP 210,000
Project Cost: 60,000 210,000 0 0
Christian 80103 I -24 ADDRESS SAFETY ISSUES BY PL
INSTALLING INTERCHANGE LIGHTING DN
(2020CCN) RW
UT
CN SPP 820,000
Project Cost: 820,000 0 0 0
Christian 80250 KY-107 IMPROVE SAFETY AND MOBILITY BY PL
WIDENING AND CORRECTING GEOMETRIC DN
DEFICIENCIES ON KY 107 FROM RW
MILEPOINT 15.0 TO MILEPOINT 15.6 UT
(2022CCN) (2024CCR)
CN SPP 3,100,000
Project Cost: 3,100,000 0 0 0
Christian 80250.1000KY-107 Provide left and right turn lanes and PL
improve sight distance on KY 107 at the DN
intersection of KY 107 and Lovers Lane. RW
UT
CN SPP 1,680,000
Project Cost: 1,680,000 0 0 0
58 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Christian 80417 KY-115 Address safety and congestion issues on PL
KY 115 from KY 911 to KY 400 (State line DN SPP 1,000,000
road). Consider a roundabout at KY RW SPP 2,500,000
115/KY 400 (MP 0.2 - 1.2) UT SPP 1,500,000
CN SPP 6,000,000
Project Cost: 1,000,000 2,500,000 1,500,000 6,000,000
Christian 80418 KY-115 Address safety and congestion issues on PL
KY 115 from KY 911 to I24. (MP 1.261 - DN SPP 900,000
2.663) RW SPP 1,900,000
UT SPP 1,500,000
CN SPP 10,800,000
Project Cost: 0 900,000 3,400,000 10,800,000
Total for Christian county PL
DN 1,820,000 900,000 7,373,925
RW 12,420,000 2,500,000 1,900,000
UT 3,800,000 10,110,000 3,000,000
CN 8,738,790 29,480,000 53,330,000 64,559,631
Total Amounts: 26,778,790 42,990,000 58,230,000 71,933,556
Clark 27 I -64 REPAIR, RENOVATE, AND PRESERVE THE PL
HISTORICAL I-64 EB REST AREA DN
FACILITY IN CLARK COUNTY. RW
UT
CN SPP 3,140,000
Project Cost: 3,140,000 0 0 0
Clark 3047 I -64 Clark County Rest Area Renovation PL
Located on I-64 at MP 98. (2024BOP) DN
RW
UT
CN SPP 4,890,000
Project Cost: 4,890,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 59
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Clark 8401 KY-1958 NEW CONSTRUCTION TO EXTEND PL
VETERANS MEMORIAL PARKWAY FROM DN
IRVINE RD (KY89) TO BOONEWBORO RD RW NH 10,000,000
(KY 627) UT NH 12,400,000
CN NH 53,230,000
Project Cost: 22,400,000 53,230,000 0 0
Clark 8952 US-60 RECONSTRUCT US 60 FOR SAFETY PL
IMPROVEMENTS FROM I-64 IN CLARK DN SPP 1,730,000
COUNTY (MP 14.210)) TO 500 FEET WEST RW SPP 4,840,000
OF SEWELL SHOP ROAD (MP 17.032). UT SPP 4,370,000
(16CCN)(18CCN) (2022CCR) (2024CCR)
CN SPP 11,150,000
Project Cost: 1,730,000 9,210,000 11,150,000 0
Clark 8953 US-60 RECONSTRUCT US 60 FOR SAFETY PL
IMPROVEMENTS FROM 500 FEET WEST DN SPP 2,650,000
OF SEWELL SHOP ROAD (MP 17.032) IN RW SPP 4,440,000
CLARK COUNTY TO 500 FEET WEST OF UT SPP 4,160,000
BENTBROOK (MP 2.007) IN
CN SPP 14,670,000
Project Cost: 2,650,000 8,600,000 14,670,000 0
Clark 22155 KY-9000 ADDRESS CONDITION OF Bert T. Combs PL
Mountain Parkway CARDINAL DIRECTION DN NHPM 500,000
FROM MILEPOINT 5.341 TO MILEPOINT RW
10.227 UT
CN NHPM 5,000,000
Project Cost: 0 5,500,000 0 0
Clark 80151 US-60 MODERNIZE AND IMPROVE CAPACITY ON PL
US 60 FROM KY 859 (HALEY RD) TO KY DN SPP 4,090,000
1958 (BYPASS RD) IN CLARK COUNTY. RW SPP 11,740,000
(2020CCN) (2022CCR) (2024CCR) UT SPP 8,730,000
CN SPP 34,450,000
Project Cost: 4,090,000 11,740,000 8,730,000 34,450,000
60 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Clark 80350 KY-1923 New construction of KY 1923 PL
(Waterworks Road) between MP 4.2 and DN SPP 940,000
5.0. This includes a new crossing over RW SPP 550,000
the West Fork of Lower Howard Creek UT SPP 450,000
(2024CCN)
CN SPP 6,100,000
Project Cost: 940,000 550,000 450,000 6,100,000
Clark 80358 CR-1137 Bridge Rehab/Replacement on Red River PL
Road (CR 1137) at MP 0.19-0.2 over the DN BRX 210,038
CSX Railroad approx. 0.20 miles west of RW
KY 89 (025R00614N) UT
CN BRX 1,400,252
Project Cost: 0 1,610,290 0 0
Clark 80426 KY-1927 Reconstruct KY 1927 from 1000ft W of PL
KY 1923 to Winchester Bypass (MP 0.371 DN SPP 3,500,000
to 6.826) RW SPP 5,000,000
UT SPP 5,000,000
CN SPP 22,000,000
Project Cost: 0 3,500,000 10,000,000 22,000,000
Total for Clark county PL
DN 9,410,000 4,210,038
RW 10,000,000 21,570,000 5,000,000
UT 12,400,000 8,530,000 14,180,000
CN 8,030,000 59,630,252 25,820,000 62,550,000
Total Amounts: 39,840,000 93,940,290 45,000,000 62,550,000
Clay 8861 KY-638 IMPROVE SAFETY AND SIGHT DISTANCE PL
ALONG KY 638 (MP 6.7 TO MP 7.1) AND DN SPP 80,000
ITS INTERSECTION WITH KY 3476. RW SPP 160,000
(14CCN)(18CCN) (2020CCR) UT SPP 340,000
CN SPP 1,560,000
Project Cost: 80,000 160,000 340,000 1,560,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 61
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Clay 8910 HR-9006 UPGRADE ROUTE FROM SOMERSET TO PL
HAZARD TO INTERSTATE STANDARDS: 4 DN NH 1,000,000
LANE FROM CLAY/LAUREL LINE TO RW SPP 15,000,000
MANCHESTER (JUST PAST EXIT 20 AT UT SPP 11,000,000
BRIDGE OVER KY 80/US 421), MP 10.593
CN SPP 30,000,000 30,000,000 38,000,000
Project Cost: 27,000,000 30,000,000 30,000,000 38,000,000
Clay 8911 HR-9006 UPGRADE ROUTE FROM SOMERSET TO PL
HAZARD TO INTERSTATE STANDARDS: 4 DN NH 1,000,000
LANE FROM MANCHESTER TO RW SPP 18,000,000
CLAY/LESLIE LINE; MP 21.498 TO MP UT SPP 5,000,000
35.929 (SEGMENT 8) (16CCN)(18CCN)
CN
Project Cost: 1,000,000 0 18,000,000 5,000,000
Clay 10179 KY-2438 BRIDGE PROJECT IN CLAY COUNTY ON PL
(026B00057N) KY-2438 AT GOOSE DN BRX 1,213,977
CREEK & WALK PATH RW
UT
CN
Project Cost: 0 0 1,213,977 0
Clay 10180 KY-1482 BRIDGE PROJECT IN CLAY COUNTY ON PL
(026B00060N) KY-1482 AT LITTLE DN BRX 121,086
BULLSKIN CREEK RW
UT
CN BRX 807,242
Project Cost: 0 0 0 928,328
Clay 10181 HR-9006 BRIDGE PROJECT IN CLAY COUNTY ON PL
(026B00073N) HR-9006 AT CSX RR-HAM DN BRO 1,534,312
BR RD-GOOSE C RW
UT
CN
Project Cost: 0 0 0 1,534,312
62 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Clay 10183 KY-3478 BRIDGE PROJECT IN CLAY COUNTY ON PL
(026B00102N) KY-3478 AT ROBINSON DN FBP2 179,671
CREEK RW
UT
CN FBP2 1,197,806
Project Cost: 0 0 0 1,377,477
Clay 10184 CR-1114 BRIDGE PROJECT IN CLAY COUNTY ON PL
(026C00016N) FRANK BOWLING ROAD DN
AT REDBIRD RIVER RW FBP2 10,000
UT FBP2 10,000
CN FBP2 1,045,350
Project Cost: 0 0 1,065,350 0
Clay 20042 HR-9006 ADDRESS CONDITION OF Hal Rogers PL
Daniel Boone Parkway FROM MILEPOINT DN STP5 180,000
27.785 TO MILEPOINT 35.929 RW
UT
CN STP5 1,780,000
Project Cost: 180,000 1,780,000 0 0
Clay 80251 US-421 CONSTRUCT NEW CONNECTOR ROAD PL
BETWEEN US 421 AT MP 17.51 TO DN
RAILROAD AVE. AT MP 0.1. THIS WILL RW
REQUIRE APPROXIMATELY 300' OF NEW UT
ROADWAY ALONG THE CONNECTOR, A
CN SPP 3,830,000
Project Cost: 3,830,000 0 0 0
Clay 80253 KY-3472 IMPROVE GEOMETRIC ALIGNMENT FROM PL
KY 3472 AT MP 1.7 CONTINUING PAST DN
THE BERT. T. COMBS PARK TO THE RW SPP 2,000,000
INTERSECTION OF BEECH CREEK ROAD UT SPP 12,760,000
AND WHITE OAK ROAD.
CN SPP 14,560,000
Project Cost: 2,000,000 12,760,000 14,560,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 63
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Clay 80254 CR-1004 IMPROVE GEOMETRIC ALIGNMENT FROM PL
THE INTERSECTION OF BEECH CREEK DN
ROAD AND WHITE OAK ROAD TO KY-11 RW SPP 2,200,000
AT MP 14.24. (APPROXIMATELY 4.0 UT SPP 1,250,000
MILES OF ROAD WAY TO IMPROVE)
CN SPP 16,000,000
Project Cost: 2,200,000 1,250,000 16,000,000 0
Clay 80411 KY-2076 Improve geometrics and drainage, and add PL
sidewalk. Improve shopping center DN SPP 500,000
intersection. RW SPP 1,000,000
UT SPP 600,000
CN SPP 6,000,000
Project Cost: 500,000 1,600,000 6,000,000 0
Total for Clay county PL
DN 2,760,000 1,213,977 1,835,069
RW 19,200,000 1,160,000 18,010,000
UT 11,000,000 14,610,000 350,000 5,000,000
CN 3,830,000 31,780,000 67,605,350 41,565,048
Total Amounts: 36,790,000 47,550,000 87,179,327 48,400,117
Clinton 8600 US-127 RELOCATION OF US 127 FROM KY 90 PL
INTERSECTION TO AARON RIDGE ROAD DN
(MP 11.7 TO MP 16.315) (2022CCN) RW
(2024CCR) UT
CN NH 46,680,000
Project Cost: 0 46,680,000 0 0
Clinton 8601.3000 US-127 RELOCATION OF US-127 FROM EAST OF PL
THE AARON RIDGE RD AND OLD US-127 DN
INTERSECTION, EXTENDING NORTHERLY RW
TO NORTH OF THE KY-3063 AND OLD UT
US-127 INTERSECTION. (SEE 8-108 AND
CN NH 20,000,000
Project Cost: 20,000,000 0 0 0
64 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Clinton 80313 KY-558 Improve safety and mobility of KY 558 PL SPP 400,000
from KY 90 to Russell/Clinton Co line DN SPP 1,040,000
(2024CCN) RW SPP 5,410,000
UT SPP 4,260,000
CN SPP 9,860,000
Project Cost: 1,440,000 5,410,000 4,260,000 9,860,000
Clinton 80405 US-127 Reduce congestion and improve mobility PL
on US 127X between Ferguson St and DN SPP 648,000
McWhorter Rd. RW SPP 1,296,000
UT SPP 1,296,000
CN SPP 3,888,000
Project Cost: 648,000 2,592,000 3,888,000 0
Total for Clinton county PL 400,000
DN 1,688,000
RW 6,706,000
UT 1,296,000 4,260,000
CN 20,000,000 46,680,000 3,888,000 9,860,000
Total Amounts: 22,088,000 54,682,000 8,148,000 9,860,000
Crittenden 326.1700 KY-91 OPERATION OF CAVE-IN-ROCK FERRY PL
AT OHIO RIVER FOR FY 2027 THROUGH DN
FY 2032 USING AUDITED COSTS AS THE RW
BASIS.(12CCR) (2020CCR) (2022CCR) UT
(2024CCR). This is Kentucky's share of
CN SPP 831,000 831,000 831,000 831,000
Project Cost: 831,000 831,000 831,000 831,000
Crittenden 80201 KY-295 Reconstruct and elevate a 0.12 mile PL
section of KY 295 above the floodplain DN
from M.P. 1.038 to M.P. 1.605 just south of RW
Dycusburg (2022CCN) UT
CN SPP 560,000
Project Cost: 560,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 65
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Crittenden 80334 CS-1094, UPGRADE STREET TO ACCOMMODATE PL
CS-1095 TRUCK TRAFFIC, ADDRESS SAFETY DN SPP 780,000
CONCERNS, ADDRESS GEOMETRIC RW SPP 500,000
DEFICIENCIES, POSSIBLE BIKE AND PED UT SPP 750,000
PATH. THIS PROJECT WILL EXTEND FROM
CN SPP 7,500,000
Project Cost: 780,000 500,000 750,000 7,500,000
Crittenden 80335 KY-120 On KY 120 reconstruct substandard PL
curve between Herman Travis Rd DN SPP 260,000
Intersection and Piney Creek (2024CCN) RW SPP 300,000
UT SPP 100,000
CN SPP 1,500,000
Project Cost: 260,000 400,000 1,500,000 0
Crittenden 80400 US-60 Improve safety, truck mobility, and access PL
at the Intersection of US-60 and US-641/E DN
Gum St. RW
UT
CN STP2 1,200,000
Project Cost: 1,200,000 0 0 0
Crittenden 80401 US-60 Improve safety and substandard PL
geometrics in curves along US-60 near DN
Rosebud Church Road RW STP2 250,000
UT STP2 200,000
CN STP2 900,000
Project Cost: 450,000 900,000 0 0
Total for Crittenden county PL
DN 1,040,000
RW 250,000 800,000
UT 200,000 100,000 750,000
CN 2,591,000 1,731,000 2,331,000 8,331,000
Total Amounts: 4,081,000 2,631,000 3,081,000 8,331,000
66 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Cumberland 8852 KY-90 Improve KY 90 from Pa Duerson Road PL
near Marrowbone extending Easterly to DN
Norris Branch. (14CCN)(18CCR RW SPP 5,250,000
UT SPP 5,250,000
CN SPP 47,250,000
Project Cost: 10,500,000 47,250,000 0 0
Total for Cumberland county PL
DN
RW 5,250,000
UT 5,250,000
CN 47,250,000
Total Amounts: 10,500,000 47,250,000 0 0
Daviess 8300.2000 KY-54 IMPROVE KY-54 FROM BOLD FORBES PL
WAY TO KY 1456 (THRUSTON-DERMONT DN
RD). DESIGN UNDER PARENT 2-8300.00. RW SPP 3,900,000
(2018BOP) (2022CCN) (2024CCR) UT SPP 5,710,000
CN SPP 5,460,000
Project Cost: 9,610,000 5,460,000 0 0
Daviess 8300.4000 KY-54 IMPROVE KY-54 FROM COUNTRYSIDE PL
DRIVE TO JACK HINTON RD. DESIGN DN
UNDER PARENT 2-8300.00. (2018BOP) RW
(2022CCR) (2024CCR) UT SPP 6,920,000
CN SPP 14,070,000
Project Cost: 6,920,000 14,070,000 0 0
Daviess 8801 KY-1456 ADDRESS SUBSTANDARD ROADWAY PL
GEOMETRICS AND SAFETY CONCERNS DN
ON KY 1456 FROM KY 54 TO HAYDEN RW
ROAD. MP 2.778 TO 4.714 (SEE UT STP1 4,370,000
2-8709.00)(14CCN)(16CCR) (2022CCN)
CN STP1 11,340,000
Project Cost: 0 4,370,000 11,340,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 67
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Daviess 10082 KY-662 BRIDGE PROJECT IN DAVIESS COUNTY PL
ON (030B00138N) KY-662 AT DN BRZ 649,139
BLACKFORD CREEK RW
UT
CN BRZ 4,327,594
Project Cost: 0 4,976,733 0 0
Daviess 20017 KY-81 ADDRESS CONDITION OF KY-81 FROM PL
MILEPOINT 11.89 TO MILEPOINT 13.32 DN STP3 120,000
RW
UT
CN STP3 1,380,000
Project Cost: 0 1,500,000 0 0
Daviess 20019 KY-2155 ADDRESS CONDITION OF KY-2155 FROM PL
MILEPOINT 0 TO MILEPOINT 1.99 DN NHPM 200,000
RW
UT
CN NHPM 2,300,000
Project Cost: 0 0 0 2,500,000
Daviess 20065 I -165 ADDRESS CONDITION OF I-165 FROM PL
MILEPOINT 59.474 TO MILEPOINT 64.001 DN NHPM 380,000
RW
UT
CN NHPM 3,863,248
Project Cost: 0 4,243,248 0 0
Daviess 20066 I -165 ADDRESS CONDITION OF I-165 FROM PL
MILEPOINT 64.001 TO MILEPOINT 70.185 DN STP3 520,000
RW
UT
CN STP3 5,207,854
Project Cost: 0 5,727,854 0 0
68 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Daviess 22138 I -165 ADDRESS CONDITION OF I-165 FROM PL
MILEPOINT 64.001 TO MILEPOINT 70.185 DN NHPM 560,000
(2024CCR) RW
UT
CN NHPM 5,600,000
Project Cost: 0 6,160,000 0 0
Daviess 22195 AU-9005 ADDRESS CONDITION OF Audubon PL
Parkway FROM MILEPOINT 15.883 TO DN STP5 1,160,000
MILEPOINT 23.441 RW
UT
CN STP5 11,600,000
Project Cost: 12,760,000 0 0 0
Daviess 80150 KY-144 ADDRESS SAFETY, CONGESTION, AND PL
MOBILITY ISSUES ON KY 144 FROM MP DN SPP 720,000
2.5 TO MP 3.75 INCLUDING 12 FOOT RW SPP 1,680,000
DRIVING LANES AND TURNING LANES UT SPP 2,240,000
WHERE NEEDED. (2020CCN) (2022CCR)
CN SPP 4,320,000
Project Cost: 720,000 1,680,000 2,240,000 4,320,000
Daviess 80301 KY-298 OLD HARTFORD RD - WIDEN TO IMPROVE PL
TRAFFIC FLOW AND SAFETY. PROJECT DN
BEGINS AT HARRIET LN (CR 1120H) AND RW STP1 2,190,000
ENDS AT BURLEW BLVD (KY 1432). UT STP1 2,750,000
(2024CCN)
CN STP1 11,760,000
Project Cost: 0 2,190,000 2,750,000 11,760,000
Daviess 80302 KY-2699 RECONSTRUCT GOETZ DR FROM PL
SOUTHTOWN BLVD (KY 2121) TO DN
FREDERICA ST (US 431). INSTALL TURN RW
LANES AS NEEDED. (2024CCN) UT SPP 580,000
CN SPP 3,250,000
Project Cost: 580,000 3,250,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 69
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Daviess 80305 KY-2127 WIDEN KY 2127 FROM KELLER ROAD (CR PL
1301) TO KY 2121, INCLUDING 10' DN SPP 1,130,000
MULTIUSE PATH. (2024CCN) RW SPP 280,000
UT SPP 870,000
CN SPP 7,020,000
Project Cost: 1,130,000 280,000 870,000 7,020,000
Daviess 80312 I-165 CONDUCT A FEASIBILITY STUDY TO PL
UTILIZE EXISTING ROADWAYS TO DN STP1 2,000,000
CONSIDER AN ADDITIONAL RW STP1 4,000,000
INTERCHANGE ON I-165 SOUTH OF UT STP1 2,500,000
OWENSBORO. (2024CCN)
CN STP1 32,000,000
Project Cost: 2,000,000 4,000,000 2,500,000 32,000,000
Daviess 80404 KY-2155 Improve KY 2155 from East Byers to PL
Burlew Blvd. DN SPP 300,000
RW
UT
CN SPP 1,800,000
Project Cost: 300,000 1,800,000 0 0
Daviess 80414 I-165 Construct new exchange on I-165 PL
between MP 59.5 and 68.5. DN
RW STPF 4,000,000
UT STPF 2,500,000
CN STPF 32,000,000
Project Cost: 4,000,000 2,500,000 0 32,000,000
Daviess 80415 AU-9005 Upgrade Audubon Parkway to interstate PL
standards for conversion to I-169. DN
RW
UT
CN NH 15,000,000
Project Cost: 15,000,000 0 0 0
70 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Daviess 80416 KY-298 Improve roadway conditions and PL
horizontal alignment on KY-298 from MP 0 DN SPP 500,000
to 5.26 RW SPP 6,575,000
UT SPP 1,500,000
CN SPP 2,100,000
Project Cost: 500,000 6,575,000 1,500,000 2,100,000
Total for Daviess county PL
DN 5,810,000 2,229,139 200,000
RW 7,900,000 14,725,000
UT 13,210,000 6,870,000 9,860,000
CN 26,600,000 44,958,696 11,340,000 91,500,000
Total Amounts: 53,520,000 68,782,835 21,200,000 91,700,000
Edmonson 80107 KY-259 IMPROVE SAFETY AND MOBILITY ON KY PL
259 FROM NORTH OF KYROCK ROAD TO DN
THE GRAYSON COUNTY LINE. (2020CCN) RW SPP 370,000
UT SPP 340,000
CN SPP 2,190,000
Project Cost: 710,000 2,190,000 0 0
Edmonson 80317 KY-259 RECONSTRUCTION AND REALIGNMENT PL
OF KY 259 FROM MP 12.096 TO 15.633/ DN
(2024CCN) RW SPP 5,390,000
UT SPP 2,410,000
CN SPP 26,772,000
Project Cost: 0 7,800,000 26,772,000 0
Edmonson 80323 KY-2326 RECONSTRUCT KY 2326 (OTTER GAP PL
ROAD) FROM US 31W IN WARREN CO. DN SPP 1,300,000
TO NOAH BLEDSOE ROAD IN EDMONSON RW SPP 1,500,000
CO. (2024CCN) UT SPP 2,000,000
CN SPP 6,000,000
Project Cost: 1,300,000 1,500,000 2,000,000 6,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 71
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Edmonson 80350 CR-1137 Reconstruction/Widening from KY 2326 to PL
KY 101 (MP 0.0 - 2.455). (2024CCN) DN SPP 1,670,000
RW SPP 1,250,000
UT SPP 3,000,000
CN SPP 6,000,000
Project Cost: 1,670,000 1,250,000 3,000,000 6,000,000
Edmonson 80351 CR-1139 Reconstruction/Widening from KY 743 to PL
Noah Bledsoe Road (MP 0.0 - 1.254). DN SPP 890,000
(2024CCN) RW SPP 650,000
UT SPP 1,500,000
CN SPP 350,000
Project Cost: 890,000 650,000 1,500,000 350,000
Total for Edmonson county PL
DN 3,860,000
RW 370,000 8,790,000
UT 340,000 2,410,000 6,500,000
CN 2,190,000 26,772,000 12,350,000
Total Amounts: 4,570,000 13,390,000 33,272,000 12,350,000
Elliott 192.0100 KY-32 IMPROVE KY-32 FROM WEST OF PL
STEGALL COLD SPRING ROAD TO KY-7 DN
NEAR NEWFOUNDLAND. (PRIORITY RW
SECTION I)(06CCR) (08CCR) (10CCR) UT
(12CCR)(14CCR)(16CCR)(18CCR)
CN STP2 20,000,000 20,000,000 20,000,000 13,600,000
Project Cost: 20,000,000 20,000,000 20,000,000 13,600,000
Elliott 192.0300 KY-32 RECONSTRUCT KY-32 FROM 0.408 MILES PL
WEST OF STEGALL COLD SPRING ROAD DN STP2 4,030,000
TO KY-7 NEAR NEWFOUNDLAND. RW
(PRIORITY SECTION 2). (10CCR)(16CCN) UT STP2 7,010,000
(18CCN) (2024CCN)
CN STP2 15,000,000 23,440,000
Project Cost: 4,030,000 7,010,000 15,000,000 23,440,000
72 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Elliott 228.4000 KY-7 Reconstruct KY 7 from Sandy Hook to the PL
Morgan County Line. (2024CCR) DN
RW SPP 8,800,000
UT SPP 6,480,000
CN STP2 80,640,000
Project Cost: 15,280,000 80,640,000 0 0
Elliott 8802 KY-32 KY-32 FROM 9.2 MILE MARKER TO 10.2 PL
MILE MARKER WIDENING. (14CCN) DN
(16CCR)(18CCN)(2020CCR) (2022CCR) RW
UT
CN STP2 10,000,000
Project Cost: 10,000,000 0 0 0
Elliott 10098 KY-755 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY 755 OVER SOUTH RUIN CREEK DN BRZ 112,375
(032B00030N) RW
UT
CN BRZ 749,168
Project Cost: 0 861,543 0 0
Total for Elliott county PL
DN 4,030,000 112,375
RW 8,800,000
UT 6,480,000 7,010,000
CN 30,000,000 101,389,168 35,000,000 37,040,000
Total Amounts: 49,310,000 108,511,543 35,000,000 37,040,000
Estill 205 KY-82 IMPROVE LEVEL OF SERVICE, SAFETY, PL
AND CONNECTIVITY ON KY-82 FROM DN
KY-89 IN ESTILL CO. TO NEW RW SPP 6,300,000
CONSTRUCTION LOCATED NORTH OF UT SPP 4,010,000
HUDSON MILL ROAD IN ESTILL COUNTY.
CN SPP 37,200,000
Project Cost: 6,300,000 4,010,000 37,200,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 73
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Estill 206 KY-2459 IMPROVE SAFETY ON KY-2459 PL
(CARHARTT AVE.) FROM KY-89 TO THE DN
RAILROAD BRIDGE. (2020CCR) RW SPP 390,000
UT SPP 620,000
CN
Project Cost: 390,000 620,000 0 0
Estill 80407 KY-52 Replace bridge on Millers Creek PL
DN SPP 600,000
RW SPP 300,000
UT SPP 300,000
CN SPP 4,000,000
Project Cost: 600,000 600,000 4,000,000 0
Estill 80408 KY-82 Improve drainage and pedestrian facilities PL
from Rice Street intersection to the bridge DN SPP 500,000
over the Kentucky River RW SPP 400,000
UT SPP 500,000
CN SPP 4,000,000
Project Cost: 500,000 900,000 4,000,000 0
Estill 80409 KY-89 IMPROVE GEOMETRICS AND MOBILITY PL
ON KY 89 FROM 1500 FEET NORTH OF DN SPP 2,000,000
LANDFILL ROAD (ACROSS FROM ESTILL RW SPP 3,000,000
COUNTY HIGH SCHOOL) TO THE KY 82 UT SPP 1,500,000
INTERSECTION
CN SPP 20,000,000
Project Cost: 2,000,000 3,000,000 1,500,000 20,000,000
Total for Estill county PL
DN 3,100,000
RW 6,690,000 3,700,000
UT 5,430,000 1,500,000
CN 45,200,000 20,000,000
Total Amounts: 9,790,000 9,130,000 46,700,000 20,000,000
74 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fayette 122.2000 US-25 Lexington-Georgetown; PL
Reconstruct/Widen US 25 from Spurr DN
Road to Kearney Road. (Section 1) RW
(2024CCR) UT
CN STPF 17,380,000
Project Cost: 17,380,000 0 0 0
Fayette 227.1400 CO-0 DEDICATED FEDERAL-AID STP FUNDS PL
EARMARKED FOR LEXINGTON DN
URBANIZED AREA AND SUBJECT TO MPO RW
CONTROL FOR FY 2026 THROUGH FY UT
2032. (FUNDING SUBJECT TO FISCAL
CN SLX 7,800,000 7,800,000 7,800,000 7,800,000
Project Cost: 7,800,000 7,800,000 7,800,000 7,800,000
Fayette 357.1700 KY-169, OPERATION OF VALLEY VIEW FERRY AT PL
PF-9999 KY RIVER FOR FY 2027 THROUGH FY DN
2032. (12CCR)(18CCR) (2020CCR) RW
(2024CCR) UT
CN SPP 540,000 540,000 540,000 540,000
Project Cost: 540,000 540,000 540,000 540,000
Fayette 412 US-27 REPLACE RJ CORMAN RAILROAD BRIDGE PL
OVERPASS (MP 8.378) IMPROVE DN
DRAINAGE AND TYPICAL SECTION ON US RW
27 (NORTH BROADWAY) (12CCR) UT
(14CCR)(16CCR)(18CCN)(2020CCR)
CN NH 13,130,000
Project Cost: 13,130,000 0 0 0
Fayette 430 US-27 ACCESS MANAGEMENT ON PL
NICHOLASVILLE ROAD BETWEEN DN
NICHOLASVILLE AND MAN-O-WAR RW SPP 11,250,000
BLVD. (14CCR) (2024CCN) UT SPP 7,180,000
CN SPP 30,380,000
Project Cost: 11,250,000 7,180,000 30,380,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 75
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fayette 430.2000 US-27 NICHOLASVILLE - MAN-O-WAR BLVD; PL
ACCESS MANAGEMENT ON US-27 DN
(NICHOLASVILLE RD) FROM JUST SOUTH RW SPP 4,400,000
OF KOHL'S DRIVE TO MAN-O-WAR BLVD. UT SPP 1,460,000
CN SPP 50,000,000
Project Cost: 4,400,000 1,460,000 50,000,000 0
Fayette 438.1000 KY-4 Reduce congestion on KY 4 from Trade PL
Center to Railroad Bridge North of Palumbo DN
Drive RW
UT NH 6,000,000
CN NH 41,530,000
Project Cost: 6,000,000 41,530,000 0 0
Fayette 438.2000 KY-4 Reduce congestion on KY 4 from Railroad PL
Bridge North of Palumbo Drive to Woodhill DN
Drive RW NH 2,140,000
UT NH 2,000,000
CN NH 32,100,000
Project Cost: 2,140,000 0 2,000,000 32,100,000
Fayette 439 KY-4 NEW CIRCLE RD: IMPROVE SAFETY AND PL
REDUCE CONGESTION FROM US-68 DN
(HARRODSBURG RD) TO US-60 RW NH 1,170,000
(VERSAILLES RD). SEE SEGMENTS 2A & UT NH 1,760,000
2B IN AUGUST, 1998 ADVANCE
CN NH 45,020,000
Project Cost: 0 2,930,000 45,020,000 0
Fayette 8801 KY-4 SOUND BARRIERS ALONG OUTER LOOP PL
OF NEW CIRCLE ROAD BETWEEN TATES DN
CREEK ROAD AND NICHOLASVILLE RW
ROAD. (14CCN)(18CCN) (2022CCR) UT
(2024CCR)
CN SPP 6,350,000
Project Cost: 0 0 0 6,350,000
76 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fayette 8902 KY-1927 IMPROVE LIBERTY ROAD FROM PL
GRAFTONS MILL LANE TO NEW CIRCLE DN
ROAD AND IMPROVE INTERSECTION WITH RW
NEW CIRCLE ROAD. (16CCN)(18CCR) UT
(2020CCR) (2022CCR) (2024CCR)
CN STPF 10,000,000
Project Cost: 0 10,000,000 0 0
Fayette 8909.1000 I -75 REDUCE CONGESTION ON I-64/I-75 FROM PL
NORTHERN SPLIT TO NEWTOWN PIKE (MP DN
115.200 – 117.665). SECTION 1 RW
(2024CCR) UT
CN NH 7,500,000 66,500,000
Project Cost: 0 7,500,000 66,500,000 0
Fayette 10042 US-60 BRIDGE PROJECT IN FAYETTE COUNTY PL
ON (034B00022L) W NEW CIRCLE RD NC DN BRO 499,840
AT US 60 -VERSAILLES RD RW
UT
CN
Project Cost: 0 0 0 499,840
Fayette 10043 KY-4 BRIDGE PROJECT IN FAYETTE COUNTY PL
ON (034B00022R) NEW CIRCLE ROAD AT DN BRO 668,794
US 60 -VERSAILLES RD RW
UT
CN
Project Cost: 0 0 0 668,794
Fayette 10044 KY-3367 BRIDGE PROJECT IN FAYETTE COUNTY PL
ON (034B00139N) KY-3367 AT BR OF DN BRZ 375,394
NO. ELKHORN CREEK RW
UT
CN BRZ 2,502,630
Project Cost: 0 2,878,024 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 77
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fayette 10075 US-25 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US-25 OVER I-64 (034B00002N) DN FBP 1,173,574
RW
UT
CN FBP 7,823,824
Project Cost: 8,997,398 0 0 0
Fayette 10084 US-25 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US-25 OVER RAMP A OF I-75 & I-64 DN FBP 593,016
(034B00003N) RW
UT
CN FBP 3,953,441
Project Cost: 4,546,457 0 0 0
Fayette 10085 KY-57 ADDRESS DEFICIENCIES OF BRIDGE ON PL
BRYAN AVENUE OVER I-75 & I-64 DN BRX 1,099,519
(034B00048N) RW
UT
CN BRX 7,330,129
Project Cost: 0 8,429,648 0 0
Fayette 10086 I -75 ADDRESS DEFICIENCIES OF BRIDGE ON PL
NB & SB 75 NON-CARDINAL OVER DN FBP 1,444,640
RELOCATED KEARNEY ROAD RW
(034B00078L and 034B00078R) UT
CN BRX 4,815,500
FBP 4,815,500
Project Cost: 6,260,140 4,815,500 0 0
Fayette 80150 US-60 ADDRESS CONGESTION AND IMPROVE PL
SAFETY ON US 60 FROM MILEPOINT DN
12.41 TO MILEPOINT 16.37 BY WIDENING RW
AND MODERNIZING US 60 FROM THE END UT
OF THE FOUR-LANE SECTION NEAR
CN STPF 20,000,000 27,646,000
Project Cost: 0 20,000,000 27,646,000 0
78 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fayette 80205 US-27 ACCESS MANAGEMENT IMPROVEMENT PL
ON US 27 (NICHOLASVILLE RD) AT KY 4 DN NH 1,120,000
(NEW CIRCLE) INTERCHANGE. (2022CCN) RW NH 2,630,000
(2024CCR) UT NH 2,500,000
CN NH 7,500,000
Project Cost: 1,120,000 5,130,000 7,500,000 0
Fayette 80207 KY-1425, Provide a safe and efficient connection PL SPP 390,000
PF-9999, with access to I-64 from US 60 near the DN
US-60 Hamburg area. (2022CCN) RW
UT
CN
Project Cost: 390,000 0 0 0
Fayette 80303 KY-4 RELIEVE TRAFFIC CONGESTION ON NEW PL
CIRCLE RD BETWEEN Tates Creek AND DN NH 4,500,000
Nicholasville Rd (MP 17.741-19.283) BY RW NH 1,500,000
INCREASING CAPACITY (2024CCN) UT NH 1,000,000
CN NH 48,000,000
Project Cost: 4,500,000 0 2,500,000 48,000,000
Fayette 80304 PF-9999 Regional Corridor Feasibility Study to PL SPP 540,000
evaluate east-west connectivity between DN
US 127 and I-75. Study region includes the RW
following counties: Anderson, Fayette, UT
Franklin, Jessamine, Mercer, Scott &
CN
Project Cost: 540,000 0 0 0
Fayette 80305 CS-3016 Alumni Drive: Address congestion from PL
Edgewater DR to MOW Blvd. (2024CCN) DN SPP 1,250,000
RW SPP 3,500,000
UT SPP 2,750,000
CN SPP 6,000,000
Project Cost: 1,250,000 6,250,000 6,000,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 79
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fayette 80306 US-60 Modernize roadway, improve PL
multi-mobility, and include safety and DN
capacity improvements at intersections on RW
US 60 (Versailles Road) from Viley Road UT
to west end of Norfolk Southern railroad
CN NH 4,940,000
Project Cost: 0 4,940,000 0 0
Fayette 80307 KY-1425 Provide additional capacity and improve PL
multi-modal access on KY 1425 (Man o' DN SPP 780,000
War Blvd) from I-75 to US 60 (Winchester RW SPP 2,070,000
Road). (2024CCN) UT SPP 1,600,000
CN SPP 5,000,000
Project Cost: 780,000 2,070,000 1,600,000 5,000,000
Fayette 80308 KY-4 Improve safety and access management PL
measures on New Circle Rd. (KY 4): from DN SPP 1,560,000
Boardwalk to North Limestone Street. RW SPP 5,000,000
(2024CCN) UT SPP 1,200,000
CN SPP 15,000,000
Project Cost: 1,560,000 5,000,000 1,200,000 15,000,000
Fayette 80309 US-60 Operational & multimodal improvements on PL
US 60 (Winchester Rd) from Midland to DN NH 370,000
New Circle Rd. (2024CCN) RW NH 500,000
UT NH 500,000
CN NH 1,400,000
Project Cost: 370,000 500,000 500,000 1,400,000
Fayette 80311 US-60 Modernize roadway, improve PL
multi-mobility, and include safety and DN
capacity improvements at intersections on RW NH 710,000
US 60 (Versailles Road) from Viley Road UT NH 260,000
to west end of Norfolk Southern railroad
CN NH 1,560,000
Project Cost: 710,000 260,000 1,560,000 0
80 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fayette 80312 US-60 Modernize roadway, improve PL
multi-mobility, and include safety and DN
capacity improvements at intersections on RW NH 2,840,000
US 60 (Versailles Road) from Viley Road UT NH 1,060,000
to west end of Norfolk Southern railroad
CN NH 6,800,000
Project Cost: 3,900,000 6,800,000 0 0
Fayette 80323 US-60 Modernize roadway, improve PL
multi-mobility, and include safety and DN NH 180,000
capacity improvements at intersections on RW NH 770,000
US 60 (Versailles Road) from Viley Road UT NH 320,000
to west end of Norfolk Southern railroad
CN NH 1,690,000
Project Cost: 180,000 770,000 320,000 1,690,000
Fayette 80352 KY-4 Improve safety of the entrance ramp onto PL
WB New Circle from Tates Creek Road, DN SPP 250,000
extension of the acceleration lane (MP RW
17.8 - 18.2) (2024CCN) UT
CN SPP 900,000
Project Cost: 250,000 900,000 0 0
Fayette 80363 KY-4 Reduce congestion on New Circle Road PL
between Richmond Road and Alumni Drive DN SPP 4,000,000
(MP 14.851-16.123).(SAME AS 4-80360 IN RW SPP 1,500,000
SB 91 CHANGES) (2024CCN) UT SPP 5,000,000
CN SPP 35,000,000
Project Cost: 4,000,000 0 6,500,000 35,000,000
Fayette 80401 CS-4524 MAN O WAR BLVD - address congestion PL
and improve safety from Richmond Rd (US DN SPP 2,500,000
25) to Alumni Dr (CS 316) RW SPP 3,500,000
UT SPP 5,000,000
CN SPP 20,250,000
Project Cost: 2,500,000 0 8,500,000 20,250,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 81
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fayette 80402 KY-4 Improve Capacity on New Circle Road PL
between Alumni Drive and Tatescreek DN SPP 5,500,000
Road RW SPP 1,500,000
UT SPP 1,000,000
CN SPP 58,000,000
Project Cost: 5,500,000 0 2,500,000 58,000,000
Fayette 80403 KY-1974 To relieve traffic congestion at the New PL
Circle Road and Tates Creek Road DN SPP 2,250,000
interchange. RW SPP 475,000
UT SPP 850,000
CN SPP 17,500,000
Project Cost: 2,250,000 475,000 850,000 17,500,000
Fayette 80404 KY-1974 Improve capacity & multimodal access on PL
KY 1974 (Tates Creek Rd) from DN SPP 1,500,000
Armstrong Mill Rd to Malabu Dr. Revise to RW SPP 1,500,000
match the Lexington Area MPO 2040 UT SPP 2,000,000
Metropolitan Transportation Plan.
CN SPP 12,500,000
Project Cost: 1,500,000 1,500,000 14,500,000 0
Fayette 80405 KY-1974 Improve capacity & multimodal access on PL
KY 1974 (Tates Creek Rd) from Man o DN SPP 2,000,000
War Blvd to Armstrong Mill RW SPP 1,415,000
UT SPP 2,500,000
CN SPP 18,250,000
Project Cost: 2,000,000 1,415,000 2,500,000 18,250,000
Fayette 80411 CS-2690 Reconstruct Old Todds Rd from Codell Dr PL
to Liberty Rd. DN SPP 2,000,000
RW SPP 3,000,000
UT SPP 3,000,000
CN SPP 14,000,000
Project Cost: 2,000,000 3,000,000 3,000,000 14,000,000
82 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fayette 80413 KY-859 Improve capacity of KY 859 (Haley Road) PL
between US 60 and the interchange on DN SPP 3,000,000
I-64. RW SPP 500,000
UT SPP 1,500,000
CN SPP 21,450,000
Project Cost: 3,000,000 500,000 1,500,000 21,450,000
Fayette 80427 US-27 Reduce congestion and promote PL
multi-mobility on US 27 (Nicholasville Road) DN SPP 2,250,000
from Man o War Blvd to Reynolds Road. RW SPP 8,000,000
(MP 0.945 - 2.323) UT SPP 5,950,000
CN SPP 22,750,000
Project Cost: 0 2,250,000 13,950,000 22,750,000
Total for Fayette county PL 930,000
DN 35,971,230 3,724,913 1,168,634
RW 21,340,000 22,530,000 16,000,000
UT 7,060,000 15,910,000 33,420,000
CN 55,442,765 114,658,259 255,446,000 325,080,000
Total Amounts: 120,743,995 156,823,172 304,866,000 326,248,634
Fleming 8815 KY-165 UPGRADE, WIDEN, AND PROVIDE SPOT PL
IMPROVEMENTS ON KY-165 TO IMPROVE DN SPP 2,000,000
SAFETY FROM KY-32 TO US-68. (14CCN) RW SPP 3,850,000
(2024CCN) UT SPP 4,320,000
CN SPP 40,600,000
Project Cost: 2,000,000 3,850,000 4,320,000 40,600,000
Fleming 8901 KY-11 CONSTRUCT LEFT TURN LANES ON KY PL
11 AT ROSS DRIVE, TAYLOR MILL AND DN SPP 810,000
THE INDUSTRIAL PARK ROAD. (16CCN) RW SPP 1,440,000
(2024CCN) UT SPP 1,510,000
CN SPP 2,400,000
Project Cost: 810,000 1,440,000 1,510,000 2,400,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 83
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fleming 8903 KY-32 SAFETY IMPROVEMENTS AND PL
PAVEMENT REHAB EAST OF DN
FLEMINGSBURG BYPASS TO KY 156. RW
(2020CCN) (2022CCR) (2024CCR) UT
CN SPP 16,200,000
Project Cost: 16,200,000 0 0 0
Fleming 8915 KY-801 WIDEN KY 801 FROM NEAR MMRC PL
REGIONAL PARK TO KY 158 IN FLEMING DN
CO. (16CCN)(18CCN) (2020CCR) RW
(2022CCR) (2024CCR) UT
CN STP2 13,000,000
Project Cost: 13,000,000 0 0 0
Fleming 22327 KY-32 ADDRESS CONDITION OF KY-32 FROM PL
MILEPOINT 13 TO MILEPOINT 17.45 DN STP5 320,000
RW
UT
CN STP5 3,680,000
Project Cost: 4,000,000 0 0 0
Fleming 80051 KY-32 IMPROVE SAFETY AND SIGHT DISTANCE PL
ON KY-32 BEGINNING AT 0.4 MILES WEST DN
OF FLEMING/ROWAN CO LINE AND RW SPP 1,650,000
ENDING 0.3 MILES EAST OF THE LINE. UT SPP 1,950,000
(18CCN) (2020CCR) (2022CCR)
CN SPP 7,560,000
Project Cost: 1,650,000 1,950,000 7,560,000 0
Fleming 80103 KY-57 RECONSTRUCT KY 57 TO PROVIDE PL
BETTER HORIZONTAL AND VERTICAL DN
ALIGNMENT, WIDER SHOULDERS, AND RW SPP 9,900,000
EXTEND CLEAR ZONES (2020CCN) UT SPP 8,400,000
(2022CCR) (2024CCR)
CN SPP 48,000,000
Project Cost: 9,900,000 8,400,000 48,000,000 0
84 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Fleming county PL
DN 3,130,000
RW 11,550,000 5,290,000
UT 10,350,000 5,830,000
CN 32,880,000 55,560,000 43,000,000
Total Amounts: 47,560,000 15,640,000 61,390,000 43,000,000
Floyd 5019 KY-80 ADDRESS ROCKFALL ISSUES ON KY 80 PL
AT MP 8 TO MP 10 IN FLOYD COUNTY. DN
(2024CCN) RW
UT
CN SPP 14,200,000
Project Cost: 14,200,000 0 0 0
Floyd 10092 KY-1210 BRIDGE PROJECT IN FLOYD COUNTY ON PL
(036B00049N) KY-1210 AT LEFT FK DN FBP2 276,656
MIDDLE CREEK RW
UT
CN FBP2 1,844,370
Project Cost: 0 0 2,121,026 0
Floyd 10093 KY-1091 BRIDGE PROJECT IN FLOYD COUNTY ON PL
(036B00060N) KY-1091 AT LEFT FK DN BRX 313,566
BEAVER CREEK RW
UT
CN BRX 2,090,441
Project Cost: 0 2,404,007 0 0
Floyd 10094 KY-194 BRIDGE PROJECT IN FLOYD COUNTY ON PL
(036B00087N) KY-194 AT COW CREEK DN BRX 100,354
RW
UT
CN BRX 669,024
Project Cost: 0 0 0 769,378
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 85
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Floyd 10096 KY-3 BRIDGE PROJECT IN FLOYD COUNTY ON PL
(036B00135N) KY-3 AT CSX RR & DN FBP 1,331,866
LEVISA FORK RW
UT
CN FBP 8,879,104
Project Cost: 0 0 10,210,970 0
Floyd 10098 CR-1655 BRIDGE PROJECT IN FLOYD COUNTY ON PL
(036C00074N) MARTHA'S VINEYARD AT DN
BULL CREEK RW
UT
CN FBP2 1,150,000
Project Cost: 0 0 1,150,000 0
Floyd 10161 KY-3385 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-3385 OVER Buffalo Creek DN BRZ 103,141
(036B00122N) RW
UT
CN BRZ 687,608
Project Cost: 0 0 0 790,749
Floyd 80300 KY-680 Planning Study to evaluate potential PL SPP 620,000
improvements for KY 680 from MP 13.90 DN
to the intersection of US 23, as well as the RW
intersection of KY 680 and US 23. UT
(2024CCN)
CN
Project Cost: 620,000 0 0 0
Floyd 80353 PF-9999 Construct a new bridge and approaches PL
off of KY 1428 near MP 14.1. Provide a DN
new access route from KY 1428 across RW
Levisa Fork of the Big Sandy River near UT
Ball Alley Curve in Prestonsburg
CN SPP 5,500,000
Project Cost: 5,500,000 0 0 0
86 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Floyd county PL 620,000
DN 313,566 1,608,522 203,495
RW
UT
CN 19,700,000 2,090,441 11,873,474 1,356,632
Total Amounts: 20,320,000 2,404,007 13,481,996 1,560,127
Franklin 551 I -64 IMPROVE SAFETY, TRUCK MOBILITY, PL
AND REDUCE CONGESTION ALONG I-64 DN NH 1,500,000
FROM DIRECTLY EAST OF US-127 TO RW NH 750,000
US-60 SOUTH OF FRANKFORT. UT NH 300,000
(2024CCR)
CN NH 4,000,000 27,500,000 48,500,000
Project Cost: 2,250,000 4,300,000 27,500,000 48,500,000
Franklin 2035.4000 I -64 WIDEN I-64 TO 6 LANES FROM KY-395 TO PL
KY-151. DN
RW NH 280,000
UT NH 270,000
CN NH 48,400,000
Project Cost: 550,000 48,400,000 0 0
Franklin 2035.7000 I -64 WIDEN I-64 TO 6 LANES FROM KY-151 TO PL
WEST OF THE KY-420 BRIDGE. DN
(2004BOPC)(DESIGN FUNDED UNDER RW NH 150,000
5-2035.40)(16CCN)(SEE ITEM NO. UT NH 150,000
5-2035.80 FOR BRIDGES) (2024CCN)
CN NH 65,000,000
Project Cost: 300,000 65,000,000 0 0
Franklin 10040 US-60 BRIDGE PROJECT IN FRANKLIN COUNTY PL
ON (037B00008N) US 60 AT RJ CORMAN DN BRO 2,465,331
RAILROAD RW
UT
CN
Project Cost: 0 0 0 2,465,331
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 87
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Franklin 10045 KY-676 BRIDGE PROJECT IN FRANKLIN COUNTY PL
ON (037B00074N) KY 676 (E-W CONN) DN
AT KENTUCKY RIVER & KY 1263 RW
UT
CN BRO 18,000,000
FBP 18,000,000 21,660,000
Project Cost: 18,000,000 18,000,000 21,660,000 0
Franklin 10139 US-60 ADDRESS DEFICIENCIES OF "SINGING" PL
BRIDGE ON US 60X OVER KENTUCKY DN
RIVER (037B00065N) RW
UT
CN BRZ 17,000,000
STP1 12,000,000
Project Cost: 29,000,000 0 0 0
Franklin 22030 I -64 ADDRESS CONDITION OF I-064 FROM PL
MILEPOINT 46.303 TO MILEPOINT 53.118 DN NHPM 1,330,000
RW
UT
CN NHPM 13,270,000
Project Cost: 0 14,600,000 0 0
Franklin 80105 US-60 ADD A TURN LANE AT THE PL
INTERSECTION OF KY 676 AND US 60 DN SPP 190,000
(2020CCN) (2024CCR) RW SPP 180,000
UT SPP 120,000
CN SPP 1,860,000
Project Cost: 190,000 180,000 120,000 1,860,000
Franklin 80201 US-127 Improve safety and reduce congestion on PL
US 127 in Frankfort from I-64 to US 60 DN NH 2,080,000
(2022CCN) (2024CCR) RW SPP 5,780,000
UT SPP 3,400,000
CN SPP 13,100,000
Project Cost: 11,260,000 0 13,100,000 0
88 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Franklin 80301 US-60 IMPROVE SAFETY AND TRAFFIC FLOW PL
ON US 60 (VERSAILLES ROAD) FROM US DN
460 TO I-64 IN FRANKFORT. (2024CCN) RW NH 3,720,000
UT NH 660,000
CN NH 11,580,000
Project Cost: 0 4,380,000 11,580,000 0
Franklin 80400 I-64 Improve safety and level of service on PL
I-64 from US 60 in Frankfort to the DN NH 1,400,000
Woodford County line. RW NH 1,100,000
UT NH 1,000,000
CN NH 13,700,000
Project Cost: 1,400,000 2,100,000 13,700,000 0
Franklin 80401 I-64 Modify/reconstruct the I-64/US 60 PL
(Versailles Road) interchange to address DN NH 600,000
operations and level of service RW NH 100,000
UT NH 900,000
CN NH 6,000,000
Project Cost: 600,000 100,000 900,000 6,000,000
Franklin 80431 KY-1665 Improve safety and level of service on PL SPP 300,000
Evergreen Road (KY 1665) from US 127 DN SPP 820,000
to US 60 in Franklin County. (MP 0.127 - RW SPP 2,200,000
3.892) UT SPP 1,200,000
CN SPP 8,200,000
Project Cost: 0 300,000 3,020,000 9,400,000
Total for Franklin county PL 300,000
DN 5,770,000 1,330,000 820,000 2,465,331
RW 6,960,000 5,100,000 2,200,000
UT 3,820,000 1,960,000 1,020,000 1,200,000
CN 47,000,000 148,670,000 87,540,000 64,560,000
Total Amounts: 63,550,000 157,360,000 91,580,000 68,225,331
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 89
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fulton 25 JC-9003 IMPROVE THE PURCHASE PARKWAY AT PL
THE KENTUCKY/TENNESSEE LINE TO DN
SOUTHWEST OF THE US-51 RW
INTERCHANGE.(I-69 CORRIDOR UT
IMPROVEMENT) (2022CCR)
CN NH 6,000,000
Project Cost: 6,000,000 0 0 0
Fulton 320.1700 KY-1354 OPERATION OF HICKMAN FERRY AT PL
MISSISSIPPI RIVER FOR FY 2027 DN
THROUGH FY 2032. (12CCR) (2020CCR) RW
(2024CCR) UT
CN SPP 144,000 144,000 144,000 144,000
Project Cost: 144,000 144,000 144,000 144,000
Fulton 80304 KY-307 ADDRESS ECONOMIC DEVELOPMENT, PL
AND TRUCK ACCESS ISSUES TO THE DN SPP 780,000
FULTON INDUSTRIAL PARK FROM THE RW SPP 500,000
PURCHASE PARKWAY TO HOLLAND UT SPP 400,000
LANE IN FULTON. (2024CCN)
CN SPP 1,500,000
Project Cost: 780,000 500,000 400,000 1,500,000
Fulton 80310 KY-125 CORRECT GEOMETRIC DEFICIENCIES AND PL
ADDRESS SAFETY AND FREIGHT DN
ACCESS ISSUES FROM KY 166 TO KY RW SPP 1,650,000
1099 IN HICKMAN. (2024CCN) UT SPP 2,160,000
CN SPP 11,600,000
Project Cost: 3,810,000 11,600,000 0 0
Fulton 80319 KY-94 CORRECT GEOMETRIC DEFICIENCIES AND PL
ADDRESS SAFETY ISSUES AND FREIGHT DN
ACCESS AT INTERSECTION WITH KY 94 RW SPP 150,000
SOUTHWEST. (2024CCN) UT SPP 250,000
CN SPP 500,000
Project Cost: 400,000 500,000 0 0
90 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Fulton 80324 KY-1099 CORRECT SUBSTANDARD INTERSECTION PL
GEOMETRICS AND ADDRESS ACCESS DN
ISSUES AT KY 309 & KY 1099 IN RW SPP 400,000
HICKMAN TO IMPROVE THE LESS THAN UT SPP 1,000,000
ADEQUATE TRUCK TURNING RADIUS.
CN SPP 2,000,000
Project Cost: 1,400,000 2,000,000 0 0
Fulton 80326 KY-125 CORRECT GEOMETRIC DEFICIENCIES AND PL
ADDRESS SAFETY ISSUES AND FREIGHT DN SPP 1,000,000
ACCESS FROM TENNESSEE STATE LINE RW SPP 750,000
TO KY 166. (2024CCN) UT SPP 500,000
CN SPP 4,000,000
Project Cost: 1,000,000 1,250,000 4,000,000 0
Total for Fulton county PL
DN 1,780,000
RW 2,200,000 1,250,000
UT 3,410,000 500,000 400,000
CN 6,144,000 14,244,000 4,144,000 1,644,000
Total Amounts: 13,534,000 15,994,000 4,544,000 1,644,000
Gallatin 8910 I -71 IMPROVE GEOMETRICS ON I-71 FROM PL
US-127 TO MP 64. (16CCN)(18CCR) DN
(2024CCR) RW
UT
CN NH 22,650,000 20,000,000
Project Cost: 22,650,000 20,000,000 0 0
Gallatin 80303 I -71 RECONSTRUCT I-71 WITH ADDITIONAL PL
LANES FROM LITTLE SUGAR ROAD DN SPP 3,780,000
OVERPASS TO THE BOONE COUNTY RW SPP 300,000
LINE. (2024CCN) UT SPP 290,000
CN SPP 78,000,000
Project Cost: 3,780,000 590,000 78,000,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 91
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Gallatin 80402 I-71 Reconstruct I-71 from the end of the PL
6-lane typical section to Little Sugar Road DN
Overpass RW NH 500,000
UT NH 500,000
CN NH 55,000,000
Project Cost: 1,000,000 55,000,000 0 0
Gallatin 80403 I-71 Widen I 71 to 6 lanes from KY 35 to US PL
127. DN NH 4,000,000
RW NH 250,000
UT NH 500,000
CN NH 60,000,000
Project Cost: 4,000,000 250,000 500,000 60,000,000
Gallatin 80404 KY-35 Improve safety and mobility along KY 35 PL
from US 127 to the Gallatin County line. DN SPP 3,000,000
RW SPP 2,500,000
UT SPP 1,500,000
CN SPP 25,000,000
Project Cost: 3,000,000 2,500,000 1,500,000 25,000,000
Total for Gallatin county PL
DN 10,780,000
RW 500,000 3,050,000
UT 500,000 290,000 2,000,000
CN 22,650,000 75,000,000 78,000,000 85,000,000
Total Amounts: 34,430,000 78,340,000 80,000,000 85,000,000
Garrard 196.3000 US-27 IMPROVE US-27 FROM WEST PL
LANCASTER BYPASS TO KY-34. DN
(2006BOPC) (16CCN)(18CCR) (2020CCR) RW
(2024CCR) UT
CN NH 19,000,000 19,000,000
Project Cost: 19,000,000 19,000,000 0 0
92 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Garrard 196.5000 CO-0 West Lancaster Bypass from North of PL
Lancaster to Bell Street at Stanford, KY. DN
(2024CCR) RW
UT
CN NH 30,000,000 38,000,000
Project Cost: 30,000,000 38,000,000 0 0
Garrard 10077 KY-563 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-563 OVER SCOTT FORK DN BRZ 142,134
(040B00019N) RW
UT
CN BRZ 947,560
Project Cost: 0 0 1,089,694 0
Garrard 80409 KY-52 Improve safety on KY 52 from Boone PL
Creek Road to KY 1150 in Garrard County DN
RW SPP 5,750,000
UT SPP 1,000,000
CN SPP 9,500,000
Project Cost: 16,250,000 0 0 0
Garrard 80410 KY-52 Improve safety on KY 52 from KY 590 in PL
Boyle County to Martin Lane in Garrard DN
County. RW SPP 2,280,000
UT SPP 4,900,000
CN SPP 19,500,000
Project Cost: 7,180,000 19,500,000 0 0
Total for Garrard county PL
DN 142,134
RW 8,030,000
UT 5,900,000
CN 58,500,000 76,500,000 947,560
Total Amounts: 72,430,000 76,500,000 1,089,694 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 93
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Grant 20062 I -75 ADDRESS CONDITION OF I-075 FROM PL
MILEPOINT 162.6 TO MILEPOINT 164.4 DN NHPM 530,000
RW
UT
CN NHPM 5,270,000
Project Cost: 0 5,800,000 0 0
Grant 80216.1000US-25 Update US 25 from KY 2842 to south PL
intersection of KY 491. (2024BOP) DN
RW
UT SPP 1,560,000
CN SPP 5,000,000 5,000,000
Project Cost: 1,560,000 5,000,000 5,000,000 0
Grant 80216.2000US-25 Update US 25 from KY 1994 to KY 2842. PL
(2024BOP) DN
RW SPP 4,200,000
UT SPP 3,120,000
CN SPP 22,400,000
Project Cost: 4,200,000 3,120,000 22,400,000 0
Grant 80315 US-25 NEW CONSTRUCTION ON THE EAST SIDE PL
OF THE RR FROM SHERMAN-NEWTOWN DN STP2 6,380,000
ROAD TO LEMON-NORTHCUTT ROAD. RW STP2 4,550,000
(2024CCN) UT STP2 1,860,000
CN STP2 57,120,000
Project Cost: 6,380,000 4,550,000 1,860,000 57,120,000
Grant 80401 FF-9999 Improve safety, reliability, and mobility by PL
providing grade separated access over DN SPP 5,000,000
Norfolk Southern Railroad to access US RW SPP 6,000,000
25 in the vicinity of Needham Lane to Hyde UT SPP 5,000,000
Road.
CN SPP 45,000,000
Project Cost: 5,000,000 6,000,000 5,000,000 45,000,000
94 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Grant county PL
DN 11,380,000 530,000
RW 4,200,000 10,550,000
UT 1,560,000 3,120,000 6,860,000
CN 10,270,000 27,400,000 102,120,000
Total Amounts: 17,140,000 24,470,000 34,260,000 102,120,000
Graves 10126 KY-464 BRIDGE PROJECT IN GRAVES COUNTY PL
ON (042B00062N) KY-464 AT MAYFIELD DN FBP 706,193
CREEK RW
UT
CN FBP 4,707,956
Project Cost: 0 0 0 5,414,149
Graves 10129 KY-408 BRIDGE PROJECT IN GRAVES COUNTY PL
ON (042B00127N) KY-408 AT GOOSE DN BRX 312,751
CREEK RW
UT
CN BRX 2,085,008
Project Cost: 0 0 2,397,759 0
Graves 10132 KY-339 BRIDGE PROJECT IN GRAVES COUNTY PL
ON (042B00131N) KY-339 AT WEST DN BRX 1,291,059
MAYFIELD CREEK RW
UT
CN BRX 8,607,060
Project Cost: 0 0 0 9,898,119
Graves 10142 KY-1820 BRIDGE PROJECT IN GRAVES COUNTY PL
ON (042B00271N) KY-1820 AT BRANCH DN BRZ 222,409
OF MAYFEILD CREEK RW
UT
CN BRZ 1,482,730
Project Cost: 0 0 0 1,705,139
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 95
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Graves 20042 US-45 ADDRESS CONDITION OF US-45 FROM PL
MILEPOINT 19.4 TO MILEPOINT 20.6 DN STP4 708,000
RW
UT
CN STP4 8,142,000
Project Cost: 0 0 8,850,000 0
Graves 80103 KY-303 WIDEN KY 303 FROM MP 16.034 (EAST PL
FARTHING ST) TO MP 16.807 (CHARLES DN
DR) (2020CCN) (2022CCR) (2024CCR) RW
UT
CN SPP 5,600,000
Project Cost: 0 5,600,000 0 0
Graves 80104 KY-131 WIDEN KY 131 FROM MP 0 (KY 58) TO MP PL
4.555 (KY 483) (2020CCN) (2022CCR) DN
(2024CCR) RW SPP 2,100,000
UT SPP 2,600,000
CN SPP 18,720,000
Project Cost: 2,100,000 2,600,000 18,720,000 0
Graves 80202 KY-121 Upgrade/Widen KY 121 bypass in PL
Mayfield to four lanes. (2022CCN) DN
(2024CCR) RW SPP 550,000
UT SPP 540,000
CN SPP 5,000,000 5,000,000
Project Cost: 1,090,000 5,000,000 5,000,000 0
Graves 80332 KY-131 CORRECT GEOMETRIC DEFICIENCIES AND PL
ADDRESS SAFETY AND TRUCK ACCESS DN SPP 1,000,000
ISSUES FROM KY 348 IN SYMSONIA TO RW SPP 1,500,000
MCCRACKEN COUNTY LINE. (2024CCN) UT SPP 1,000,000
CN SPP 5,000,000
Project Cost: 1,000,000 2,500,000 5,000,000 0
96 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Graves 80333 KY-58 ADDRESS ACCESS, CONGESTION, AND PL
GEOMETRIC ALIGNMENT ISSUES FROM DN SPP 1,000,000
THE EASTERN CITY LIMITS OF MAYFIELD RW SPP 1,000,000
TO KY 131. (2024CCN) UT SPP 1,500,000
CN SPP 8,500,000
Project Cost: 1,000,000 1,000,000 1,500,000 8,500,000
Graves 80403 KY-58 Spot improvements and minor widening on PL
KY 58 from the KY 121 Bypass to KY DN SPP 300,000
131. RW SPP 400,000
UT SPP 400,000
CN SPP 1,500,000
Project Cost: 300,000 800,000 1,500,000 0
Total for Graves county PL
DN 2,300,000 1,020,751 2,219,661
RW 2,650,000 2,900,000
UT 540,000 4,000,000 1,500,000
CN 10,600,000 40,447,008 23,297,746
Total Amounts: 5,490,000 17,500,000 42,967,759 25,517,407
Grayson 22166 WK-9001 ADDRESS CONDITION OF Wendell H. Ford PL
Western KY Parkway FROM MILEPOINT DN NHPM 1,360,000
95.03 TO MILEPOINT 106.08 RW
UT
CN NHPM 13,640,000
Project Cost: 1,360,000 13,640,000 0 0
Grayson 80100 PF-9999 ADDRESS CONNECTIVITY, MOBILITY, PL
AND SAFETY CONCERNS ON THE WEST DN SPP 2,800,000
SIDE OF LEITCHFIELD FROM KY 54 TO RW SPP 7,500,000
THE NORTHERN INTERSECTION OF KY UT SPP 3,000,000
259 AND KY 3155 (2020CCN) (2022CCR)
CN SPP 22,000,000
Project Cost: 2,800,000 0 10,500,000 22,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 97
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Grayson 80101 KY-259 ADDRESS SAFETY, GEOMETRIC PL
DEFICIENCIES, AND MAINTENANCE DN SPP 1,670,000
ISSUES ALONG KY 259 FROM BEAR RW SPP 2,300,000
CREEK ROAD (MP 9.217) TO THE UT SPP 3,480,000
NORTHERN INTERSECTION OF
CN SPP 17,360,000
Project Cost: 7,450,000 17,360,000 0 0
Grayson 80302 US-62 IMPROVE SAFETY, GEOMETRIC PL
DEFICIENCIES AND DRAINAGE ALONG US DN NH 750,000
62 FROM THE PROPOSED LEITCHFIELD RW NH 2,000,000
WESTERN BYPASS TO THE SOUTHERN UT NH 2,000,000
INTERSECTION OF KY 259 IN
CN NH 5,500,000
Project Cost: 750,000 2,000,000 2,000,000 5,500,000
Grayson 80307 US-62 IMPROVE SAFETY, GEOMETRIC PL
DEFICIENCIES AND DRAINAGE ALONG US DN NH 1,680,000
62 FROM SCHOOLHOUSE ROAD TO THE RW NH 3,750,000
PROPOSED LEITCHFIELD WESTERN UT NH 3,000,000
BYPASS. (2024CCN)
CN NH 10,000,000
Project Cost: 1,680,000 0 6,750,000 10,000,000
Grayson 80311 KY-3155 IMPROVE INTERSECTIONS ALONG THE PL
LEITCHFIELD BYPASS AT KY 1214, US DN
62, AND KY 920. (2024CCN) RW SPP 250,000
UT SPP 260,000
CN SPP 3,240,000
Project Cost: 0 260,000 250,000 3,240,000
Total for Grayson county PL
DN 8,260,000
RW 2,300,000 2,000,000 11,500,000
UT 3,480,000 260,000 8,000,000
CN 31,000,000 40,740,000
Total Amounts: 14,040,000 33,260,000 19,500,000 40,740,000
98 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Green 397.1100 US-68 ADDRESS SAFETY, GEOMETRIC PL
DEFICIENCIES AND MAINTENANCE ISSUES DN STP2 1,120,000
ALONG US 68 FROM THE METCALFE RW STP2 3,130,000
COUNTY LINE (MP 0.000) TO 1600 FEET UT STP2 3,500,000
WEST OF SOUTH THURLOW ROAD (MP
CN STP2 12,000,000
Project Cost: 1,120,000 3,130,000 3,500,000 12,000,000
Green 398.1000 KY-3535 Construction of new connector on the PL
east side of Greensburg beginning at KY DN
3535 and extending to Taylor Cox Road RW
(Design under 4-398) UT
CN STPF 24,414,000
Project Cost: 24,414,000 0 0 0
Green 398.2000 KY-3535 Construction of new connector on the PL
east side of Greensburg beginning near DN
the US 61 and US 68 intersection south of RW
town and extending to Taylor Cox Road UT
(Design under 4-398)
CN STPF 15,431,000
Project Cost: 0 15,431,000 0 0
Green 8853 KY-88 SPOT IMPROVEMENTS & IMPROVE PL
EXISTING ALIGNMENT ON KY 88 FROM DN SPP 1,120,000
0.20 MILES WEST OF AKIN NARROWS OF RW SPP 2,500,000
PITMAN RD (MP 8.996) TO KY 61 (MP UT
11.232). (14CCN)(16CCR)(18CCN)
CN
Project Cost: 1,120,000 0 2,500,000 0
Green 10082 CR-1227 ADDRESS DEFICIENCIES OF BRIDGE ON PL
LILETOWN RD OVER GREASY CK DN BRZ 224,724
(044C00012N) RW
UT
CN BRZ 1,498,162
Project Cost: 1,722,886 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 99
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Green 80154.2000KY-210 ADDRESS SAFETY ON KY 210 FROM PL
MORNINGSTAR ROAD (LARUE MP14.23) DN
TO JUST EAST OF CORINTH CHURCH RW
(TAYLOR MP0.60) (2024CCN) UT
CN STPF 7,400,000 10,000,000
Project Cost: 0 7,400,000 10,000,000 0
Total for Green county PL
DN 2,464,724
RW 3,130,000 2,500,000
UT 3,500,000
CN 25,912,162 22,831,000 10,000,000 12,000,000
Total Amounts: 28,376,886 25,961,000 16,000,000 12,000,000
Greenup 132 KY-2 RECONSTRUCT KY-2 FROM MP 13.2 TO PL
US-23 (MP 17.2)(08CCN)(14CCR)(16CCR) DN STP2 750,000
(18CCN) (2024CCR) RW SPP 9,350,000
UT SPP 8,100,000
CN SPP 98,600,000
Project Cost: 750,000 9,350,000 8,100,000 98,600,000
Greenup 8509.1000 KY-207 Improve KY 207 from the intersection with PL
KY 67 (MP 11) to MP 15 (Design under DN
9-8509) RW
UT STPF 3,500,000
CN STPF 25,000,000
Project Cost: 3,500,000 25,000,000 0 0
Greenup 8509.2000 KY-207 Improve KY 207 from MP 15 to the KY 693 PL
intersection in Flatwoods (Design under DN
9-8509) RW SPP 9,000,000
UT SPP 4,000,000
CN SPP 13,000,000
Project Cost: 9,000,000 4,000,000 13,000,000 0
100 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Greenup 20037 US-23 ADDRESS CONDITION OF US-23 FROM PL
MILEPOINT 0 TO MILEPOINT 4.5 DN STP5 440,000
RW
UT
CN STP5 5,060,000
Project Cost: 0 0 5,500,000 0
Greenup 80352 KY-693 Improve congestion, access and mobility PL
at the KY 693/KY 1488 intersection by DN
constructing a traffic signal (MP 3.384 KY RW SPP 110,000
693) (2024CCN) UT SPP 210,000
CN SPP 420,000
Project Cost: 110,000 210,000 420,000 0
Greenup 80401 KY-693 Improve safety and decrease congestion PL
at the KY 693 (Diederick Blvd.) and KY DN SPP 250,000
1172 (Red Devil Ln.) intersection by RW SPP 250,000
improving signal visibility, adding UT SPP 500,000
advanced signal warning signs and
CN SPP 1,200,000
Project Cost: 250,000 750,000 1,200,000 0
Total for Greenup county PL
DN 1,000,000 440,000
RW 9,110,000 9,600,000
UT 3,500,000 4,710,000 8,100,000
CN 25,000,000 19,680,000 98,600,000
Total Amounts: 13,610,000 39,310,000 28,220,000 98,600,000
Hancock 80306 US-60 WIDEN US-60 FROM MILE 2.2 IN PL
LEWISPORT TO KY-1957. (2024CCN) DN
RW
UT
CN NH 9,000,000
Project Cost: 0 9,000,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 101
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hancock 80407 KY-69 Address safety and condition concerns of PL
KY-69 near Tick Ridge Rd. DN
RW SPP 175,000
UT SPP 400,000
CN NH 9,000,000
Project Cost: 0 175,000 400,000 9,000,000
Hancock 80419 KY-271 Address safety concerns on KY 271 from PL
KY 1847 to US 60 in Hancock County (MP DN SPP 560,000
3.161 - 4.581) RW SPP 650,000
UT SPP 750,000
CN SPP 2,300,000
Project Cost: 560,000 1,400,000 2,300,000 0
Total for Hancock county PL
DN 560,000
RW 825,000
UT 750,000 400,000
CN 9,000,000 2,300,000 9,000,000
Total Amounts: 560,000 10,575,000 2,700,000 9,000,000
Hardin 29 I -65 NEW INTERCHANGE AT I-65/KY 1136 PL
(GILEAD CHURCH ROAD) AT MP 84 IN DN NH 2,800,000
HARDIN COUNTY. (2022BOP) (2024CCN) RW SPP 9,380,000
UT SPP 4,340,000
CN
Project Cost: 2,800,000 0 9,380,000 4,340,000
Hardin 154.3000 US-31 ADDRESS CONGESTION, SAFETY, AND PL
MOBILITY ALONG US 31W FROM DN
VETERANS WAY IN ELIZABETHTOWN TO RW NH 8,400,000
THE NORTH WILSON ROAD OVERPASS IN UT NH 4,960,000
RADCLIFF. (2018BOP) (2022CCR)
CN NH 52,800,000
Project Cost: 13,360,000 0 0 52,800,000
102 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hardin 198 PF-9999 EXTEND RING ROAD FROM THE WESTERN PL
KENTUCKY PARKWAY TO I-65. DN
(REQUIRES RELOCATION OF I-65 RW STP2 3,000,000
SOUTHBOUND COMMERCIAL VEHICLE UT STP2 2,080,000
MONITORING STATION, PROJECT
CN STP2 19,000,000 21,440,000
Project Cost: 5,080,000 19,000,000 21,440,000 0
Hardin 202 PF-9999 CONSTRUCT A BYPASS OF GLENDALE. PL
(2022BOP) (2024CCN) DN
RW
UT STP2 1,500,000
CN STP2 8,320,000
Project Cost: 1,500,000 8,320,000 0 0
Hardin 286.1000 I -65 I-65 SOUTHBOUND PORT OF ENTRY FOR PL
A COMMERCIAL VEHICLE MONITORING DN
STATION. (2022CCR) RW
UT
CN NH 21,420,000
Project Cost: 21,420,000 0 0 0
Hardin 442 US-62 IMPROVE SAFETY, MOBILITY AND PL
GEOMETRICS ON US-62 FROM I-65 TO DN SPP 2,020,000
UPPER COLESBURG ROAD (CR-1038) RW SPP 4,380,000
(2024CCR) UT
CN
Project Cost: 2,020,000 0 4,380,000 0
Hardin 10053 KY-86 BRIDGE PROJECT IN HARDIN COUNTY ON PL
(047B00059N) KY-86 AT ROUGH RIVER DN BRX 431,168
RW
UT
CN BRX 2,874,454
Project Cost: 0 0 3,305,622 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 103
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hardin 20047 I -65 ADDRESS CONDITION OF I-065 FROM PL
MILEPOINT 90.53 TO MILEPOINT 97.54 DN NHPM 200,000
RW
UT
CN NHPM 2,000,000
Project Cost: 0 0 0 2,200,000
Hardin 20051 BG-9002 ADDRESS CONDITION OF Martha Layne PL
Collins Bluegrass Parkway FROM DN STP5 120,000
MILEPOINT 5.853 TO MILEPOINT 8.837 RW
UT
CN STP5 1,192,960
Project Cost: 120,000 1,192,960 0 0
Hardin 22064 I -65 ADDRESS CONDITION OF I-065 FROM PL
MILEPOINT 82.2 TO MILEPOINT 90.53 DN NHPM 200,000
RW
UT
CN NHPM 2,000,000
Project Cost: 0 0 0 2,200,000
Hardin 22065 I -65 ADDRESS CONDITION OF I-065 FROM PL
MILEPOINT 97.54 TO MILEPOINT 102.1 DN NHPM 1,000,000
RW
UT
CN NHPM 10,000,000
Project Cost: 0 11,000,000 0 0
Hardin 80200 US-62 Address safety, mobility, and access PL
management, along with potentially DN
reconfiguring the interchange to I 65. RW SPP 6,310,000
(2022CCN) (2024CCR) UT SPP 1,150,000
CN SPP 10,000,000 14,500,000
Project Cost: 6,310,000 1,150,000 10,000,000 14,500,000
104 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hardin 80250 PF-9999 EXTEND RING ROAD FROM US 31W TO PL
KY 61 (LINCOLN PARKWAY) (2022CCN) DN
(2024CCR) RW SPP 2,200,000
UT SPP 2,240,000
CN SPP 14,270,000
Project Cost: 2,200,000 2,240,000 14,270,000 0
Hardin 80301 KY-1600 ADDRESS GEOMETRIC DEFICIENCIES PL
ALONG KY 1600 FROM KY 361 TO THE DN SPP 730,000
ROUNDABOUT AT KY 220 IN RINEYVILLE. RW SPP 1,880,000
(2024CCN) UT SPP 1,600,000
CN SPP 6,000,000
Project Cost: 730,000 3,480,000 6,000,000 0
Hardin 80303 PF-9999 EXTEND COMMERCE DRIVE FROM PL
SPRINGFIELD ROAD TO US 31W AT KY DN
1136 ON THE SOUTH SIDE OF RW
ELIZABETHTOWN. (2024CCN) UT SPP 1,620,000
CN SPP 5,040,000
Project Cost: 0 1,620,000 5,040,000 0
Hardin 80310 US-62 IMPROVE THE INTERSECTION OF US 62 PL
AND THE US 31W BYPASS RAMP AT DN SPP 570,000
NICHOLAS STREET IN ELIZABETHTOWN. RW SPP 2,100,000
(2024CCN) UT SPP 2,080,000
CN SPP 1,890,000
Project Cost: 570,000 2,100,000 2,080,000 1,890,000
Hardin 80313 US-31 ADD SHOULDERS AND TURN LANES TO PL
US 31W BETWEEN KY 1136 AND KY 222 DN SPP 1,570,000
EAST OF GLENDALE. SEE GLENDALE RW SPP 3,750,000
AREA TRANSPORTATION STUDY. UT
(2024CCN)
CN
Project Cost: 1,570,000 3,750,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 105
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hardin 80314 US-31 ADDRESS GEOMETRIC DEFICIENCIES PL
ALONG US 31W FROM KY 222 TO KY 61 DN NH 3,780,000
(LINCOLN PARKWAY)/WESTERN RW NH 4,400,000
KENTUCKY PARKWAY INTERSECTION. UT NH 4,200,000
(2024CCN)
CN NH 35,000,000
Project Cost: 3,780,000 4,400,000 4,200,000 35,000,000
Hardin 80364 US-31 Address safety along US 31W from the PL
end of the center barrier wall on DN SPP 1,400,000
Muldraugh hill in Hardin County (MP 34.65) RW SPP 1,880,000
to KY 44 in Jefferson County (1.917). UT SPP 2,480,000
(2024CCN)
CN SPP 11,000,000
Project Cost: 1,400,000 1,880,000 2,480,000 11,000,000
Hardin 80400 US-31 Road rightsizing and intersection PL
improvements along US 31W (East Dixie DN SPP 1,565,000
Avenue) from the Western KY Parkway to RW SPP 285,000
KY 1136 (New Glendale Road) UT SPP 170,000
CN SPP 8,615,000
Project Cost: 1,565,000 285,000 170,000 8,615,000
Hardin 80401 US-62 Operational and intersection improvements PL
to US 62 in Elizabethtown between the DN SPP 1,100,000
western intersection at KY 3005 and the RW SPP 1,000,000
Nicholas Street Connector. UT SPP 1,000,000
CN SPP 9,000,000
Project Cost: 1,100,000 2,000,000 9,000,000 0
Hardin 80402 US-31 Intersection improvements at the PL
intersection of KY 1357 (St. John Road) DN SPP 800,000
and US 31WB RW SPP 150,000
UT SPP 150,000
CN SPP 5,000,000
Project Cost: 800,000 150,000 150,000 5,000,000
106 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hardin 80403 US-31 Operational and safety improvements at PL
the intersection of College Street Road DN SPP 380,000
and US 31WB RW
UT
CN SPP 2,500,000
Project Cost: 380,000 2,500,000 0 0
Hardin 80404 CS-1124 Operational and safety improvements, PL
including curve realignment, turn lanes, DN SPP 520,000
and pedestrian facilities, for all users on RW SPP 300,000
College Street Road UT SPP 150,000
CN SPP 3,000,000
Project Cost: 520,000 300,000 150,000 3,000,000
Hardin 80405 KY-144 SAFETY IMPROVEMENTS ALONG KY 144 PL
IN RADCLIFF FROM KY 1646 TO US 31W DN SPP 800,000
INCLUDING RECONSTRUCTING THE RW SPP 1,100,000
INTERSECTIONS AT WOODLAND DRIVE UT SPP 2,700,000
AND AT KY 1646.
CN SPP 6,000,000
Project Cost: 800,000 3,800,000 6,000,000 0
Hardin 80409 KY-3005 Operational and intersection improvements PL
along KY 3005 in Elizabethtown between DN SPP 2,750,000
the western intersection of US 62 and US RW SPP 5,000,000
31W. UT SPP 3,000,000
CN SPP 23,500,000
Project Cost: 2,750,000 8,000,000 23,500,000 0
Total for Hardin county PL
DN 20,905,000 1,000,000 431,168 400,000
RW 19,910,000 21,845,000 13,760,000
UT 8,540,000 13,310,000 9,230,000 4,340,000
CN 21,420,000 41,012,960 98,124,454 135,805,000
Total Amounts: 70,775,000 77,167,960 121,545,622 140,545,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 107
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Harlan 5012 US-421 Address Slide on US 421 in Harlan PL
County. DN
RW
UT
CN SPP 5,040,000
Project Cost: 5,040,000 0 0 0
Harlan 10194 US-119 BRIDGE PROJECT IN HARLAN COUNTY PL
ON (048B00107N) US-119 AT POOR FK DN FBP 550,000
CUMBERLAND RVR RW
UT
CN FBP 5,500,000
Project Cost: 0 0 6,050,000 0
Harlan 20040 US-119 ADDRESS CONDITION OF US-119 FROM PL
MILEPOINT 6 TO MILEPOINT 7.8 DN STP4 272,000
RW
UT
CN STP4 3,128,000
Project Cost: 272,000 3,128,000 0 0
Harlan 20041 US-119 ADDRESS CONDITION OF US-119 FROM PL
MILEPOINT 26 TO MILEPOINT 28.066 DN STP4 344,000
RW
UT
CN STP4 3,956,000
Project Cost: 0 0 0 4,300,000
Harlan 80257 KY-72 EXTEND KY 72 FROM ALVA/BLACK PL
STAR NEAR HARLAN /BELL COUNTY DN SPP 1,750,000
LINE TO LIGGETT WEST OF HARLAN RW SPP 2,000,000
CITY. APPROXIMATELY 5 MILES OF UT SPP 500,000
RECONSTRUCTION (2022CCN) (2024CCR)
CN SPP 30,000,000
Project Cost: 1,750,000 2,000,000 500,000 30,000,000
108 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Harlan 80259 US-421 SPOT IMPROVEMENTS TO IMPROVE PL
GEOMETRICS AT PARTICULAR DN
LOCATIONS OF US 421 CROSSING OVER RW
PINE MOUNTAIN BETWEEN US 119 AND UT SPP 800,000
KY 221 IN HARLAN COUNTY TO
CN SPP 13,520,000
Project Cost: 800,000 13,520,000 0 0
Harlan 80260 KY-72 TO IMPROVE ACCESS, CONNECTIVITY PL
AND MOBILITY BY EXTENDING KY 72 DN SPP 1,000,000
FROM ALVA/BLACK STAR NEAR RW SPP 500,000
HARLAN/ BELL COUNTY LINE. UT SPP 200,000
RECONSTRUCT EXISTING COAL HAUL
CN SPP 8,000,000
Project Cost: 1,000,000 500,000 200,000 8,000,000
Harlan 80358 KY-2010 Spot improvements to widen at particular PL
locations along KY 2010 to improve DN SPP 520,000
mobility and safety (2024CCN) RW SPP 110,000
UT
CN SPP 2,000,000
Project Cost: 520,000 110,000 2,000,000 0
Harlan 80359 KY-221 Spot improvements to improve geometrics PL
at particular locations of KY 221 to DN SPP 520,000
address safety concerns (MP 10 - 17.5) RW SPP 200,000
(2024CCN) UT SPP 200,000
CN SPP 1,300,000
Project Cost: 520,000 200,000 200,000 1,300,000
Harlan 80365 KY-221, Improve safety along KY 38, KY 221, KY PL
KY-38, 987, US 421, and KY 522 by removing DN
KY-522, trees (2024CCN) RW
KY-987, UT
US-421
CN SPP 1,000,000
Project Cost: 1,000,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 109
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Harlan 80401 US-421 Reconstruct remaining unimproved section PL
of US421 from the end of the progressive DN
design-build project to Barn Branch RW STP2 2,070,000
UT STP2 2,000,000
CN STP2 14,130,000
Project Cost: 4,070,000 0 14,130,000 0
Total for Harlan county PL
DN 4,062,000 550,000 344,000
RW 2,070,000 2,810,000
UT 2,800,000 900,000
CN 6,040,000 16,648,000 21,630,000 43,256,000
Total Amounts: 14,972,000 19,458,000 23,080,000 43,600,000
Harrison 8300 US-27 CONSTRUCT WEST US-27 CYNTHIANA PL
BYPASS: SECTION THREE FROM US-27 DN SPP 1,080,000
NORTH TO US 62 EAST. (06CCN) RW SPP 2,900,000
(2024CCN) UT SPP 570,000
CN SPP 18,250,000
Project Cost: 0 1,080,000 2,900,000 18,820,000
Harrison 8708 US-27 RECONSTRUCT US 27 FROM MP 11.9 TO PL
MP 12.4. (12CCN)(14CCR)(18CCN) DN
(2022CCR) (2024CCR) RW SPP 1,050,000
UT SPP 540,000
CN SPP 9,180,000
Project Cost: 1,050,000 540,000 9,180,000 0
Harrison 10040 KY-36 BRIDGE PROJECT IN HARRISON COUNTY PL
ON (049B00053N) PLEASANT STREET AT DN BRX 1,067,965
SO.FK. LICKING RIVER RW
UT
CN
Project Cost: 0 0 0 1,067,965
110 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Harrison 10042 CR-1316 BRIDGE PROJECT IN HARRISON COUNTY PL
ON (049R00603N) NEBO RD AT CSX DN BRX 271,998
RAILWAY RW
UT
CN BRX 1,813,320
Project Cost: 0 0 2,085,318 0
Harrison 80251 CR-1124, CONSTRUCT A CONNECTOR ROAD PL
KY-982, BETWEEN OLD LAIR ROAD AND KY 982 DN
PF-9999, (NEW LAIR ROAD) NEAR THE HARRISON RW
US-27 COUNTY HIGH SCHOOL. (2022CCN) UT
(2024CCR)
CN SPP 10,000,000
Project Cost: 0 0 10,000,000 0
Harrison 80252 CS-1159 CONSTRUCT A ROUNDABOUT AT THE PL
INTERSECTION OF WEBSTER AVENUE DN
(CS-1071) AND EDUCATION DRIVE. RW
(2022CCN) (2024CCR) UT
CN SPP 650,000
Project Cost: 650,000 0 0 0
Harrison 80353 KY-982 Provide a two way left turn lane on KY PL
982 (New Lair Road) (MP 4.4 - 5.1) DN
(2024CCN) RW
UT SPP 1,500,000
CN SPP 8,000,000
Project Cost: 1,500,000 0 0 8,000,000
Total for Harrison county PL
DN 1,080,000 271,998 1,067,965
RW 1,050,000 2,900,000
UT 1,500,000 540,000 570,000
CN 650,000 20,993,320 26,250,000
Total Amounts: 3,200,000 1,620,000 24,165,318 27,887,965
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 111
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hart 20049 KY-218 ADDRESS CONDITION OF KY-218 FROM PL
MILEPOINT 7.245 TO MILEPOINT 11.528 DN STP5 264,000
RW
UT
CN STP5 3,036,000
Project Cost: 264,000 3,036,000 0 0
Hart 80304 PF-9999 IMPROVE CONNECTION BETWEEN KY 88 PL
AND US 31W NEAR I-65 IN DN STP2 1,400,000
MUNFORDVILLE. (2024CCN) RW STP2 1,888,000
UT STP2 750,000
CN STP2 8,000,000
Project Cost: 1,400,000 2,638,000 0 8,000,000
Hart 80407 US-31 Improve the intersections and access PL
management along US 31W at KY 88 and DN
KY 571 near the Hart County High School RW STP2 1,500,000
UT STP2 500,000
CN STP2 5,000,000
Project Cost: 1,500,000 500,000 5,000,000 0
Total for Hart county PL
DN 1,664,000
RW 1,500,000 1,888,000
UT 1,250,000
CN 3,036,000 5,000,000 8,000,000
Total Amounts: 3,164,000 6,174,000 5,000,000 8,000,000
Henderson 2091.1000 US-41 BRIDGE PROJECT IN HENDERSON PL
COUNTY ON ( 051B00002R/051B00007L) DN BRO 405,000
US-41 AT OHIO RIVER FBP 3,000,000
RW
UT
CN BRO 2,700,000
FBP 20,000,000
Project Cost: 0 26,105,000 0 0
112 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Henderson 10148 KY-2084 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY 2084 OVER BR CANOE CRK DN FBP 305,183
(051B00052N) RW
UT
CN FBP 2,034,551
Project Cost: 0 0 0 2,339,734
Henderson 10163 US-41 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US-41 OVER OHIO RIVER (051B00002R) DN BRO 2,613,900
RW
UT
CN BRO 26,139,000
Project Cost: 0 28,752,900 0 0
Henderson 22093 I -69 ADDRESS CONDITION OF I-069 FROM PL
MILEPOINT 137.141 TO MILEPOINT DN NHPM 1,800,000
142.334 RW
UT
CN NHPM 18,000,000
Project Cost: 0 19,800,000 0 0
Henderson 22193 AU-9005 ADDRESS CONDITION OF Audubon PL
Parkway FROM MILEPOINT 0 TO DN NHPM 1,400,000
MILEPOINT 8.88 RW
UT
CN NHPM 14,000,000
Project Cost: 0 0 15,400,000 0
Henderson 22194 AU-9005 ADDRESS CONDITION OF Audubon PL
Parkway FROM MILEPOINT 8.88 TO DN NHPM 1,150,000
MILEPOINT 15.883 RW
UT
CN NHPM 11,550,000
Project Cost: 0 0 12,700,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 113
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Henderson 80309 PF-9999 CONSTRUCT A NEW ROUTE INTO THE PL
PARK FROM WATSON LANE. (2024CCN) DN
RW SPP 300,000
UT SPP 250,000
CN SPP 2,900,000
Project Cost: 550,000 2,900,000 0 0
Henderson 80310 KY-425 IMPROVE LEVEL OF SERVICE ON KY 425 PL
FROM US60 TO US 41. (2024CCN) DN SPP 1,740,000
RW SPP 660,000
UT SPP 470,000
CN SPP 30,160,000
Project Cost: 1,740,000 660,000 470,000 30,160,000
Henderson 80311 US-60 IMPROVE EASTERN INTERSECTION OF US PL
60 AND KY 1078. (2024CCN) DN SPP 270,000
RW SPP 390,000
UT SPP 440,000
CN SPP 1,620,000
Project Cost: 270,000 390,000 440,000 1,620,000
Henderson 80350 KY-812 Improve congestion and mobility on KY PL
812 in the vicinity of sports complex (MP DN SPP 520,000
5.7-6.11). (2024CCN) RW SPP 300,000
UT SPP 500,000
CN SPP 2,500,000
Project Cost: 520,000 300,000 500,000 2,500,000
Henderson 80413 PF-9999 Construct a new connector between PL
US-41 and US-60 in Henderson between DN
MM 11.9 and 12.1 on US-41 N and MM RW STPF 2,100,000
12.3 and 12.4 on US 60 E. UT STPF 1,750,000
CN STPF 13,500,000
Project Cost: 0 3,850,000 13,500,000 0
114 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Henderson county PL
DN 2,530,000 7,818,900 2,550,000 305,183
RW 300,000 3,450,000
UT 250,000 1,750,000 1,410,000
CN 69,739,000 39,050,000 36,314,551
Total Amounts: 3,080,000 82,757,900 43,010,000 36,619,734
Henry 552 I -71 IMPROVE SAFETY AND REDUCE PL
CONGESTION ON I-71 FROM KY-53 TO DN
KY-153. RW NH 1,800,000
UT NH 900,000
CN NH 56,200,000
Project Cost: 2,700,000 56,200,000 0 0
Henry 572 I -71 IMPROVE SAFETY AND REDUCE PL
CONGESTION ON I-71 FROM KY 153 TO DN SPP 4,320,000
US 421. (2024CCN) RW SPP 1,500,000
UT
CN
Project Cost: 4,320,000 1,500,000 0 0
Henry 8820 KY-55 REHABILITATION-OVERLAY AND PL
WIDENING EXISTING KY-55 FROM KY-22 DN
TO CURVE AT MP 2.210 NORTH OF RW
EMINENCE. INCLUDES REPLACING UT SPP 1,450,000
EXISTING CURB AND GUTTER AND
CN SPP 3,460,000
Project Cost: 1,450,000 0 3,460,000 0
Henry 8822 KY-389 GEOTECH REPAIRS ON KY-389 IN HENRY PL
COUNTY ABOVE THE KENTUCKY RIVER DN SPP 580,000
SOUTH OF MARSHALLS BOTTOM ROAD. RW SPP 600,000
(14CCN)(2024CCN) UT SPP 290,000
CN SPP 2,320,000
Project Cost: 580,000 890,000 2,320,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 115
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Henry 10109 KY-202 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY 202 OVER FLAG RUN (052B00011N) DN FBP2 155,757
RW
UT
CN FBP2 1,038,381
Project Cost: 0 0 1,194,138 0
Henry 20068 I -71 ADDRESS CONDITION OF I-071 FROM PL
MILEPOINT 24.727 TO MILEPOINT 29.112 DN NHPM 450,000
(28.17 CARDINAL) RW
UT
CN NHPM 4,541,533
Project Cost: 0 4,991,533 0 0
Henry 80413 KY-153 Improve safety and traffic operstions on PL
KY 153 between KY 712 and KY 146. A DN SPP 360,000
total of 80 housing units are scheduled for RW SPP 90,000
construction in 2026, prompting the need UT SPP 170,000
to add road shoulders to enhance safety
CN SPP 3,950,000
Project Cost: 360,000 260,000 3,950,000 0
Total for Henry county PL
DN 5,260,000 450,000 155,757
RW 1,800,000 2,190,000
UT 2,350,000 460,000
CN 60,741,533 10,768,381
Total Amounts: 9,410,000 63,841,533 10,924,138 0
Hickman 10145 KY-307 BRIDGE PROJECT IN HICKMAN COUNTY PL
ON (053B00017N) KY-307 AT NORTH DN BRX 299,943
FORK BAYOU DE CHIE RW
UT
CN BRX 1,999,620
Project Cost: 0 2,299,563 0 0
116 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hickman 10147 KY-58 BRIDGE PROJECT IN HICKMAN COUNTY PL
ON (053B00042N) KY-58 AT OBION DN FBP 830,898
CREEK RW
UT
CN FBP 5,539,320
Project Cost: 6,370,218 0 0 0
Hickman 10149 KY-1475 BRIDGE PROJECT IN HICKMAN COUNTY PL
ON (053B00078N) KY-1475 AT DN BRX 112,898
HURRICANE BRANCH RW
UT
CN BRX 752,652
Project Cost: 0 0 0 865,550
Hickman 10150 KY-3061 BRIDGE PROJECT IN HICKMAN COUNTY PL
ON (053B00093N) KY-3061 AT BR OF DN BRX 136,244
BRUSH CREEK (EAST) RW
UT
CN BRX 908,293
Project Cost: 0 0 0 1,044,537
Hickman 80203 US-51 Correct geometric deficiencies and PL
improve safety, access, and regional DN
connectivity from Clayton Street to RW
KY-703 in Clinton. (2022CCN) (2024CCR) UT STP2 2,500,000
CN STP2 8,000,000
Project Cost: 2,500,000 8,000,000 0 0
Hickman 80325 US-51 CORRECT GEOMETRIC DEFICIENCIES AND PL
IMPROVE SAFETY, ACCESS, AND DN NH 1,700,000
REGIONAL CONNECTIVITY FROM KY-703 RW NH 2,500,000
IN CLINTON TO .160 MILES SOUTH OF UT NH 4,000,000
OBION CREEK BRIDGE. (2024CCN)
CN NH 18,000,000
Project Cost: 1,700,000 0 6,500,000 18,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 117
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hickman 80327 US-51 IMPROVE SAFETY, ACCESS, AND PL
REGIONAL CONNECTIVITY, AND DN NH 1,000,000
ADDRESS GEOMETRIC DEFICIENCIES RW NH 1,000,000
FROM HICKMAN C/L TO CANE CREEK UT NH 2,000,000
BRIDGE. (2024CCN)
CN NH 8,000,000
Project Cost: 1,000,000 3,000,000 0 8,000,000
Hickman 80328 US-51 CORRECT GEOMETRIC DEFICIENCIES, AND PL
IMPROVE SAFETY, ACCESS AND DN SPP 1,560,000
REGIONAL CONNECTIVITY FROM BAYOU RW SPP 1,050,000
DE CHEIN BRIDGE TO MARTIN ROAD. UT SPP 1,000,000
(2024CCN)
CN SPP 6,500,000
Project Cost: 1,560,000 1,050,000 1,000,000 6,500,000
Hickman 80329 KY-307 IMPROVE SAFETY, TRUCK MOBILITY, PL
AND GEOMETRIC DEFICIENCIES AT THE DN SPP 800,000
ICR RAILROAD OVERPASS. (2024CCN) RW SPP 750,000
UT SPP 1,000,000
CN SPP 4,000,000
Project Cost: 800,000 1,750,000 0 4,000,000
Hickman 80330 US-51 IMPROVE INTERSECTION GEOMETRICS PL
AND ADDRESS SIGHT DISTANCE ISSUES DN SPP 520,000
WITH ACCESS TO US 51 FROM KY 1301 RW SPP 150,000
AND THE ENTRANCE OF HARPERS UT SPP 350,000
COUNTRY HAMS NEAR CLINTON.
CN SPP 2,000,000
Project Cost: 520,000 150,000 350,000 2,000,000
Hickman 80410 US-51 Improve safety, access, geometric PL
deficiencies and economic development DN NH 300,000
issues from Ezell Lane to Clayton Street RW NH 1,000,000
UT NH 400,000
CN NH 2,500,000
Project Cost: 300,000 1,400,000 2,500,000 0
118 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Hickman county PL
DN 6,710,898 299,943 249,142
RW 3,950,000 2,500,000
UT 2,500,000 3,400,000 5,350,000
CN 5,539,320 9,999,620 2,500,000 40,160,945
Total Amounts: 14,750,218 17,649,563 10,350,000 40,410,087
Hopkins 129 US-41 Remove the median on US 41 (South Main PL
Street) from the railroad to MP 15.521 DN NH 925,000
(2024CCN) RW NH 700,000
UT NH 1,350,000
CN NH 13,200,000
Project Cost: 925,000 700,000 1,350,000 13,200,000
Hopkins 384 KY-281 IMPROVE KY-281 FROM ISLAND PARK PL
DRIVE TO 0.25 MI NORTH OF CARRIAGE DN
LANE (KY-2281). RW SPP 2,100,000
UT SPP 1,930,000
CN SPP 5,270,000
Project Cost: 2,100,000 1,930,000 5,270,000 0
Hopkins 804.4000 CS-1287 Reconstruct Whittington Drive beginning PL
500’ south of Commerce Drive and ending DN
at the intersection of Whittington Drive and RW SPP 2,400,000
Island Ford Road (KY 281), including the UT SPP 1,680,000
reconstruction of the KY 281 intersection.
CN SPP 3,230,000
Project Cost: 4,080,000 3,230,000 0 0
Hopkins 8305 US-41 IMPROVE NORTH MAIN STREET FROM PL
HOSPITAL DRIVE TO KY-281. (06CCN) DN
(12CCR)(18CCR) (2024CCR) RW
UT
CN SPP 9,470,000
Project Cost: 9,470,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 119
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hopkins 10093 I -69 BRIDGE PROJECT IN HOPKINS COUNTY PL
ON (054B00016N) EDWARD T BREATHITT DN BRO 1,235,868
AT PENNYRILE PARKWAY RW
UT
CN
Project Cost: 0 0 0 1,235,868
Hopkins 10098 KY-109 BRIDGE PROJECT IN HOPKINS COUNTY PL
ON (054B00076N) KY-109 AT CLEAR DN BRX 1,149,704
CREEK RW
UT
CN BRX 7,664,692
Project Cost: 0 0 0 8,814,396
Hopkins 20067 US-41 ADDRESS CONDITION OF US-41 FROM PL
MILEPOINT 12.376 TO MILEPOINT 14.53 DN STP3 224,000
RW
UT
CN STP3 2,576,000
Project Cost: 0 2,800,000 0 0
Hopkins 22192 EB-9004 ADDRESS CONDITION OF Edward T. PL
Breathitt Pennyrile Parkway FROM DN NHPM 910,000
MILEPOINT 29.9 TO MILEPOINT 32.861 RW
UT
CN NHPM 9,091,115
Project Cost: 10,001,115 0 0 0
Hopkins 80105 US-41 IMPROVE US 41A BEGINNING AT PL
INDUSTRIAL DR AT HOPKINS CO ENDING DN NH 2,500,000
AT PROVIDENCE (2022CCR) (2024CCR) RW NH 2,000,000
UT NH 5,000,000
CN NH 30,000,000
Project Cost: 2,500,000 0 7,000,000 30,000,000
120 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Hopkins 80105.1000US-41 IMPROVE US41A BEGINNING NEAR NEBO PL
AT MP 8.7 AND ENDING AT MP 11.2 IN DN
HOPKINS COUNTY. (2022BOP) RW SPP 2,630,000
(2024CCN) UT SPP 2,500,000
CN SPP 5,500,000
Project Cost: 2,630,000 2,500,000 5,500,000 0
Hopkins 80105.2000US-41 IMPROVE US41A BEGINNING NEAR KY PL
630 AT MP 5.0 AND ENDING AT MP 7.4 IN DN
HOPKINS COUNTY. (2022BOP) RW SPP 1,800,000
UT SPP 1,740,000
CN SPP 4,640,000
Project Cost: 1,800,000 1,740,000 4,640,000 0
Hopkins 80300 KY-260 IMPROVE SAFETY AND MOBILITY OF KY PL
260 FROM THE APPROACHES AT THE DN
RAILROAD CROSSING IN HANSON TO RW SPP 2,000,000
THE SOUTHBOUND ON AND OFF RAMPS UT SPP 1,670,000
OF I69. (2024CCN)
CN SPP 6,760,000
Project Cost: 0 3,670,000 6,760,000 0
Total for Hopkins county PL
DN 4,335,000 224,000 2,385,572
RW 8,930,000 2,700,000 2,000,000
UT 1,680,000 7,840,000 6,350,000
CN 18,561,115 5,806,000 22,170,000 50,864,692
Total Amounts: 33,506,115 16,570,000 30,520,000 53,250,264
Jackson 80104 US-421 ADDRESS SUBSTANDARD HORIZONTAL PL
AND VERTICAL ALIGNMENT OF US 421 IN DN
THE CLOVER BOTTOM AREA NEAR THE RW
STONE QUARRY. (2020CCN) UT
CN SPP 14,360,000
Project Cost: 0 14,360,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 121
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jackson 80313 KY-290 Improve the existing geometric alignments PL
at two spot locations (MP 4.7-6.3 and DN SPP 1,040,000
8.0-8.5) by realigning curves in high crash RW SPP 1,650,000
cluster areas and widening. Improve UT SPP 1,620,000
design speed to 45 mph along these two
CN SPP 5,040,000
Project Cost: 1,040,000 1,650,000 1,620,000 5,040,000
Total for Jackson county PL
DN 1,040,000
RW 1,650,000
UT 1,620,000
CN 14,360,000 5,040,000
Total Amounts: 1,040,000 16,010,000 1,620,000 5,040,000
Jefferson 48.1000 I-71 ADDITION OF NB AND SB AUXILIARY PL
LANES ON I-71 NEAR KENNEDY, DN
INCLUDING OPERATIONAL RW
IMPROVEMENTS TO THE ZORN UT
INTERCHANGE. (2004BOPC) (2024CCR)
CN NH 55,324,500
Project Cost: 55,324,500 0 0 0
Jefferson 323.0100 KY-1931 WIDEN GREENWOOD ROAD FROM PL
GREENBELT HWY TO DIXIE HWY DN
(US-31W) (3-LANE IMPROVEMENT) FROM RW
MP 0.54 TO MP 3.148. (98CCR) UT
(R-04DEOB)(04CCR)(BOP2006P)(10CCR)
CN SPP 32,940,000
Project Cost: 32,940,000 0 0 0
Jefferson 344.0100 KY-1747 WIDEN SOUTHBOUND HURSTBOURNE PL
LANE TO 3 LANES FROM LINN STATION DN
RD (CS-1004H) TO EDEN AVE RW
(CS-1660H). (06CCR) (03KYD) UT SPP 2,380,000
(2006BOPP)(SEE 5-344.02 FOR KYD C
CN SPP 3,900,000
Project Cost: 2,380,000 3,900,000 0 0
122 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 373.2000 KY-1819 RECONSTRUCT AND WIDEN KY 1819 PL
(WATTERSON TRAIL) - PLANTSIDE DRIVE DN SPP 470,000
TO BLUEGRASS PARKWAY. (98CCR) RW
(2024CCN) UT SPP 2,110,000
CN SPP 9,000,000
Project Cost: 470,000 2,110,000 9,000,000 0
Jefferson 478.3000 US-31 IMPROVE DIXIE HIGHWAY BETWEEN PL
GREENWOOD ROAD (KY 1931) AND DN NH 630,000
STONESTREET ROAD (CR 1003). (14CCN) RW SPP 510,000
(2024CCN) UT SPP 1,390,000
CN NH 7,540,000
Project Cost: 630,000 1,900,000 7,540,000 0
Jefferson 554 I -265 IMPROVE SAFETY AND REDUCE PL
CONGESTION ON I-265 FROM I-65 TO DN
US-31E. (2024CCR) RW NH 3,560,000
UT NH 3,010,000
CN NH 76,050,000
Project Cost: 0 3,560,000 3,010,000 76,050,000
Jefferson 555 KY-1747 REDUCE CONGESTION AND IMPROVE PL
SAFETY ALONG KY-1747 DN SPP 7,660,000
(HURSTBOURNE PARKWAY) FROM RW SPP 9,000,000
STONY BROOK DRIVE TO I-64. UT SPP 10,440,000
(2024CCN)
CN SPP 77,720,000
Project Cost: 7,660,000 9,000,000 10,440,000 77,720,000
Jefferson 557 I -71 IMPROVE SAFETY AND REDUCE PL
CONGESTION ON I-71 FROM I-264 TO DN
I-265. (2024CCR) RW
UT NH 940,000
CN
Project Cost: 0 940,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 123
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 558 I -265 IMPROVE SAFETY AND REDUCE PL
CONGESTION ON I-265 FROM US-31E DN NH 7,500,000
(BARDSTOWN RD) TO KY-155 RW NH 2,500,000
(TAYLORSVILLE RD). (2024CCR) UT NH 1,500,000
CN NH 75,000,000
Project Cost: 7,500,000 2,500,000 1,500,000 75,000,000
Jefferson 559 I -65 IMPROVE SAFETY AND REDUCE PL
CONGESTION AT THE I-65/I-264 DN NH 3,480,000
(WATTERSON EXPRESSWAY) RW NH 2,000,000
INTERCHANGE. (2024CCR) UT NH 2,000,000
CN NH 100,000,000
Project Cost: 3,480,000 2,000,000 2,000,000 100,000,000
Jefferson 560 I-65 IMPROVE SAFETY AND REDUCE PL
CONGESTION AT THE I-65/I-265 (GENE DN NH 6,000,000
SNYDER FREEWAY) INTERCHANGE. RW NH 2,000,000
UT NH 2,000,000
CN NH 90,000,000
Project Cost: 6,000,000 4,000,000 90,000,000 0
Jefferson 965.1900 CO-0 DEDICATED FEDERAL AID STP FUNDS PL
EARMARKED FOR LOUISVILLE DN
URBANIZED AREA AND SUBJECT TO MPO RW
CONTROL FOR FY 2026-2032. (FUNDING UT
SUBJECT TO FISCAL CONSTRAINT
CN SLO 26,800,000 26,800,000 26,800,000 26,800,000
Project Cost: 26,800,000 26,800,000 26,800,000 26,800,000
Jefferson 8205.1000 KY-2053 IMPROVE AND WIDEN MT WASHINGTON PL
ROAD FROM PRESTON HIGHWAY TO DN
PENN RUN CREEK BRIDGE. (10CCN) RW SPP 5,080,000
(SAME AS 5-8611.00) (2024CCN) UT SPP 9,510,000
CN SPP 13,190,000
Project Cost: 5,080,000 9,510,000 13,190,000 0
124 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 8860 I-71 DESIGN AND CONSTRUCT A SOUND PL
BARRIER WALL ON THE NORTH SIDE OF DN SPP 350,000
I-71 FROM MP 7.5 TO MP 8.7 FOR RW
APPROX. 6400 FEET. (90,893 SF) UT
CN SPP 8,200,000
Project Cost: 350,000 8,200,000 0 0
Jefferson 8905 KY-1747, EXTEND THE LEFT TURN LANE ON PL
PF-9999 HURSTBOURNE LANE AT INTERSECTION DN
WITH SIX MILE LANE. (16CCN) (2024CCN) RW
UT
CN SPP 210,000
Project Cost: 210,000 0 0 0
Jefferson 8953 KY-1747 IMPROVE THE HURSTBOURNE PARKWAY PL
(KY 1747) AT SHELBYVILLE ROAD (US DN
60) INTERSECTION TO INCREASE RW SPP 750,000
CAPACITY, REDUCE DELAYS, AND UT SPP 1,040,000
IMPROVE SAFETY. (16CCN)
CN SPP 2,600,000
Project Cost: 1,790,000 2,600,000 0 0
Jefferson 8954.1000 KY-155 Improve safety and traffic operations on PL
KY 155 from MP 2.0 in Spencer County to DN
Floyds Fork In Jefferson County (total RW STPF 3,540,000
length 6.247 miles) (Portion of 5-8954.0). UT STPF 11,226,000
(2024CCN)
CN STPF 34,120,000
Project Cost: 0 3,540,000 11,226,000 34,120,000
Jefferson 8963 I-71 DESIGN AND CONSTRUCT A SOUND PL
BARRIER WALL ON I-71 NORTHBOUND DN SPP 250,000
FROM NEAR GLENVIEW AVENUE TO RW
JUST NORTH OF THE LIME KILN UT
OVERPASS FOR APPROXIMATELY 2,700
CN SPP 2,300,000
Project Cost: 250,000 2,300,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 125
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 9026 CR-1013, SAFETY IMPROVEMENTS AT CR 1013F PL
KY-1934 AT CRUMS LANE ELEMENTARY. DN SPP 420,000
(2020BOP)(2021SCHSAF) (2024CCN) RW
UT
CN
Project Cost: 420,000 0 0 0
Jefferson 10057 I -64 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00039L and 056B00039R) I-64 DN FBP 830,898
WB AT TUCKER STATION RD RW
UT
CN FBP 10,700,000
Project Cost: 830,898 0 10,700,000 0
Jefferson 10063 I -265 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00087R) I-265 NB AT KY 22 DN BRO 1,706,159
(BROWNSBORO RD) RW
UT
CN BRO 11,374,391
Project Cost: 0 0 13,080,550 0
Jefferson 10065 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00180N) I-65 AT US 60A DN
(EASTERN PKWY) RW
UT
CN BRO 25,515,595
FBP 10,062,708
Project Cost: 35,578,303 0 0 0
Jefferson 10067 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00184N) I-65 AT ST CATHERINE DN FBP 750,000
ST RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
126 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 10070 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00205N) I-65 AT NS RAILROAD DN FBP 750,000
(POTENTIAL CMGC DELIVERY PROJECT) RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
Jefferson 10071 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00209N) I-65 AT PHILLIPS LN DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
Jefferson 10072 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00210N) I-65 AT MANNING RD DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
Jefferson 10073 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00211N) I-65 AT KFEC GATE 6 DN FBP 750,000
DR RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
Jefferson 10076 I -264 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00269N) I-264 EB AT I-264 WB DN BRO 96,734
OFF RAMP RW
UT
CN BRO 644,896
Project Cost: 0 0 741,630 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 127
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 10077 I -264 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00273N) I-264 EB ON RAMP AT DN FBP 1,430,900
P&L RAILWAY RW
UT
CN FBP 9,539,336
Project Cost: 0 0 10,970,236 0
Jefferson 10078 I -64 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00278N) I-64 WB RAMP AT I-64 DN BRO 463,096
EB RW
UT
CN BRO 3,087,310
Project Cost: 0 0 0 3,550,406
Jefferson 10082 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00389N) I-65 AT GRADE LN DN BRO 872,972
RW
UT
CN FBP 5,819,814
Project Cost: 0 0 6,692,786 0
Jefferson 10083 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00390N) I-65 AT STANDIFORD DN FBP 1,039,935
LN RW
UT
CN FBP 6,932,898
Project Cost: 0 0 7,972,833 0
Jefferson 10103 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00186N) I-65 AT OAK STREET. DN FBP 750,000
(POTENTIAL CMGC DELIVERY PROJECT) RW
UT
CN BRO 5,000,000
Project Cost: 0 0 0 5,750,000
128 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 10104 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00182N) I-65 AT BRANDIES DN
AVE. (POTENTIAL CMGC DELIVERY RW
PROJECT) UT
CN FBP 15,537,793
Project Cost: 15,537,793 0 0 0
Jefferson 10105 I -65 BRIDGE PROJECT IN JEFFERSON COUNTY PL
ON (056B00181N) I-65 AT UNIVERSITY DN
BLVD. (POTENTIAL CMGC DELIVERY RW
PROJECT) UT
CN BRO 17,497,802
Project Cost: 17,497,802 0 0 0
Jefferson 10112 KY-1703 ADDRESS DEFICIENCIES OF BRIDGE ON PL
CR 1002 OVER NS RAILROAD & HIKES LN DN BRX 1,129,560
(056B00122L) RW
UT
CN BRX 7,530,401
Project Cost: 0 0 8,659,961 0
Jefferson 10113 KY-1703 ADDRESS DEFICIENCIES OF BRIDGE ON PL
CR 1002 OVER NS RAILROAD & HIKES LN DN BRX 1,129,560
(056B00122R) RW
UT
CN BRX 7,530,401
Project Cost: 0 0 8,659,961 0
Jefferson 10115 US-31 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US 31 OVER OHIO RIVER (056B00136N) DN
RW
UT
CN FBP 33,546,500
Project Cost: 33,546,500 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 129
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 20022 KY-841 ADDRESS CONDITION OF KY-841 FROM PL
MILEPOINT 0 TO MILEPOINT 10.25 DN NHPM 1,312,000
RW
UT
CN NHPM 15,088,000
Project Cost: 0 0 0 16,400,000
Jefferson 20028 KY-1934 ADDRESS CONDITION OF KY-1934 FROM PL
MILEPOINT 0 TO MILEPOINT 4.44 DN NHPM 340,000
RW
UT
CN NHPM 3,910,000
Project Cost: 340,000 3,910,000 0 0
Jefferson 20030 KY-2048 ADDRESS CONDITION OF KY-2048 FROM PL
MILEPOINT 0 TO MILEPOINT 1.13 DN STP5 88,000
RW
UT
CN STP5 1,012,000
Project Cost: 1,100,000 0 0 0
Jefferson 20031 KY-2052 ADDRESS CONDITION OF KY-2052 FROM PL
MILEPOINT 0 TO MILEPOINT 4.205 DN STP3 336,000
RW
UT
CN STP3 3,864,000
Project Cost: 4,200,000 0 0 0
Jefferson 20065 I -64 ADDRESS CONDITION OF I-064 FROM PL
MILEPOINT 0.795 (0.828 CARDINAL) TO DN NHPM 550,000
MILEPOINT 5.217 (4.935 NON-CARDINAL) RW
UT
CN NHPM 5,455,000
Project Cost: 0 0 6,005,000 0
130 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 20067 I -65 ADDRESS CONDITION OF I-065 FROM PL
MILEPOINT 127.57 TO MILEPOINT 131.24 DN NHPM 790,000
RW
UT
CN NHPM 7,910,000
Project Cost: 8,700,000 0 0 0
Jefferson 22023 I -64 ADDRESS CONDITION OF I-064 FROM PL
MILEPOINT 11.574 TO MILEPOINT 13.206 DN NHPM 2,500,000
(13.124 CARDINAL) RW
UT
CN STP5 11,000,000
Project Cost: 0 0 0 13,500,000
Jefferson 22069 I -65 ADDRESS CONDITION OF I-065 FROM PL
MILEPOINT 123.18 TO MILEPOINT 127.57 DN
RW
UT
CN NHPM 76,000,000
Project Cost: 76,000,000 0 0 0
Jefferson 22096 I -71 ADDRESS CONDITION OF I-071 FROM PL
MILEPOINT 0 TO MILEPOINT 3.66 DN STP5 200,000
RW
UT
CN STP5 2,000,000
Project Cost: 0 2,200,000 0 0
Jefferson 22140 I -264 ADDRESS CONDITION OF I-264 FROM PL
MILEPOINT 18.41 TO MILEPOINT 20.7 DN NHPM 540,000
RW
UT
CN NHPM 5,449,257
Project Cost: 0 5,989,257 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 131
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 80000 KY-1531 EASTWOOD FISHERSVILLE CONNECTOR PL
TO I-64 DN
RW NH 8,000,000
UT NH 2,000,000
CN NH 45,000,000
Project Cost: 0 8,000,000 2,000,000 45,000,000
Jefferson 80001 US-60 IMPROVE OPERATIONS ALONG US-60 PL
FROM OLD SHELBYVILLE ROAD TO DN
NORTH ENGLISH STATION ROAD. RW
(18CCN) (2020CCR) (2024CCR) UT
CN NH 4,680,000
Project Cost: 0 4,680,000 0 0
Jefferson 80006 I -65, CONSTRUCT NEW INTERCHANGE ON PL
KY-1065, KY-841 AT THE RENAISSANCE SOUTH DN
KY-841, BUSINESS PARK(18CCN) (FUNDED WITH RW
PF-9999 LOCAL FUNDS) (2024CCN) UT
CN NH 16,330,000
Project Cost: 16,330,000 0 0 0
Jefferson 80108 CR-1015 WIDEN AND IMPROVE RANGELAND RD PL
FROM POLAR LEVEL RD TO DN
SHEPHERDSVILLE RD (2020CCN) RW SPP 1,380,000
(2022CCR) (2024CCR) UT SPP 1,150,000
CN SPP 3,500,000
Project Cost: 1,380,000 1,150,000 3,500,000 0
Jefferson 80110 KY-2055 CONSTRUCT A SIDEWALK ALONG MT PL
HOLLY RD FROM CHARLENE DR TO FOX DN
AVE FOR CORAL RIDGE ELEMENTARY RW SPP 40,000
(2020CCN) UT SPP 40,000
CN SPP 330,000
Project Cost: 40,000 40,000 330,000 0
132 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 80200 KY-2050 Reduce congestion, improve safety, and PL
enhance mobility on KY 2050 (Herr Lane) DN
from Prince Valiant Drive/Westmar RW
Terrace to Bedford Lane. (2022CCN) UT SPP 2,030,000
(2024CCR)
CN SPP 2,860,000
Project Cost: 2,030,000 2,860,000 0 0
Jefferson 80203 KY-1065 Improve safety and reduce congestion on PL
KY 1065 (Outer Loop) from I-65 to KY DN STPF 2,450,000
2052 (Shepherdsville Road). Project will RW STPF 3,440,000
evaluate the addition of one travel lane in UT STPF 2,730,000
each direction and consider
CN STPF 27,250,000
Project Cost: 2,450,000 3,440,000 2,730,000 27,250,000
Jefferson 80204 KY-1931 Improve safety and reduce congestion on PL
KY 1931 (Manslick Road) from KY 1931 DN
(St. Andrews Church Road) to I-264 RW SPP 6,650,000
(Henry Watterson Expressway). Project UT SPP 12,030,000
will evaluate 3-lane widening and
CN SPP 10,270,000
Project Cost: 6,650,000 12,030,000 10,270,000 0
Jefferson 80205 KY-61 Improve safety, reduce congestion, and PL
improve multi-modal transportation options DN NH 6,570,000
along KY 61 from Commerce Crossings Dr RW NH 10,510,000
(BMP 1.395) to Briden Avenue (EMP UT NH 10,570,000
8.400) including the I-264 (Watterson
CN NH 58,850,000
Project Cost: 6,570,000 10,510,000 10,570,000 58,850,000
Jefferson 80258 KY-1819 REDUCE CONGESTION, IMPROVE PL
SAFETY, AND ENHANCE MOBILITY ON DN
KY 1819 (WATTERSON TRAIL) FROM RW
BLUEGRASS PARKWAY TO UT
BLANKENBAKER PARKWAY (KY 913)
CN SPP 12,480,000
Project Cost: 12,480,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 133
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 80261 US-31 Reduce congestion, improve safety and PL
enhance mobility along the US 31E DN NH 5,830,000
(Bardstown Road) corridor from the RW NH 3,360,000
Bullitt/Jefferson County line to KY 1065 UT NH 2,800,000
(Beulah Church/Seatonville Road). (MP 0.0
CN NH 138,800,000
Project Cost: 5,830,000 3,360,000 2,800,000 138,800,000
Jefferson 80261.3000US-31 Add dedicated turn lanes from Cedar PL
Creek Rd to Bardstown Rd (US 31E). (2nd DN
EB left turn and EB right turn lanes) (MP RW
4.369) UT
CN STPF 2,000,000
Project Cost: 2,000,000 0 0 0
Jefferson 80300 US-31 TRANSPORTATION SYSTEM PL
MANAGEMENT & TRANSPORTATION DN SPP 500,000
DEMAND MANAGEMENT ACTIVITIES ON RW SPP 500,000
US 31E (BARDSTOWN ROAD) BETWEEN UT SPP 500,000
DOUGLASS BOULEVARD & HIKES LANE.
CN SPP 5,000,000
Project Cost: 500,000 500,000 500,000 5,000,000
Jefferson 80302 US-31 TRANSPORTATION SYSTEM PL
MANAGEMENT IMPROVEMENTS ON US DN
31W FROM KY 841 TO KY 44 IN RW SPP 8,350,000
SOUTHERN JEFFERSON COUNTY; TO UT SPP 8,690,000
INCLUDE THE CONSIDERATION OF
CN SPP 3,330,000
Project Cost: 0 8,350,000 8,690,000 3,330,000
Jefferson 80303 KY-1065 IMPROVE SAFETY AND REDUCE PL
CONGESTION AT THE KY 1065 AND KY DN SPP 200,000
61 INTERSECTION. PROJECT WILL RW SPP 240,000
CONSIDER ADDING A RIGHT TURN LANE UT SPP 240,000
ON WESTBOUND KY 1065 (OUTER LOOP)
CN SPP 2,400,000
Project Cost: 200,000 240,000 240,000 2,400,000
134 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 80304 KY-1531 RELOCATE & RECONSTRUCT KY 1531 PL
(JOHNSON ROAD) WITH IMPROVED DN SPP 970,000
GEOMETRY FROM US 60 (SHELBYVILLE RW SPP 470,000
ROAD) TO AIKEN ROAD. PROJECT WILL UT SPP 240,000
CONSIDER A 2 LANE ROAD (NO
CN SPP 10,190,000
Project Cost: 970,000 470,000 240,000 10,190,000
Jefferson 80306 CR-1001 IMPROVE SAFETY AND REDUCE PL SPP 185,000
CONGESTION ON GRADE LANE FROM KY DN SPP 1,200,000
1065 (OUTER LOOP) TO KY 1631 (FERN RW SPP 700,000
VALLEY ROAD). PROJECT DESIGN WILL UT SPP 300,000
EVALUATE 3-LANE WIDENING WITH
CN SPP 13,500,000
Project Cost: 185,000 1,200,000 1,000,000 13,500,000
Jefferson 80310 KY-22 IMPROVE TRAFFIC OPERATIONS ON KY PL
22 FROM JUST EAST OF MURPHY LANE DN SPP 650,000
TO HAUNZ LANE. PROJECT DESIGN WILL RW SPP 420,000
EVALUATE 3-LANE WIDENING WITH UT SPP 630,000
TWOWAY CENTER TURN LANE.
CN SPP 4,000,000
Project Cost: 1,070,000 630,000 4,000,000 0
Jefferson 80311 CS-1005 WEST KENTUCKY STREET (CS 1005) PL
MASTER PLAN PROJECT FROM 18TH DN SPP 520,000
STREET TO 4TH STREET. PROJECT WILL RW SPP 300,000
CONSIDER SIDEWALK IMPROVEMENTS, UT SPP 300,000
BICYCLE FACILITIES, IMPROVEMENTS TO
CN SPP 6,600,000
Project Cost: 520,000 600,000 6,600,000 0
Jefferson 80321 KY-1932 ADDRESS CONGESTION AND SAFETY PL
ISSUES IN THE VICINITY OF THE DN NH 500,000
BRECKENRIDGE LANE (KY 1932) AND RW NH 300,000
DUTCHMANS LANE INTERSECTION. UT NH 400,000
(2024CCN)
CN NH 2,500,000
Project Cost: 500,000 300,000 400,000 2,500,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 135
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 80324 CS-1046, THIS PROJECT IS A MAJOR COMPLETE PL
CS-1176 STREET RE-DESIGN OF 9TH STREET JUST DN SPP 2,990,000
WEST OF THE CENTRAL BUSINESS RW SPP 220,000
DISTRICT OF LOUISVILLE FROM THE OHIO UT SPP 390,000
RIVER SOUTH TO ITS INTERSECTION WITH
CN SPP 17,460,000
Project Cost: 2,990,000 220,000 390,000 17,460,000
Jefferson 80331 CR-1003 IMPROVE SAFETY AND OPERATIONS ON PL SPP 250,000
ARNOLDTOWN ROAD FROM KY 1931 TO DN SPP 2,170,000
KY 907. PROJECT DESIGN WILL RW SPP 520,000
EVALUATE 2 LANE ROAD (NO ADDED UT SPP 190,000
LANES).KIPDA ID# 249 (2024CCN)
CN SPP 13,640,000
Project Cost: 250,000 2,170,000 710,000 13,640,000
Jefferson 80334 I -64 IMPROVEMENTS WITHIN THE I-64 PL
CORRIDOR FROM THE KENNEDY DN NH 2,550,000
INTERCHANGE TO I-264 (WATTERSON RW NH 1,490,000
EXPRESSWAY) ADDRESSING SAFETY UT NH 530,000
AND CONGESTION ISSUES. THE
CN NH 31,980,000
Project Cost: 2,550,000 0 2,020,000 31,980,000
Jefferson 80340 KY-1819 ENHANCE MOBILITY AND PROVIDE SAFE PL
ACCESS TO COMMUNITY FACILITIES DN SPP 470,000
ALONG KY 1819 (WATTERSON TRAIL) RW SPP 40,000
FROM SKYVIEW PARK (MP 10.43) TO UT SPP 50,000
PLANTSIDE DRIVE (MP 10.79). (2024CCN)
CN SPP 840,000
Project Cost: 470,000 40,000 50,000 840,000
Jefferson 80341 KY-1934 IMPROVE SAFETY, REDUCE CONGESTION PL SPP 400,000
AND ENHANCE MOBILITY ALONG THE KY DN NH 3,000,000
1934 (GREENBELT HWY/ CANE RUN RD) RW NH 1,000,000
CORRIDOR FROM THE KY 841/KY 1934 UT NH 2,000,000
INTERCHANGE TO RALPH AVE (MP 0.0-
CN NH 29,000,000
Project Cost: 3,400,000 1,000,000 2,000,000 29,000,000
136 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 80342 US-42 ROADWAY RECONFIGURATION, PL
ONE-WAY TO TWO-WAY CONVERSION. DN
(2024CCN) (POSSIBLE SLO FUNDING) RW
UT SPP 2,200,000
CN SPP 2,950,000
Project Cost: 0 2,200,000 2,950,000 0
Jefferson 80352 KY-1865 Safety improvements on KY 1865 (New PL
Cut Road)/Taylor Boulevard from MP 0.5 DN NH 4,000,000
(just south of Old New Cut Road) to MP RW NH 9,000,000
5.766 (just north of the I-264 ramp). UT NH 8,000,000
(2024CCN)
CN NH 60,000,000
Project Cost: 4,000,000 9,000,000 8,000,000 60,000,000
Jefferson 80355 US-60 Improvements from Eastern Parkway PL
Transportation Study between Bardstown DN SPP 1,130,000
Road to Cherokee Park entrance (MP 6.82 RW
-0.322) with a Memorandum of Agreement UT SPP 450,000
with the Louisville Metro Government.
CN SPP 6,780,000
Project Cost: 1,130,000 450,000 6,780,000 0
Jefferson 80356 US-60 Improvements from Eastern Parkway PL
Transportation Study between Hahn DN SPP 990,000
Street to Concord Drive (MP 3.84-4.15) RW SPP 130,000
with a Memorandum of Agreement with UT SPP 410,000
the Louisville Metro Government.
CN SPP 6,100,000
Project Cost: 990,000 540,000 6,100,000 0
Jefferson 80402 US-60 Reduce congestion using ITS strategies PL
on the following corridors: US 60 DN SPP 3,750,000
(Shelbyville Road) from US 60A RW SPP 300,000
(Lexington Road) to KY 1747 UT SPP 300,000
(Hurstbourne Parkway), US 150/US 31E
CN SPP 17,020,000
Project Cost: 3,750,000 300,000 300,000 17,020,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 137
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 80403 KY-155 Imrpove safety and reduce congestion on PL
KY-155 from Tucker Station Road (MP DN SPP 1,800,000
6.88) to KY 913/Blankenbaker Pkwy (MP RW SPP 1,500,000
8.25). UT SPP 1,500,000
CN SPP 16,500,000
Project Cost: 1,800,000 1,500,000 1,500,000 16,500,000
Jefferson 80404 KY-155 Improve Traffic Operations and Safety on PL
KY 155 from the Floyds Fork Bridge (MP DN
4.000) to KY 148 (MP 4.400). RW SPP 500,000
UT SPP 150,000
CN SPP 7,000,000
Project Cost: 0 500,000 150,000 7,000,000
Jefferson 80405 KY-2049 Reduce congestion and improve safety on PL SPP 200,000
KY 2049 (Crums Lane) from I-264 DN SPP 750,000
underpass to US 31W. Includes RW SPP 1,000,000
consideration of pedestrian facilities, UT SPP 1,200,000
consider bike lane, provide access
CN SPP 6,020,000
Project Cost: 200,000 750,000 2,200,000 6,020,000
Jefferson 80406 US-42 Operational improvements along US 42 PL
from Falls Creek Road (MP 7.5) to DN
Woodstone Way (MP 7.9) RW NH 800,000
UT NH 1,320,000
CN NH 7,090,000
Project Cost: 2,120,000 7,090,000 0 0
Jefferson 80407 I-265 Design and construct a sound barrier wall PL
on the northbound side of I-265 from MP DN SPP 250,000
35.3 to 35.9 (approx. 3,200 feet) RW
UT
CN SPP 4,350,000
Project Cost: 4,600,000 0 0 0
138 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 80408 FF-9999 Extend Urton Lane from north of I-64 to PL
Seatonville Road. Includes consideration DN SPP 4,000,000
of facilities for all modes (pedestrian, RW SPP 3,000,000
bicycle, SOV, and transit). UT SPP 2,500,000
CN SPP 52,000,000
Project Cost: 4,000,000 3,000,000 2,500,000 52,000,000
Jefferson 80418 KY-2050 Reduce congestion and enhance mobility PL
on KY 2050 (Herr Lane) from Bedford DN SPP 300,000
Lane to Wesboro Road. RW SPP 300,000
UT SPP 700,000
CN SPP 1,800,000
Project Cost: 300,000 1,000,000 1,800,000 0
Jefferson 80420 CR-1008 Improve safety and reduce congestion on PL
Shepherdsville Road (CR-1008G) from KY DN SPP 1,765,000
2845 (Manslick Road) to Applegate Lane. RW SPP 882,000
Project design will evaluate a 3 lane road UT SPP 882,000
(third lane will be Two Way Left Turn
CN SPP 20,471,000
Project Cost: 1,765,000 882,000 882,000 20,471,000
Jefferson 80421 CR-1003 Improve safety and reduce congestion on PL
Mud Lane from KY 1450 (Blue Lick Road) DN SPP 809,900
to Brookley Drive. Project design will RW SPP 404,400
evaluate a 3 lane road and consider UT SPP 404,400
bicycle and pedestrian facilities.
CN SPP 9,382,200
Project Cost: 809,900 404,400 404,400 9,382,200
Jefferson 80423 I-264 Improve safety, improve traffic flow, and PL
reduce driver confusion along I-264 WB DN NH 3,000,000
by modifying/reconstructing the I-264 WB RW NH 2,000,000
to I-65 SB loop ramp. (Portion of 5-559.00) UT NH 2,000,000
CN NH 100,000,000
Project Cost: 3,000,000 4,000,000 100,000,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 139
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jefferson 80424 I-264 Improve safety and reduce congestion on PL
I-264 EB and on both ramps from I-65 to DN NH 3,000,000
I-264 EB. (Portion of 5-559.00) RW NH 2,000,000
UT NH 2,000,000
CN NH 100,000,000
Project Cost: 3,000,000 4,000,000 100,000,000 0
Jefferson 80432 I-65 Reconfigure I-65 SB ramps to Arthur PL
Street to improve safety and to improve DN
ingress/egress to/from the University of RW
Louisville campus and adjoining UT
neighborhoods. (MP 133.3 - 133.8)
CN NH 2,330,000
Project Cost: 2,330,000 0 0 0
Jefferson 80433 KY-913 Planning study to extend Blankenbaker PL
Parkway to the Gene Snyder DN SPP 7,050,000
RW SPP 12,430,000
UT SPP 12,760,000
CN SPP 80,940,000
Project Cost: 7,050,000 12,430,000 12,760,000 80,940,000
Jefferson 80436 CS-1524 Improve mobility over the CSX Railroad, PL
construct a new multi-modal structure to DN SPP 600,000
replace existing pedestrian bridge (ID RW SPP 200,000
#056B00343N) on South Preston Street UT SPP 200,000
(CS 1524F) MP 0.13-0.21) (City to
CN SPP 6,000,000
Project Cost: 0 600,000 400,000 6,000,000
Total for Jefferson county PL 1,035,000
DN 88,189,798 5,460,000 7,955,820 8,775,096
RW 15,120,000 92,286,400 3,910,000
UT 6,770,000 37,860,000 87,702,400
CN 343,710,898 69,789,257 454,387,137 1,123,938,510
Total Amounts: 454,825,696 205,395,657 553,955,357 1,132,713,606
140 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jessamine 87.3500 KY-169, COMPLETE EAST NICHOLASVILLE PL
PF-9999, BYPASS WITH AT GRADE INTERSECTION DN
US-27 AT US 27. RW
UT
CN NH 20,000,000
Project Cost: 20,000,000 0 0 0
Jessamine 87.4000 US-27 CONSTRUCT NEW INTERCHANGE AT US PL
27 AND NICHOLASVILLE BYPASS. DN
RW
UT
CN SPP 72,430,000
Project Cost: 0 0 0 72,430,000
Jessamine 430.1000 US-27 NICHOLASVILLE - MAN-O-WAR BLVD; PL
ACCESS MANAGEMENT ON US-27 DN
(NICHOLASVILLE RD) FROM RW SPP 4,400,000
NICHOLASVILLE BYPASS TO JUST UT SPP 1,460,000
SOUTH OF KOHL'S DRIVE.
CN SPP 29,270,000
Project Cost: 4,400,000 1,460,000 29,270,000 0
Jessamine 440 KY-169 IMPROVE KY-169 FROM NORTH OF PL
CLEAR CREEK RD IN JESSAMINE COUNTY DN SPP 910,000
TO NORTH OF KY-1967 IN WOODFORD RW SPP 2,330,000
COUNTY. (2024CCN) UT SPP 2,850,000
CN SPP 13,790,000
Project Cost: 910,000 2,330,000 2,850,000 13,790,000
Jessamine 8404 PF-9999 CONSTRUCT A NEW 4 LANE CONNECTOR PL
BETWEEN US-27 AND I-75. (08CCN) DN STPF 590,000
(12CCR)(16CCR) RW STPF 21,110,000
UT STPF 19,740,000
CN STPF 99,990,000
Project Cost: 590,000 21,110,000 19,740,000 99,990,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 141
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jessamine 8906 KY-169 RECONSTRUCT KY 169 FROM US 68 TO PL
0.54 MILES NORTH OF CLEAR CREEK RD DN STP2 3,720,000
(MP 14.448 TO MP 19.00). (16CCN) RW STP2 6,390,000
(2024CCN) UT STP2 5,850,000
CN STP2 29,220,000
Project Cost: 3,720,000 12,240,000 29,220,000 0
Jessamine 10054 US-68 BRIDGE PROJECT IN MERCER COUNTY ON PL
(084B00003N) US-68 AT KENTUCKY DN FBP2 1,575,000
RIVER RW
UT
CN FBP 10,500,000
FBP2 10,500,000
Project Cost: 12,075,000 0 10,500,000 0
Jessamine 10078 KY-3433 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-3433 OVER BR.JESSAMINE CREEK DN BRZ 129,623
(057B00030N) RW
UT
CN BRZ 864,156
Project Cost: 0 0 0 993,779
Jessamine 80108 KY-169 IMPROVE KY-169 FROM NORTH OF PL
CLEAR CREEK RD IN JESSAMINE COUNTY DN
TO NORTH OF KY-1967 IN WOODFORD RW
COUNTY. (2020CCN) (2024CCR) UT SPP 5,550,000
CN SPP 16,800,000
Project Cost: 5,550,000 16,800,000 0 0
Jessamine 80324 KY-169 IMPROVE SAFETY AND MOBILITY ON PL
NORTH 3RD STREET/KEENE ROAD FROM DN SPP 1,250,000
OAK ST TO US 27 (NICHOLASVILLE RW SPP 3,750,000
BYPASS) IN NICHOLASVILLE (2024CCN) UT SPP 2,750,000
CN SPP 6,500,000
Project Cost: 1,250,000 3,750,000 2,750,000 6,500,000
142 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Jessamine 80325 KY-169 Reconstruct KY 169 (Richmond Ave) from PL
proposed East Nicholasville Byp to US 27X DN SPP 1,250,000
(North Main St). (2024CCN) RW SPP 1,200,000
UT SPP 1,500,000
CN SPP 8,000,000
Project Cost: 1,250,000 1,200,000 1,500,000 8,000,000
Jessamine 80418 US-68 IMPROVE THE SAFETY ON US 68 IN PL
MERCER AND JESSAMINE COUNTIES DN
NEAR THE KY RIVER. (MP 14.45 IN RW STP2 300,000
MERCER COUNTY TO MP 1.38 IN UT STP2 500,000
JESSAMINE COUNTY
CN STP2 10,000,000
Project Cost: 800,000 10,000,000 0 0
Total for Jessamine county PL
DN 9,295,000 129,623
RW 4,700,000 34,780,000
UT 6,050,000 7,310,000 26,840,000
CN 30,500,000 26,800,000 68,990,000 201,574,156
Total Amounts: 50,545,000 68,890,000 95,830,000 201,703,779
Johnson 149 KY-40 IMPROVE ROADWAY GEOMETRICS AND PL
CAPACITY FROM GARBAGE HOLLOW TO DN
EAST OF MILL STREET. (2020CCR) RW SPP 1,500,000
(2022CCR) (2024CCR) UT SPP 1,400,000
CN SPP 7,350,000
Project Cost: 1,500,000 1,400,000 7,350,000 0
Johnson 10102 KY-825 BRIDGE PROJECT IN JOHNSON COUNTY PL
ON (058B00052) KY-825 AT JENNY DN FBP2 218,473
CREEK RW
UT
CN FBP2 1,456,486
Project Cost: 0 1,674,959 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 143
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Johnson 10103 KY-469 BRIDGE PROJECT IN JOHNSON COUNTY PL
ON (058B00054N) KY-469 AT GILLUM DN FBP2 85,022
BRANCH RW
UT
CN FBP2 566,812
Project Cost: 0 651,834 0 0
Johnson 80100 KY-40 IMPROVE ROADWAY GEOMETRICS AND PL
CAPACITY ON KY 40 FROM KY 321 TO DN SPP 910,000
GARBAGE HOLLOW (2020CCN) RW SPP 670,000
(2022CCR) (2024CCR) UT SPP 7,870,000
CN SPP 10,370,000
Project Cost: 910,000 670,000 7,870,000 10,370,000
Johnson 80101 US-460 IMPROVE US 460 FROM THE PL
INTERSECTION WITH KY 114 TO THE DN
INTERCHANGE WITH US 23 (2020CCR) RW
(2022CCR) (2024CCR) UT NH 540,000
CN NH 43,500,000
Project Cost: 540,000 43,500,000 0 0
Johnson 80116 KY-321 ADDRESS CONGESTION AND SAFETY PL
ISSUES ON KY 321 FROM THE 6TH DN SPP 220,000
STREET TO THE JUNCTION OF KY 321 RW SPP 4,920,000
AND KY 40 (2020CCN) (SAME AS UT SPP 2,475,000
12-8102 IN 2020 HIGHWAY PLAN)
CN SPP 29,078,000
Project Cost: 220,000 4,920,000 2,475,000 29,078,000
Total for Johnson county PL
DN 1,130,000 303,495
RW 1,500,000 5,590,000
UT 540,000 1,400,000 10,345,000
CN 45,523,298 7,350,000 39,448,000
Total Amounts: 3,170,000 52,816,793 17,695,000 39,448,000
144 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Kenton 17 I -75 UPGRADE THE EXISTING I-71/75 BRENT PL
SPENCE BRIDGE CORRIDOR AT THE OHIO DN
RIVER BETWEEN COVINGTON, KY AND RW
CINCINNATI, OHIO. (NHPP FUNDING) UT
(02KYD) (2024CCR)
CN NH 44,000,000 78,000,000 100,000,000 133,000,000
Project Cost: 44,000,000 78,000,000 100,000,000 133,000,000
Kenton 392 KY-371 CONSTRUCTION OF ROADWAY SAFETY PL
IMPROVEMENTS ON KY 371 AT DN
CHAMBERS OFFICE PARK AND RW SPP 530,000
BUTTERMILK SQUARE IN KENTON UT SPP 210,000
COUNTY, KENTUCKY. (2024BOP)
CN SPP 1,200,000
Project Cost: 530,000 210,000 1,200,000 0
Kenton 449 KY-17 IMPROVE SAFETY AND REDUCE PL
CONGESTION ON KY-17 AT THE I-275 DN
INTERCHANGE. (18CCR) (2020CCR) RW
(2024CCR) UT
CN STPF 11,340,000
Project Cost: 0 0 11,340,000 0
Kenton 450.1000 KY-1303 Reduce Congestion along KY 1303 from PL
Dudley Road to I-275. (2024BOP) DN
RW
UT
CN STPF 6,000,000 6,000,000
Project Cost: 0 6,000,000 6,000,000 0
Kenton 450.2000 KY-1303 Reduce Congestion along KY 1303 from PL
I-275 to US 25. (2024BOP) DN
RW SPP 1,100,000
UT SPP 540,000
CN SPP 2,320,000
Project Cost: 1,100,000 540,000 2,320,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 145
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Kenton 1070 CS-2097 WEST 15TH STREET; ADDRESS PL
DEFICIENCIES OF BRIDGE AND DN BRX 667,653
APPROACHES OVER CSX RR IN RW BRX 200,000
COVINGTON (FUNDS TO BE PROVIDED UT BRX 400,000
BY THE CITY AS PER MEMORANDUM OF
CN BRX 4,451,018
Project Cost: 0 0 5,718,671 0
Kenton 8951 US-25 IMPROVE EXISTING ALIGNMENT WITH PL
BUTTERMILK PIKE, ORPHANAGE ROAD, DN
AND US 25. FT. MITCHELL WILL PAY RW STPF 13,900,000
$50,000 TOWARD DESIGN. (16CCN) UT STPF 2,500,000
(18CCN) (2020CCR) (2022CCR)
CN STPF 6,000,000
Project Cost: 13,900,000 2,500,000 6,000,000 0
Kenton 10045 I -75 BRIDGE PROJECT IN KENTON COUNTY ON PL
(059B00090N) I-75 RAMP AT 9TH DN BRO 587,194
ST-COVINGTON RW
UT
CN BRO 3,914,629
Project Cost: 0 0 0 4,501,823
Kenton 10067 I -75 ADDRESS DEFICIENCIES OF BRIDGE ON PL
I-75 OVER OHIO RIVER (059B00046N) DN BRO 150,000
RW
UT
CN BRO 1,000,000
Project Cost: 0 0 0 1,150,000
Kenton 20044 KY-236 ADDRESS CONDITION OF KY-236 FROM PL
MILEPOINT 2.13 TO MILEPOINT 2.62 DN STP5 48,000
RW
UT
CN STP5 552,000
Project Cost: 48,000 552,000 0 0
146 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Kenton 20045 KY-1072 ADDRESS CONDITION OF KY-1072 FROM PL
MILEPOINT 2.49 TO MILEPOINT 2.83 DN STP3 40,000
RW
UT
CN STP3 460,000
Project Cost: 0 500,000 0 0
Kenton 20064 I -75 ADDRESS CONDITION OF I-075 PL
NON-CARDINAL DIRECTION FROM DN NHPM 70,000
MILEPOINT 190.7 TO MILEPOINT 191.22 RW
UT
CN NHPM 700,000
Project Cost: 0 770,000 0 0
Kenton 22129 I -75 ADDRESS CONDITION OF I-075 FROM PL
MILEPOINT 183.312 TO MILEPOINT DN STP5 420,000
184.708 RW
UT
CN STP5 4,255,000
Project Cost: 0 0 4,675,000 0
Kenton 22131 I -75 ADDRESS CONDITION OF I-075 FROM PL
MILEPOINT 186.95 TO MILEPOINT 190.7 DN NHPM 3,750,000
RW
UT
CN NHPM 37,500,000
Project Cost: 0 0 41,250,000 0
Kenton 80002 KY-236 RECONSTRUCT KY 236 (STEVENSON PL
ROAD) FROM ALICE STREET TO DN
JACQUELINE DRIVE.(18CCN) (2020CCR) RW
Kenton Co. government will allocate UT SPP 5,500,000
$250,000 to sanitary sewer and waterline
CN SPP 20,000,000
Project Cost: 5,500,000 20,000,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 147
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Kenton 80105 KY-2373 WIDEN KENTON LANDS ROAD FROM US PL
25 TO RIGGS ROAD (2020CCN) DN NH 3,360,000
(2022CCR) (2024CCR) RW NH 18,600,000
UT NH 5,600,000
CN NH 30,000,000
Project Cost: 3,360,000 18,600,000 5,600,000 30,000,000
Kenton 80203.1000KY-536 Reconstruct KY 536 from KY 16 to PL
Staffordsburg Road. (2024BOP) DN
RW
UT STP2 5,600,000
CN STP2 18,000,000
Project Cost: 5,600,000 18,000,000 0 0
Kenton 80203.2000KY-536 Reconstruct KY 536 from Staffordsburg PL
Road to KY 177. (2024BOP) DN
RW STP2 15,530,000
UT STP2 6,160,000
CN SPP 60,000,000
Project Cost: 15,530,000 6,160,000 60,000,000 0
Kenton 80217 KY-536 Provide connectivity, improve mobility, and PL
reduce congestion along KY 536 from KY DN
17 to KY 16; include multi-modes. RW SPP 6,830,000
(2022CCN) (2024CCR) UT SPP 1,560,000
CN SPP 34,800,000
Project Cost: 8,390,000 34,800,000 0 0
Kenton 80254 US-25 REHABILITATE/RECONSTRUCT US 25 PL
FROM BUTTERMILK PIKE (KY371) TO I-75 DN
(MP 8.58 TO MP 9.86) (2022CCN) RW
(2024CCR) UT
CN SPP 11,600,000
Project Cost: 0 0 11,600,000 0
148 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Kenton 80300 KY-16 IMPROVE SAFETY AND REDUCE PL
CONGESTION ALONG KY 16 (TAYLOR DN SPP 5,400,000
MILL RD) FROM KY 2047 (SENOUR RD) RW SPP 24,000,000
TO KY 536 (HARRIS PIKE); INCLUDE UT SPP 3,480,000
MULTIMODAL NEEDS. (2024CCN)
CN SPP 60,000,000
Project Cost: 5,400,000 27,480,000 0 60,000,000
Kenton 80305.1000KY-2373 Address safety and mobility along KY PL
2373 from west intersection of DN SPP 1,300,000
Amsterdam Road to east intersection of RW SPP 2,200,000
Amsterdam Road. (2024BOP) UT SPP 1,620,000
CN SPP 6,960,000
Project Cost: 1,300,000 2,200,000 1,620,000 6,960,000
Kenton 80305.2000KY-2373 Address safety and mobility along KY 273 PL
from east intersection of Amsterdam Road DN SPP 2,600,000
to Hightower Road. (2024BOP) RW SPP 5,500,000
UT SPP 2,160,000
CN SPP 13,920,000
Project Cost: 2,600,000 5,500,000 2,160,000 13,920,000
Kenton 80307 KY-1501 ADDRESS SAFETY AND GEOMETRIC PL
DEFICIENCIES ALONG KY 1501 (HANDS DN SPP 970,000
PIKE) FROM EDWIN DRIVE TO KY 16. RW SPP 2,600,000
(2024CCN) UT SPP 930,000
CN SPP 10,540,000
Project Cost: 970,000 2,600,000 930,000 10,540,000
Kenton 80308 KY-1501 ADDRESS SAFETY AND GEOMETRIC PL
DEFICIENCIES ALONG KY 1501 (HANDS DN SPP 1,380,000
PIKE) FROM OTTER TO EDWIN DRIVES. RW SPP 4,200,000
(2024CCN) UT SPP 1,320,000
CN SPP 9,900,000
Project Cost: 1,380,000 4,200,000 1,320,000 9,900,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 149
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Kenton 80309 I -75 RECONSTRUCT I-75 INTERCHANGE AT KY PL
236 (DONALDSON HIGHWAY). DN NH 3,240,000
(2024CCN) RW NH 10,800,000
UT NH 3,480,000
CN NH 23,560,000
Project Cost: 3,240,000 10,800,000 3,480,000 23,560,000
Kenton 80400 I-75 Construct new DCD interchange on I-75 in PL
Kenton County at Buttermilk Pike (KY 371) DN
RW NH 6,000,000
UT NH 3,500,000
CN NH 70,000,000
Project Cost: 0 6,000,000 3,500,000 70,000,000
Kenton 80418 KY-536 Provide connectivity, improve mobility and PL
reduce congestion along KY 536 from KY DN SPP 12,500,000
177 in Kenton County to KY 1936 in RW SPP 2,500,000
Campbell County, providing a new UT SPP 3,000,000
crossing over the RR and Licking River.
CN SPP 78,000,000
Project Cost: 0 12,500,000 5,500,000 78,000,000
Total for Kenton county PL
DN 18,298,000 12,610,000 4,837,653 737,194
RW 37,890,000 73,900,000 2,700,000
UT 12,660,000 12,890,000 22,010,000
CN 44,000,000 158,512,000 244,666,018 440,794,629
Total Amounts: 112,848,000 257,912,000 274,213,671 441,531,823
Knott 158 KY-80 Eliminate rockfall hazards from KY 2029 to PL
Rock Fork Road. DN
RW
UT
CN PROT 6,090,000
Project Cost: 6,090,000 0 0 0
150 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Knott 10104 KY-1088 BRIDGE PROJECT IN KNOTT COUNTY ON PL
(060B00025N) KY-1088 AT YELLOW DN BRX 160,984
CREEK RW
UT
CN BRX 1,073,226
Project Cost: 0 1,234,210 0 0
Knott 10106 KY-1091 BRIDGE PROJECT IN KNOTT COUNTY ON PL
(060B00046N) KY-1091 AT RT FRK DN FBP2 302,039
BEAVER CREEK RW FBP2 75,000
UT FBP2 130,000
CN FBP2 2,013,592
Project Cost: 0 0 2,520,631 0
Knott 10107 KY-1102 BRIDGE PROJECT IN KNOTT COUNTY ON PL
(060B00059N) KY-1102 AT DN FBP 133,805
MONTGOMERY CREEK RW
UT
CN FBP 892,032
Project Cost: 0 0 1,025,837 0
Knott 10108 CR-1141 BRIDGE PROJECT IN KNOTT COUNTY ON PL
(060C00032N) BIG DOUBLES BR AT DN FBP 73,697
LITTLE CARR FORK RW
UT
CN FBP 491,314
Project Cost: 0 0 565,011 0
Knott 10148 KY-15 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY 15 OVER Carr Fork Lake DN BRO 110,550
(060B00056N) RW
UT
CN BRO 1,105,500
Project Cost: 0 0 0 1,216,050
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 151
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Knott 20011 HR-9006 ADDRESS CONDITION OF HAL ROGERS PL
PARKWAY FROM MILEPOINT 72.184 TO DN STP4 60,000
MILEPOINT 75.113. RW
UT
CN STP4 1,100,000
Project Cost: 60,000 1,100,000 0 0
Knott 20012 HR-9006 ADDRESS CONDITION OF HAL ROGERS PL
PARKWAY FROM MILEPOINT 80.340 TO DN STP4 60,000
MILEPOINT 83.166. RW
UT
CN STP4 1,150,000
Project Cost: 60,000 1,150,000 0 0
Knott 80301 KY-80 Eliminate rockfall hazards 0.2 mile west of PL
Intersection of KY 1087 & KY 80. DN SPP 540,000
(2024CCN) RW SPP 180,000
UT SPP 730,000
CN SPP 14,970,000
Project Cost: 540,000 180,000 730,000 14,970,000
Knott 80302 KY-899 Improve roadway geometrics along KY PL
899 from end of prior construction near DN
Pippa Passes to the bottom of the hill at RW SPP 350,000
Short Branch. (2024CCN) UT SPP 380,000
CN SPP 5,159,000
Project Cost: 730,000 5,159,000 0 0
Knott 80303 KY-15 Improvements to the visibility at the PL
intersection of KY 15 and KY 1231 (Big DN SPP 40,000
Branch Rd.) around Carr Fork Lake. RW
(2024CCN) UT SPP 100,000
CN SPP 100,000
Project Cost: 40,000 100,000 100,000 0
152 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Knott 80304 KY-160 Address safety, congestion, and PL
geometrics from KY 899 to KY 3391. DN SPP 1,190,000
(2024CCN) RW
UT
CN
Project Cost: 1,190,000 0 0 0
Knott 80305 KY-1087 Curve revision 3.654 miles east of PL
intersection of KY 3209 & KY 1087. DN SPP 240,000
(2024CCN) RW SPP 240,000
UT SPP 120,000
CN SPP 1,125,000
Project Cost: 240,000 240,000 120,000 1,125,000
Knott 80350 KY-1098 Improve horizontal and vertical roadway PL
geometry to eliminate the substandard DN SPP 420,000
curve and increase sight distance on KY RW SPP 100,000
1098 (MP 10.5-11.0) (2024CCN) UT SPP 100,000
CN SPP 2,000,000
Project Cost: 420,000 100,000 100,000 2,000,000
Knott 80354 HR-9006 Eliminate rockfall hazards along Hal PL
Rogers Parkway (old KY-80) from MP DN SPP 500,000
78.27 to 79.59. (2024CCN) RW SPP 150,000
UT SPP 650,000
CN SPP 12,900,000
Project Cost: 500,000 800,000 0 12,900,000
Knott 80401 KY-80 Eliminate rockfall hazards from MP 5.0 to PL
5.5. DN SPP 710,000
RW SPP 310,000
UT SPP 300,000
CN SPP 7,100,000
Project Cost: 710,000 310,000 300,000 7,100,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 153
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Knott 80402 KY-15 Eliminate rockfall hazards on KY 15 from PL
MP 4.0 to 4.3 near Carr Fork Lake. DN SPP 1,100,000
RW SPP 215,000
UT SPP 100,000
CN SPP 9,100,000
Project Cost: 1,100,000 215,000 100,000 9,100,000
Total for Knott county PL
DN 4,860,000 160,984 509,541 110,550
RW 350,000 1,195,000 75,000
UT 380,000 750,000 1,480,000
CN 6,090,000 8,482,226 3,496,938 48,300,500
Total Amounts: 11,680,000 10,588,210 5,561,479 48,411,050
Knox 182 KY-312 Drainage Improvements along KY 312 PL
(Master Street) from MP 0 to MP 0.90 in DN
Know County at Corbin, Kentucky. RW STP1 750,000
(2022BOP) (2024CCN) UT STP1 1,000,000
CN STP1 4,160,000
Project Cost: 750,000 1,000,000 4,160,000 0
Knox 10201 KY-223 BRIDGE PROJECT IN KNOX COUNTY ON PL
(061B00056N) KY-223 AT ROAD FK DN BRX 168,705
STINKING CREEK RW
UT
CN BRX 1,124,700
Project Cost: 0 0 0 1,293,405
Knox 10204 KY-3436 BRIDGE PROJECT IN KNOX COUNTY ON PL
(061B00093N) KY-3436 AT E.FK.LYNN DN BRX 152,956
CAMP CK RW
UT
CN BRX 1,019,710
Project Cost: 0 0 1,172,666 0
154 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Knox 80156 KY-830 IMPROVE SAFETY AND ADDRESS PL
GEOMETRIC DEFICIENCIES ALONG N KY DN
830 FROM US 25E TO KY 1629 RW SPP 350,000
INCLUDING WIDENING AND NEW TURNING UT SPP 1,250,000
LANES (2020CCN) (2024CCR)
CN SPP 2,080,000
Project Cost: 1,600,000 2,080,000 0 0
Knox 80203 KY-11 Improve safety and access along KY 11 PL
by raising roadway above Flood X DN
elevation. (2022CCN) (2024CCR) RW
UT PROT 1,400,000
CN PROT 4,890,000
Project Cost: 1,400,000 4,890,000 0 0
Knox 80301 US-25 Construct a left turn lane with 350' PL
storage and 100' taper at MP 18.62 DN
(2024CCN) RW
UT
CN NH 70,000
Project Cost: 70,000 0 0 0
Knox 80302 US-25 Construct one left turn lane with 350' PL
storage and 100' taper at MP 19.85 DN
(2024CCN) RW
UT
CN NH 70,000
Project Cost: 70,000 0 0 0
Knox 80304 US-25 Construct one left turn lane with 350' PL
storage and 100' taper at MP 18.41 and DN
350' storage and 100' taper at US 25 E RW
(2024CCN) UT
CN NH 80,000
Project Cost: 80,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 155
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Knox 80311 CR-1311 Widen Richland Creek Road from US 25E a PL
distance of 0.70 miles (2024CCN) DN SPP 780,000
RW SPP 250,000
UT SPP 1,500,000
CN SPP 2,000,000
Project Cost: 780,000 250,000 1,500,000 2,000,000
Knox 80361 PF-9999 Construct a new route north off of CS PL
2054 (Opportunity Drive) along the former DN
RR track bed approximately 0.7 miles to RW
KY 830 (2024CCN) UT
CN SPP 1,400,000
Project Cost: 1,400,000 0 0 0
Knox 80404 CR-1064 Improve safety by realigning intersection PL
and replacing existing bridge DN SPP 200,000
RW SPP 100,000
UT SPP 150,000
CN SPP 1,500,000
Project Cost: 200,000 250,000 1,500,000 0
Total for Knox county PL
DN 980,000 152,956 168,705
RW 1,100,000 350,000
UT 2,650,000 1,150,000 1,500,000
CN 1,620,000 6,970,000 6,679,710 3,124,700
Total Amounts: 6,350,000 8,470,000 8,332,666 3,293,405
Larue 8909 KY-84 ADDRESS SAFETY AND GEOMETRIC PL
DEFICIENCIES ALONG KY 84 FROM KY DN
357 TO KY 61 (LINCOLN PARKWAY) RW SPP 790,000
NEAR HODGENVILLE (2020CCR) UT SPP 1,350,000
(2022CCR) (2024CCR)
CN SPP 7,840,000
Project Cost: 0 2,140,000 0 7,840,000
156 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Larue 80154.1000KY-210 ADDRESS SAFETY ON KY 210 FROM KY PL
1618 (6.994) TO MORNINGSTAR ROAD DN
(MP14.230) IN LARUE COUNTY. RW SPP 1,250,000
(2024CCN) UT SPP 2,000,000
CN SPP 20,000,000
Project Cost: 0 0 3,250,000 20,000,000
Larue 80258 KY-61 ADDRESS SAFETY AND GEOMETRIC PL
DEFICIENCIES ALONG KY 61 FROM NEAR DN SPP 1,120,000
SOUTH L AND N TPKE (KY 470)(MP RW SPP 1,880,000
5.152) TO THE INTERSECTION OF UT
LINCOLN FARM RD (US 31E)(MP 8.031)
CN
Project Cost: 1,120,000 0 1,880,000 0
Total for Larue county PL
DN 1,120,000
RW 790,000 3,130,000
UT 1,350,000 2,000,000
CN 27,840,000
Total Amounts: 1,120,000 2,140,000 5,130,000 27,840,000
Laurel 169 CO-0 Improve Rudy Bear Road and KY 3007 PL
from KY 80 South to KY 3432 West of DN
I-75. (2022CCR) (2024CCR) RW
UT
CN SPP 7,600,000
Project Cost: 0 0 7,600,000 0
Laurel 8515 US-25 IMPROVE CONNECTIVITY BETWEEN PL
CORBIN AND LONDON FROM KY-1006 TO DN
US-25E. (08CCN) (2024CCR) RW STP1 14,800,000
UT STP1 5,560,000 9,000,000
CN STP1 6,000,000
Project Cost: 14,800,000 5,560,000 9,000,000 6,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 157
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Laurel 8811 CR-1221 REPLACE BRIDGE LOCATED ON LILY PL
ROAD (CR 1221) (MP 1.045) (AREA DN
ADJACENT TO FARISTON INDUSTRIAL RW
PARK WITH NEW ROADWAY UT
ALIGNMENT). (14CCN)(18CCN)
CN SPP 1,830,000
Project Cost: 1,830,000 0 0 0
Laurel 8909 HR-9006 IMPROVE THE HAL ROGERS PARKWAY PL
TO INTERSTATE STANDARDS FROM 4.0 DN
MI EAST OF KY 192 TO LAUREL/CLAY RW NH 2,680,000
CO. LINE. (I-75 TO HAZARD) (16CCN) UT NH 1,170,000
(18CCR) (2024CCR)
CN SPP 32,850,000
Project Cost: 0 3,850,000 0 32,850,000
Laurel 10209 KY-472 BRIDGE PROJECT IN LAUREL COUNTY ON PL
(063B00062N) KY-472 AT DN BRX 219,810
S.FK.ROCKCASTLE RVR RW
UT
CN BRX 1,465,399
Project Cost: 0 0 0 1,685,209
Laurel 10211 KY-552 BRIDGE PROJECT IN LAUREL COUNTY ON PL
(063B00101N) KY-552 AT LITTLE LAUREL DN BRZ 121,611
RIVER RW
UT
CN BRZ 810,738
Project Cost: 0 0 932,349 0
Laurel 20038 KY-192 ADDRESS CONDITION OF KY-192 FROM PL
MILEPOINT 20.2 TO MILEPOINT 22.041 DN STP4 440,000
RW
UT
CN STP4 5,060,000
Project Cost: 5,500,000 0 0 0
158 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Laurel 22196 HR-9006 ADDRESS CONDITION OF Hal Rogers PL
Daniel Boone Parkway FROM MILEPOINT DN STP4 290,000
4.169 TO MILEPOINT 8.8 RW
UT
CN STP4 2,921,514
Project Cost: 0 0 0 3,211,514
Laurel 80154 HR-9006 ADDRESS ACCESS AND SAFETY ISSUES PL
AT THE INTERSECTION OF KY 80 AND DN
PAYNE TRAIL AND BUSH ELEMENTARY RW SPP 890,000
SCHOOL BY CONSTRUCTING A UT SPP 40,000
CONNECTOR ROAD FROM HAL ROGERS
CN SPP 630,000
Project Cost: 890,000 40,000 630,000 0
Laurel 80312 KY-638 Improve the geometrics of a curve, widen PL
a drainage structure, and provide turn DN
lanes to Johnson Elementary School on RW SPP 1,060,000
KY 638 (2024CCN) UT SPP 710,000
CN SPP 2,270,000
Project Cost: 1,770,000 2,270,000 0 0
Laurel 80357 KY-192 Widen KY 192 from Mallard Drive to PL
Esquire Lane, address horizontal and DN
vertical alignment as needed (MP 16.61 - RW SPP 7,000,000
18.08) (2024CCN) UT SPP 1,750,000
CN SPP 9,000,000
Project Cost: 0 7,000,000 1,750,000 9,000,000
Laurel 80402 KY-1535 Reconstruct curve and address geometric PL
deficiencies and safety on KY-1535 DN
RW
UT
CN SPP 1,250,000
Project Cost: 1,250,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 159
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Laurel 80403 KY-3006 New construction to extend KY 3006 from PL
16th Street to the intersection of KY 1006 DN SPP 1,500,000
and Myers Baker Road RW SPP 5,000,000
UT SPP 4,000,000
CN SPP 17,500,000
Project Cost: 1,500,000 9,000,000 17,500,000 0
Laurel 80409 US-25 Widen US25 to a three-lane typical section PL
with a center two-way left-turn lane. DN STP1 1,050,000
Access management with sidewalk. RW STP1 3,150,000
Concept A from the 11-181 planning study UT STP1 1,050,000
CN STP1 10,000,000
Project Cost: 1,050,000 4,200,000 10,000,000 0
Laurel 80426 KY-363 Reconstruct and address geometric PL
deficiencies and safety on KY 363 DN
(Whitley Street) from KY 2391 to Meyers RW SPP 3,500,000
Baker Road. UT SPP 2,750,000
CN SPP 3,500,000
Project Cost: 6,250,000 3,500,000 0 0
Total for Laurel county PL
DN 2,990,000 121,611 509,810
RW 20,250,000 17,830,000
UT 3,460,000 11,820,000 10,750,000
CN 8,140,000 5,770,000 36,540,738 52,236,913
Total Amounts: 34,840,000 35,420,000 47,412,349 52,746,723
Lawrence 156 KY-32 Improve KY-32 from Elliott C/L to Yatesville PL
Lake reconstruction section for better DN
access to Yatesville Lake and to improve RW SPP 3,190,000
safety. See Elliott County listing for UT SPP 1,830,000
continuation of project to KY-7 @ Sandy
CN SPP 5,920,000
Project Cost: 5,020,000 5,920,000 0 0
160 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Lawrence 10111 KY-32 BRIDGE PROJECT IN LAWRENCE COUNTY PL
ON (064B00018N) KY-32 AT HOOD DN BRX 408,579
CREEK RW
UT
CN BRX 2,723,861
Project Cost: 0 0 3,132,440 0
Lawrence 10112 KY-32 BRIDGE PROJECT IN LAWRENCE COUNTY PL
ON (064B00019N) KY-32 AT BLAINE DN FBP2 654,029
CREEK RW
UT
CN FBP2 4,360,196
Project Cost: 5,014,225 0 0 0
Lawrence 10157 CR-1149 ADDRESS DEFICIENCIES OF BRIDGE ON PL
Mill Creek Hollow OVER Rockcastle Creek DN BRZ 138,338
(064C00078N) RW
UT
CN BRZ 922,254
Project Cost: 0 0 0 1,060,592
Lawrence 80103 KY-201 REPAVE KY 201 FROM MP 5.0 TO 10.9 PL
(2020CCN) DN
RW
UT
CN STP4 675,000
Project Cost: 675,000 0 0 0
Lawrence 80104 KY-32 REPAVE KY 32 FROM MP 21.0 TO 23.0 PL
(2020CCN) DN
RW
UT
CN STP4 340,000
Project Cost: 340,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 161
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Lawrence 80105 KY-3 REPAVE ROUTE 3 SOUTH FROM MP 12.58 PL
TO MP 0 AND PLACE GUARD RAILS ON DN
FALLS HILL (2020CCN) (2022CCR) RW
UT
CN SPP 1,700,000
Project Cost: 1,700,000 0 0 0
Lawrence 80107 KY-1690 REPAVE KY 1690 FROM MP 4.3 TO MP 6.3 PL
AND PLACE GUARD RAILS ON DN
RICHARDSON HILL (2020CCN) RW
UT
CN SPP 200,000
Project Cost: 200,000 0 0 0
Lawrence 80108 KY-644 PLACE LIGHTING AT INTERSECTION OF PL
KY 644 AND KY 2565 (2020CCN) DN SPP 30,000
(2024CCN) RW
UT SPP 20,000
CN SPP 200,000
Project Cost: 30,000 20,000 200,000 0
Lawrence 80302 KY-3398 Improve/widen KY-3398 from KY-3 @ PL
Fallsburg to US-23 @ Fullers to improve DN SPP 800,000
safety and to accommodate residential RW SPP 1,300,000
growth and recreational vehicles in this UT SPP 1,750,000
area. (2024CCN)
CN SPP 11,350,000
Project Cost: 800,000 1,300,000 1,750,000 11,350,000
Lawrence 80306 KY-1 Improve KY-1 from the Johnson C/L to PL
KY-3 to eliminate dangerous curves and DN SPP 1,000,000
address safety. (2024CCN) RW SPP 13,650,000
UT SPP 3,240,000
CN SPP 85,120,000
Project Cost: 1,000,000 16,890,000 0 85,120,000
162 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Lawrence 80307 KY-201 Correct substandard roadway geometrics PL
and address safety issues on DN SPP 7,280,000
KY-201/KY-32 from Johnson C/L to KY-1 RW SPP 12,600,000
for safety. (2024CCN) UT SPP 6,480,000
CN SPP 84,000,000
Project Cost: 7,280,000 12,600,000 6,480,000 84,000,000
Lawrence 80310 KY-3398 IMPROVE/WIDEN KY-3398 FROM KY-3 @ PL
FALLSBURG TO US-23 @ FULLERS TO DN SPP 840,000
IMPROVE SAFETY AND TO RW SPP 1,430,000
ACCOMMODATE RESIDENTIAL GROWTH UT
AND RECREATIONAL VEHICLES IN THIS
CN
Project Cost: 840,000 1,430,000 0 0
Lawrence 80400 KY-2565 Improve intersection traffic movements PL
along KY 2565 and KY 32 between US 23 DN
and Louisa RW SPP 300,000
UT SPP 150,000
CN SPP 2,000,000
Project Cost: 0 450,000 2,000,000 0
Lawrence 80409 CR-1063 Improve roadway geometry and visibility PL
on Town Hill road between Old KY 32 and DN SPP 800,000
KY 3. (MP 0.117 - 0.596) RW SPP 800,000
UT SPP 1,000,000
CN SPP 4,000,000
Project Cost: 0 800,000 1,800,000 4,000,000
Lawrence 80410 ky-3395 Improve roadway geometry and sight PL
distance on KY 3395 between US 23 and DN SPP 900,000
KY 32. (MP 0 - 1.658) RW SPP 2,080,000
UT SPP 2,500,000
CN SPP 5,900,000
Project Cost: 0 900,000 4,580,000 5,900,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 163
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Lawrence 80411 KY-1185 To upgrade the access to the marina from PL
KY 3 in order to better accommodate DN SPP 1,100,000
recreational traffic using the road. KY RW SPP 2,500,000
1185 MP 0.00 to 2.232 at Yatesville Lake UT SPP 2,420,000
CN SPP 10,800,000
Project Cost: 0 1,100,000 2,500,000 13,220,000
Total for Lawrence county PL
DN 10,604,029 2,800,000 408,579 138,338
RW 3,190,000 29,280,000 5,380,000
UT 1,830,000 3,410,000 11,730,000 2,420,000
CN 7,275,196 5,920,000 4,923,861 202,092,254
Total Amounts: 22,899,225 41,410,000 22,442,440 204,650,592
Lee 292.4000 KY-52 I-75 TO MOUNTAIN PARKWAY; PL
RECONSTRUCT KY-11 FROM 0.5 MILE DN
SOUTH OF KY-587 TO 0.65 MILE NORTH RW STP2 6,000,000
OF KY-52 IN BEATTYVILLE AND UT STP2 2,000,000
CONSTRUCT BRIDGE OVER KENTUCKY
CN STP2 30,000,000
Project Cost: 6,000,000 2,000,000 30,000,000 0
Lee 5017 KY-52 Rockfall Mitigation on KY 52 near PL
Beattyville from MP 12.8 to MP 13.4 in Lee DN
County. (To seek future federal Protect RW
funds) UT
CN PROT 18,750,000
Project Cost: 18,750,000 0 0 0
Lee 80104 KY-399 RECONSTRUCT ALONG KY 399 BETWEEN PL
MP 5.75 AND 6.2 (2020CCN) (2022CCR) DN
RW SPP 220,000
UT SPP 110,000
CN
Project Cost: 220,000 110,000 0 0
164 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Lee 80351 KY-11 Reconstruct KY 11 from 0.5 miles south of PL
KY 587 to 0.65 miles north of KY 52 in DN
Beattyville (MP 1.082 - 4.798) (2024CCN) RW STPF 5,750,000
UT STPF 2,320,000
CN STPF 24,000,000
Project Cost: 0 5,750,000 2,320,000 24,000,000
Total for Lee county PL
DN
RW 6,220,000 5,750,000
UT 2,110,000 2,320,000
CN 18,750,000 30,000,000 24,000,000
Total Amounts: 24,970,000 7,860,000 32,320,000 24,000,000
Leslie 1095 US-421 ADDRESS DEFICIENCIES OF BRIDGE PL
OVER MUNCY CREEK ON US 421 0.5 MILE DN
SOUTH OF TAYLOR MORGAN ROAD (CR RW
1090).(066B00006N) UT
CN BRX 1,350,000
Project Cost: 0 0 0 1,350,000
Leslie 8516 KY-1482 CONSTRUCT A NEW APPROACH FROM PL
KY-1482 ONTO THE HAL ROGERS DN SPP 320,000
PARKWAY AT MP 39. (08CCN)(10CCR) RW SPP 1,230,000
(2011BOPP)(18CCN) (2020CCR) UT SPP 520,000
(2022CCR) (2024CCR)
CN SPP 7,410,000
Project Cost: 320,000 1,750,000 7,410,000 0
Leslie 8912 HR-9006 UPGRADE ROUTE FROM SOMERSET TO PL
HAZARD TO INTERSTATE STANDARDS: 4 DN NH 1,120,000
LANE FROM CLAY/LESLIE LINE TO RW NH 12,600,000
HYDEN SPUR, MP 35.929 TO MP 44.188 UT NH 9,360,000
(SEGMENT 9). (16CCN)(18CCN)
CN NH 30,000,000 30,000,000 34,400,000
Project Cost: 23,080,000 30,000,000 30,000,000 34,400,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 165
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Leslie 8913 HR-9006 UPGRADE ROUTE FROM SOMERSET TO PL
HAZARD TO INTERSTATE STANDARDS: 4 DN NH 1,120,000
LANE FROM HYDEN SPUR TO RW SPP 10,500,000
LESLIE/PERRY LINE (SEGMENT 10). UT SPP 7,280,000
(16CCN)(18CCN) (2024CCR)
CN SPP 73,920,000
Project Cost: 0 1,120,000 0 91,700,000
Leslie 8951 US-421 CONSTRUCT RIGHT TURN LANE ON US PL
421 AT INTERSECTION WITH KY 80. DN
(16CCN)(18CCN) (2022CCR) RW SPP 140,000
UT SPP 310,000
CN SPP 1,360,000
Project Cost: 450,000 1,360,000 0 0
Leslie 10212 KY-2058 BRIDGE PROJECT IN LESLIE COUNTY ON PL
(066B00028N) KY-2058 AT BEECH FORK DN BRX 145,478
CREEK RW
UT
CN BRX 969,851
Project Cost: 0 0 0 1,115,329
Leslie 10213 KY-699 BRIDGE PROJECT IN LESLIE COUNTY ON PL
(066B00033N) KY-699 AT CUTSHIN DN FBP 25,208
CREEK RW
UT
CN FBP 168,056
Project Cost: 0 0 0 193,264
Leslie 10215 KY-1482 BRIDGE PROJECT IN LESLIE COUNTY ON PL
(066B00058N) KY-1482 AT HALS FORK DN BRX 206,793
RW
UT
CN BRX 1,378,620
Project Cost: 0 0 1,585,413 0
166 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Leslie 10256 CR-1353 ADDRESS DEFICIENCIES OF BRIDGE ON PL
CR-1353 OVER Middle Fork Kentucky Rv DN BRZ 146,773
(066C00117N) RW
UT
CN BRZ 978,489
Project Cost: 1,125,262 0 0 0
Leslie 22201 HR-9006 ADDRESS CONDITION OF Hal Rogers PL
Daniel Boone Parkway FROM MILEPOINT DN NHPM 600,000
35.929 TO MILEPOINT 44.04 RW
UT
CN NHPM 6,024,768
Project Cost: 6,624,768 0 0 0
Leslie 22202 HR-9006 ADDRESS CONDITION OF Hal Rogers PL
Daniel Boone Parkway FROM MILEPOINT DN NHPM 500,000
44.04 TO MILEPOINT 51.026 RW
UT
CN NHPM 4,957,826
Project Cost: 0 0 5,457,826 0
Leslie 80412 CR-1449 Widen, resurface, and extend asphalt on PL
CR-1449 (Leeco Road) in preparation for DN
development of an RV park, pavilion, RW SPP 300,000
baseball/softball fields, housing UT SPP 200,000
development, and trails along the route
CN SPP 3,000,000
Project Cost: 300,000 200,000 3,000,000 0
Total for Leslie county PL
DN 2,186,773 1,120,000 706,793 170,686
RW 13,040,000 1,230,000 10,500,000
UT 9,670,000 720,000 7,280,000
CN 7,003,257 31,360,000 46,746,446 110,807,907
Total Amounts: 31,900,030 34,430,000 47,453,239 128,758,593
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 167
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Letcher 199.1500 US-119 IMPROVE US-119 FROM PL
KY-2034/COUGAR DRIVE TO BRASS DN
DRIVE (MP 16.731 TO 17.740). THROUGH RW
MAYKING (MP 19.925 TO 20.6) AND UT
AUXILIARY LANE (MP 22.0 TO 22.75)
CN NH 7,400,000
Project Cost: 7,400,000 0 0 0
Letcher 199.5000 US-119 RECONSTRUCT US-119 BY WIDENING TO PL
4-LANES ALONG A NEW ALIGNMENT DN
THROUGH THE GATEWAY INDUSTRIAL RW NH 3,000,000
PARK TO US-23.(16CCN) (2024CCR) UT NH 3,000,000
CN SPP 41,040,000
Project Cost: 6,000,000 0 41,040,000 0
Letcher 311.8000 PF-9999, RECONSTRUCTION OF US-119 FROM 0.15 PL
US-119 MILE WEST OF KY-806 TO KY-932. DN
2012BOP (2024CCN) RW
UT
CN APD 46,000,000 47,190,000
Project Cost: 46,000,000 47,190,000 0 0
Letcher 8702.1000 KY-805 IMPROVE THE EXISTING ROADWAY TO PL
MEET CURRENT STANDARDS AND DN SPP 250,000
IMPROVE CONGESTION INTO AND OUT RW SPP 2,090,000
OF JENKINS BETWEEN MP 8.554 AND MP UT SPP 530,000
9.176. (2024CCN)
CN SPP 7,430,000
Project Cost: 250,000 2,620,000 7,430,000 0
Letcher 10121 KY-803 BRIDGE PROJECT IN LETCHER COUNTY PL
ON (067B00091N) KY-803 AT MILLSTONE DN FBP2 115,685
CREEK RW
UT
CN FBP2 771,236
Project Cost: 0 0 0 886,921
168 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Letcher 80114 KY-3401 INSTALL A LEFT TURN AT INTERSECTION PL
OF KY 15 AND KY 3401 (2020CCN) DN
(2022CCR) RW
UT
CN SPP 1,250,000
Project Cost: 1,250,000 0 0 0
Letcher 80200 KY-113 Spot improvements along KY 113 from KY PL
2545 to Landfill Rd where the Letcher DN
County Transfer Station is located. RW STP2 390,000
(2022CCN) UT STP2 370,000
CN STP2 1,410,000
Project Cost: 760,000 1,410,000 0 0
Letcher 80407 KY-932 Improve roadway visibility, access and PL
geometrics along KY 932 between US 119 DN SPP 2,200,000
and George's Branch Road RW SPP 920,000
UT SPP 1,200,000
CN SPP 14,700,000
Project Cost: 2,200,000 920,000 1,200,000 14,700,000
Total for Letcher county PL
DN 2,450,000 115,685
RW 3,390,000 3,010,000
UT 3,370,000 530,000 1,200,000
CN 54,650,000 48,600,000 48,470,000 15,471,236
Total Amounts: 63,860,000 52,140,000 49,670,000 15,586,921
Lewis 231 KY-59 New route from Vanceburg to KY 59, PL
new length of 3.4 miles DN
RW STP2 7,000,000
UT STP2 5,500,000
CN STP2 36,000,000
Project Cost: 7,000,000 5,500,000 36,000,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 169
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Lewis 8806.1000 KY-8 RECONSTRUCT KY-8 FROM KY-8C IN PL
GARRISON TO SCAFFOLD LICK ROAD. DN SPP 2,800,000
(16CCN)(18CCN) RW
UT
CN
Project Cost: 2,800,000 0 0 0
Lewis 8807 KY-57 RECONSTRUCT KY-57 FROM KY-9 TO PL
FLEMING/LEWIS COUNTY LINE (14CCN) DN
(16CCR) (18CCN) (2020CCR) (2022CCR) RW
(2024CCR) UT SPP 4,480,000
CN SPP 48,000,000
Project Cost: 4,480,000 0 48,000,000 0
Lewis 20029 KY-9 ADDRESS CONDITION OF KY-9 FROM PL
MILEPOINT 0 TO MILEPOINT 8.048 DN STP4 328,000
RW
UT
CN STP4 3,772,000
Project Cost: 0 4,100,000 0 0
Lewis 80251 KY-9 CONSTRUCT RIGHT AND LEFT TURN PL
LANES AT THE INTERSECTION OF KY 989 DN SPP 270,000
(MP18.553) TO IMPROVE SAFETY AND RW SPP 280,000
DECREASE COLLISIONS. (2022CCN) UT SPP 380,000
CN SPP 1,120,000
Project Cost: 270,000 280,000 380,000 1,120,000
Lewis 80354 KY-10 Construct left and right turning lanes from PL
KY 10 (AA Highway) onto KY 1306 (MP DN SPP 330,000
11.9 - 12.3) (2024CCN) RW SPP 240,000
UT
CN SPP 2,100,000
Project Cost: 330,000 240,000 2,100,000 0
170 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Lewis 80412 PF-9999 New route to be located between MP PL
16.8-14.8 on KY 9, to MP 3.42-5.2 on KY 8 DN SPP 5,000,000
RW SPP 4,000,000
UT SPP 5,000,000
CN SPP 65,000,000
Project Cost: 5,000,000 4,000,000 5,000,000 65,000,000
Total for Lewis county PL
DN 8,400,000 328,000
RW 7,000,000 4,520,000
UT 4,480,000 5,500,000 5,380,000
CN 3,772,000 86,100,000 66,120,000
Total Amounts: 19,880,000 14,120,000 91,480,000 66,120,000
Lincoln 167 US-27 US-27 CORRIDOR FROM SOMERSET TO PL
LEXINGTON. IMPROVE SAFETY AND DN
REDUCE CONGESTION ON US-27 FROM RW
KY-1247 TO EDUCATION WAY. UT
(2022CCR)
CN NH 37,000,000
Project Cost: 37,000,000 0 0 0
Lincoln 80000 US-127 NEW TURNING LANE AT ARCADIA VIEW PL
DRIVE(18CCN) (2020CCR) DN
RW
UT
CN SPP 1,520,000
Project Cost: 1,520,000 0 0 0
Lincoln 80201 US-27 Continue ongoing improvements to US 27 PL
Corridor from Somerset to Lexington. DN
Improve Level of Service and safety on RW NH 8,380,000
US 27 from KY 328 to KY 501 in Lincoln UT NH 4,970,000
County. (2022CCN) (2024CCR)
CN NH 54,560,000
Project Cost: 13,350,000 0 54,560,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 171
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Lincoln 80202 KY-300 RECONSTRUCTION TO MITIGATE PL
ROCKSLIDE DAMAGE ON KY 300 DN
(2022CCN) (2024CCR) RW
UT
CN SPP 2,160,000
Project Cost: 2,160,000 0 0 0
Lincoln 80300 US-150 Improve Safety and Access Control along PL
US 150 from Danville to Stanford. DN
(2024CCN) RW
UT NH 3,780,000
CN NH 11,760,000
Project Cost: 3,780,000 11,760,000 0 0
Lincoln 80400 US-27 Continue ongoing improvements to US 27 PL
corridor from Somerset to Lexington. DN
Improve Level of Service and safety on RW
US 27 from KY 70 at Eubank in Pulaski to UT NH 3,127,000
KY 328 in Lincoln County.
CN NH 32,833,500
Project Cost: 3,127,000 32,833,500 0 0
Total for Lincoln county PL
DN
RW 8,380,000
UT 11,877,000
CN 40,680,000 44,593,500 54,560,000
Total Amounts: 60,937,000 44,593,500 54,560,000 0
Livingston 330 US-60 PADUCAH-HENDERSON; RELOCATE PL
US-60 FROM EAST OF THE TENNESSEE DN
RIVER BRIDGE TO EAST OF RUDD-SPEES RW
ROAD (00CCR)(12CCR)(14CCR) UT SPP 3,240,000
(2020CCR) (2024CCR)
CN SPP 12,960,000
Project Cost: 3,240,000 12,960,000 0 0
172 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Livingston 10152 KY-135 BRIDGE PROJECT IN LIVINGSTON PL
COUNTY ON (070B00009N) KY-135 AT DN BRX 55,280
BUCK CREEK RW
UT
CN BRX 368,536
Project Cost: 0 0 0 423,816
Livingston 80418 KY-453 Improve safety and substandard PL
geometrics in curve along KY 453 (Dover DN
Rd.) from I-24 Exit 31 to Easter Day Rd. RW
(MP 4.401 - 5.314) UT
CN SPP 1,400,000
Project Cost: 1,400,000 0 0 0
Total for Livingston county PL
DN 55,280
RW
UT 3,240,000
CN 1,400,000 12,960,000 368,536
Total Amounts: 4,640,000 12,960,000 0 423,816
Logan 8908 KY-2349 IMPROVE SAFETY BY IMPROVING SIGHT PL
LINES CROSSING RAILROAD BETWEEN DN SPP 100,000
STOCKYARDS AND INDUSTRIAL PARK. RW SPP 120,000
(16CCN)(18CCN) (2020CCR) UT SPP 170,000
CN SPP 1,000,000
Project Cost: 100,000 290,000 1,000,000 0
Logan 10042 US-68 BRIDGE PROJECT IN LOGAN COUNTY ON PL
(071B00047N) US-68X AT RJC RAILROAD DN FBP 1,262,998
RW
UT
CN FBP 8,419,984
Project Cost: 0 9,682,982 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 173
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Logan 10043 KY-3201 BRIDGE PROJECT IN LOGAN COUNTY ON PL
(071B00099N) COOPERSTOWN-QUALIT DN BRX 208,307
AT MUD RIVER RW
UT
CN BRX 1,388,711
Project Cost: 0 0 0 1,597,018
Logan 80314 US-431 IMPROVE SAFETY AT THE INTERSECTION PL
OF US 431 AND KY 663. (2024CCN) DN SPP 400,000
RW SPP 200,000
UT SPP 250,000
CN SPP 930,000
Project Cost: 400,000 450,000 930,000 0
Logan 80414 US-79 Widen US 79 from Todd County line to PL
Russellville Bypass. (Estimates based on DN
preliminary engineering. Design funds RW
allocated under Logan Co. Item No. UT NH 12,600,000
03-80050)
CN NH 35,600,000
Project Cost: 12,600,000 35,600,000 0 0
Logan 80415 US-68 Improve safety at the US 68/US 431, US PL
68/Newtown Road, and US 68/KY 79 DN
intersections. (MP 12.265 - 12.465) RW
UT
CN SPP 4,000,000
Project Cost: 4,000,000 0 0 0
Total for Logan county PL
DN 500,000 1,262,998 208,307
RW 320,000
UT 12,600,000 420,000
CN 4,000,000 44,019,984 1,930,000 1,388,711
Total Amounts: 17,100,000 46,022,982 1,930,000 1,597,018
174 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Lyon 7 I -24 ADD RESTROOM FACILITY TO I-24 PL
EASTBOUND & WESTBOUND WEIGH DN
STATIONS IN LYON COUNTY (DESIGN RW
FUNDS AUTHORIZED UNDER ITEM NO. UT
99-44.00)
CN NH 2,060,000
Project Cost: 2,060,000 0 0 0
Lyon 187.5000 US-62, RELOCATE US-641 FROM US-62 NEAR PL
US-641 EDDYVILLE TO SOUTH OF THE DN
LYON/CALDWELL COUNTY LINE RW
(2020CCR) (2022CCR) (2024CCR) UT
CN STPF 17,000,000 12,000,000 6,360,000
Project Cost: 17,000,000 12,000,000 6,360,000 0
Lyon 10155 KY-295 BRIDGE PROJECT IN LYON COUNTY ON PL
(072B00038N) KY-295 AT I 24 @ MP DN BRX 483,907
40.720 RW
UT
CN BRX 3,226,046
Project Cost: 3,709,953 0 0 0
Lyon 10156 CS-1047 BRIDGE PROJECT IN LYON COUNTY ON PL
(072B00040N) GREGORY ROAD AT I-24 DN FBP2 64,109
@ MP. 042.048 RW
UT
CN FBP2 427,392
Project Cost: 491,501 0 0 0
Lyon 10157 KY-6020 BRIDGE PROJECT IN LYON COUNTY ON PL
(072B00046N) KY-6020 AT I-24 @ MP. DN FBP2 40,018
050.701 RW
UT
CN FBP2 266,784
Project Cost: 306,802 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 175
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Lyon 10161 KY-6020 BRIDGE PROJECT IN LYON COUNTY ON PL
(072B00058N) KY-6020 AT I-24 @ MP. DN FBP 326,658
050.701 RW
UT
CN FBP 2,177,722
Project Cost: 2,504,380 0 0 0
Lyon 22077 I -69 ADDRESS CONDITION OF I-069 FROM PL
MILEPOINT 68.084 (68.116 DN NHPM 310,000
NON-CARDINAL) TO MILEPOINT 71.818 RW
(71.786 CARDINAL) UT
CN NHPM 3,151,869
Project Cost: 3,461,869 0 0 0
Lyon 22078 I -69 ADDRESS CONDITION OF I-069 FROM PL
MILEPOINT 71.786 (71.818 DN NHPM 410,000
NON-CARDINAL) TO MILEPOINT 73.694 RW
UT
CN NHPM 4,090,000
Project Cost: 4,500,000 0 0 0
Lyon 80312 US-62 ON US 62 WHERE THE P&L RAIL PL
OVERPASS MEETS THE TWO (2) KY 810 DN
INTERSECTIONS, RECONSTRUCT US RW NH 450,000
62/KY 810 (NORTH AND SOUTH) UT NH 500,000
INTERSECTIONS WITH TURN LANES OR
CN NH 2,000,000
Project Cost: 0 950,000 2,000,000 0
Lyon 80419 US-62 Improve safety, mobility, and connectivity PL
by addressing commercial traffic DN SPP 750,000
movements on US-62 from I-24 Exit 40 RW SPP 200,000
Interchange ramps to Days Inn Drive. (MP UT SPP 200,000
6.5 - 7.1)
CN SPP 3,500,000
Project Cost: 750,000 400,000 3,500,000 0
176 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Lyon county PL
DN 2,384,692
RW 650,000
UT 700,000
CN 32,399,813 12,000,000 11,860,000
Total Amounts: 34,784,505 13,350,000 11,860,000 0
Madison 3 I -75 CONSTRUCT NEW I-75 INTERCHANGE PL
BETWEEN BEREA & RICHMOND TO DN SPP 2,080,000
ACCOMMODATE NEW INDUSTRIAL SITE RW SPP 3,000,000
BACK ENTRANCE AND POTENTIALLY UT SPP 2,500,000
MADISON COUNTY AIRPORT. (2024CCR)
CN SPP 30,000,000
Project Cost: 2,080,000 0 5,500,000 30,000,000
Madison 10050 KY-1985 BRIDGE PROJECT IN MADISON COUNTY PL
ON (076B00070N) KY-1985 AT TATES DN BRZ 237,649
CREEK RW
UT
CN BRZ 1,584,326
Project Cost: 0 0 1,821,975 0
Madison 80110 CR-1200, EXTEND BOGGS LN TO CONNECT TO PL
CS-1526 PAVILION WAY (2020CCN) (2022CCR) DN SPP 330,000
(2024CCR) RW SPP 1,010,000
UT SPP 330,000
CN SPP 1,270,000
Project Cost: 330,000 1,010,000 330,000 1,270,000
Madison 80314 KY-21 Reconstruct KY 21 from KY 1617 to US PL
421. (2024CCN) DN SPP 1,560,000
RW SPP 4,000,000
UT SPP 5,000,000
CN SPP 12,000,000
Project Cost: 1,560,000 9,000,000 12,000,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 177
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Madison 80315 KY-876 Improve capacity on Barnes Mill Road PL
between Goggins Lane and the I-75 DN SPP 1,820,000
interchange. Improvements to also include RW SPP 1,000,000
the intersection with Goggins Lane UT SPP 1,600,000
(2024CCN)
CN SPP 10,310,000
Project Cost: 4,420,000 0 10,310,000 0
Madison 80316 I -75 New construction/modification of the I-75 PL
exit 87 interchange as referenced in the DN
West Richmond Small Urban Area Study RW
(2024CCN) UT
CN NH 21,500,000
Project Cost: 0 0 0 21,500,000
Madison 80356 PF-9999 SCOPING STUDY TO EVALUATE THE PL SPP 320,000
FEASIBILITY OF EXTENDING THE BEREA DN
BYPASS FROM KY 21 IN EASTERN RW
BEREA TO US 25 SOUTH OF BEREA IN UT
MADISON COUNTY. (2024CCN)
CN
Project Cost: 320,000 0 0 0
Madison 80420 KY-52 Improve safety on KY 52 from KY 374 PL
(Charlie Norris Rd) to Drowning Creek DN SPP 950,000
Bridge #033B00017N at Estill CL. Break RW SPP 650,000
out section between Charlie Norris Rd (MP UT SPP 1,000,000
16.354) and Speedwell Road (MP 17.613)
CN SPP 4,400,000
Project Cost: 950,000 650,000 1,000,000 4,400,000
Madison 80421 FF-9999 Extend Farristown Industrial Drive at PL
Menelaus Rd (KY 1983) to the east to DN
connect to US 25. RW SPP 500,000
UT SPP 400,000
CN SPP 7,500,000
Project Cost: 900,000 7,500,000 0 0
178 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Madison 80429 KY-1986 Provide an additional connection for Union PL
City Road (KY 1986) to the Robert Martin DN
Bypass located east of the railroad. (MP RW SPP 750,000
0-0.4) UT SPP 500,000
CN SPP 5,400,000
Project Cost: 1,250,000 5,400,000 0 0
Madison 80430 KY-52 Improve capacity on KY 52 (Lancaster PL
Ave) beginning south of Elizabeth DN
St/Carnes Rd to north of Kit Carson Dr. RW SPP 425,000
(MP 9.997 - 10.346) UT SPP 850,000
CN SPP 8,850,000
Project Cost: 1,275,000 8,850,000 0 0
Total for Madison county PL 320,000
DN 6,740,000 237,649
RW 2,675,000 5,660,000 3,000,000
UT 3,350,000 5,000,000 3,830,000
CN 21,750,000 23,894,326 57,170,000
Total Amounts: 13,085,000 32,410,000 30,961,975 57,170,000
Magoffin 213 KY-40 ROADWAY IMPROVEMENTS AND PL
SIDEWALK CONSTRUCTION ALONG KY DN
40 (MP 0.145-0.660) TO BETTER RW
FACILITATE ALTERNATIVE UT
TRANSPORTATION METHODS (2018BOP).
CN STPF 3,780,000
Project Cost: 3,780,000 0 0 0
Magoffin 10053 KY-3333 BRIDGE PROJECT IN MAGOFFIN COUNTY PL
ON (077B00071N) KY-3333 AT LICK CR. DN FBP2 325,094
RW
UT
CN FBP2 2,167,290
Project Cost: 0 2,492,384 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 179
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Magoffin 22210 KY-9009 ADDRESS CONDITION OF Bert T. Combs PL
Mountain Parkway FROM MILEPOINT 69.58 DN STP4 220,000
TO MILEPOINT 71 RW
UT
CN STP4 2,190,000
Project Cost: 0 0 2,410,000 0
Magoffin 22211 KY-9009 ADDRESS CONDITION OF Bert T. Combs PL
Mountain Parkway FROM MILEPOINT 71 DN STP4 220,000
TO MILEPOINT 73.19 RW
UT
CN STP4 2,227,000
Project Cost: 0 0 2,447,000 0
Magoffin 80302 KY-7 RECONSTRUCT KY 7 FROM WILL BAILEY PL
BRANCH ROAD TO KY 1090. (2024CCN) DN
RW SPP 2,750,000
UT SPP 2,010,000
CN SPP 8,610,000
Project Cost: 0 2,750,000 2,010,000 8,610,000
Magoffin 80303 CR-1265 Reconstruct CR 1265 from the intersection PL
with KY 3337 (MP 0.0) to KY 3050 (MP DN SPP 730,000
0.547) (2024CCN) RW SPP 700,000
UT SPP 480,000
CN SPP 5,920,000
Project Cost: 730,000 700,000 480,000 5,920,000
Total for Magoffin county PL
DN 730,000 325,094 440,000
RW 3,450,000
UT 2,490,000
CN 3,780,000 2,167,290 4,417,000 14,530,000
Total Amounts: 4,510,000 5,942,384 7,347,000 14,530,000
180 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Marion 8805 PF-9999 EXTEND MARTIN LUTHER KING AVENUE PL
FROM DOWNTOWN LEBANON BYPASS DN SPP 1,120,000
(VETERANS MEMORIAL HIGHWAY). RW SPP 3,750,000
ESTIMATED DISTANCE IS 1.5 MILES UT
(14CCN) (2022CCN) (2024CCR)
CN
Project Cost: 1,120,000 0 3,750,000 0
Marion 10061 KY-1157 BRIDGE PROJECT IN MARION COUNTY ON PL
(078B00070N) KY-1157 AT ARBUCKLE DN FBP2 122,066
CREEK RW
UT
CN FBP2 813,773
Project Cost: 0 0 935,839 0
Marion 10088 KY-208 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-208 OVER ROLLING FORK OF SALT DN BRZ 599,535
RIV (078B00020N) RW
UT
CN BRZ 3,996,897
Project Cost: 4,596,432 0 0 0
Marion 10089 KY-527 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-527 OVER ROLLING FORK RIVER DN BRZ 448,074
(078B00056N) RW
UT
CN BRZ 2,987,160
Project Cost: 0 0 3,435,234 0
Marion 80153 CO-0 Extend KY 2154 Bypass from KY208 to PL
KY49. (2022CCR) (2024CCR) DN
RW SPP 5,750,000
UT SPP 2,800,000
CN
Project Cost: 5,750,000 0 2,800,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 181
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Marion 80252 CR-1119 REPLACE LOW WATER STRUCTURE ON PL
SILOAM ROAD (CR 1119) OVER NORTH DN FBP2 220,067
ROLLING FORK NEAR KY 337 RW
INTERSECTION MP 0.089 TO MP 0.122 UT
(078C00154N)
CN FBP2 1,467,113
Project Cost: 0 1,687,180 0 0
Marion 80259 KY-2154, IMPROVE CONNECTIVITY AND PL
KY-55, CONGESTION BETWEEN US 68 AND KY DN
PF-9999, 55 ON THE EAST SIDE OF LEBANON RW
US-68 (APPROXIMATELY 2 MILES) (2022CCN) UT
(2024CCR)
CN STPF 9,800,000
Project Cost: 9,800,000 0 0 0
Marion 80359 KY-84 Widen bridge (078B00027N) on KY 84 PL
over Prather Creek just west of Raywick DN FBP 646,875
(MP 4.31-4.36). RW
UT
CN FBP 4,312,500
Project Cost: 0 4,959,375 0 0
Marion 80413 KY-327 Add guardrail on KY 327 (MP 1.210 - PL
1.552) DN
RW
UT
CN GR 155,000
Project Cost: 155,000 0 0 0
Total for Marion county PL
DN 1,719,535 866,942 570,140
RW 5,750,000 3,750,000
UT 2,800,000
CN 13,951,897 5,779,613 3,800,933
Total Amounts: 21,421,432 6,646,555 10,921,073 0
182 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Marshall 20013 I -24 ADDRESS CONDITION OF I-024 FROM PL
MILEPOINT 17.32 TO MILEPOINT 26.558 DN NHPM 1,200,000
RW
UT
CN NHPM 12,000,000
Project Cost: 13,200,000 0 0 0
Marshall 80311 US-641 CORRECT GEOMETRIC DEFICIENCIES AND PL
ADDRESS SAFETY, SERVICE, AND DN
CONGESTION ISSUES FROM BENTON RW NH 1,750,000
BAPTIST TEMPLE ROAD / HAPPY UT NH 2,000,000
HOLLOW RD TO US 68 IN DRAFFENVILLE.
CN NH 10,000,000
Project Cost: 0 1,750,000 2,000,000 10,000,000
Marshall 80314 KY-348 IMPROVE GEOMETRIC ALIGNMENTS AND PL
ADDRESS ACCESS ISSUES AND SAFETY DN SPP 1,040,000
CONCERNS FROM KY 2206 TO THE RW SPP 1,000,000
ENTRANCE OF MARSHALL COUNTY UT SPP 1,500,000
HOSPITAL IN BENTON. (2024CCN)
CN SPP 6,000,000
Project Cost: 1,040,000 1,000,000 1,500,000 6,000,000
Total for Marshall county PL
DN 2,240,000
RW 2,750,000
UT 3,500,000
CN 12,000,000 16,000,000
Total Amounts: 14,240,000 2,750,000 3,500,000 16,000,000
Martin 154.1100 KY-40, INEZ TO WARFIELD (SECTION 2-1): FROM PL
PF-9999 LITTLE BLACKLOG TO BOOTH FORK. DN
[STA. 190+00 TO STA. 298+00 RW
(ENGLISH)] (2002BOP) (12CCR)(AR/W) UT SPP 2,320,000
(16CCR) (2022CCN) (2024CCR)
CN SPP 24,230,000 30,000,000
Project Cost: 2,320,000 24,230,000 30,000,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 183
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Martin 154.1600 KY-40, INEZ TO WARFIELD (SECTION 2-2): FROM PL
PF-9999 BOOTH FORK TO KY-2031 [STA. 298+00 DN
TO STA. 382+00 (ENGLISH)] (2002BOP) RW
(16CCR) (2022CCN) (2024CCR) UT
CN SPP 45,660,000
Project Cost: 0 0 45,660,000 0
Martin 154.2100 KY-40, INEZ TO WARFIELD (SECTION 2-3): FROM PL
PF-9999 KY-2031 TO KY-292 [STA. 382+00 TO DN
STA. 427+00 (ENGLISH)] (2002BOP) RW
(16CCR) (2022CCN) (2024CCR) UT
CN SPP 29,830,000
Project Cost: 0 0 29,830,000 0
Martin 154.3000 PF-9999 INEZ TO WARFIELD; BRIDGE OVER TUG PL
FORK (SECTION III) (R & U IDENTIFIED IN DN
SECTION II-ITEM NO. 154.10)(16CCR) RW
(2022CCN) (2024CCR) UT
CN SPP 19,820,000
Project Cost: 0 0 0 19,820,000
Martin 10128 KY-1224 BRIDGE PROJECT IN MARTIN COUNTY ON PL
(080B00006N) KY-1224 AT ROCKHOUSE DN FBP2 138,760
FORK RW
UT
CN FBP2 925,066
Project Cost: 0 0 0 1,063,826
Martin 80412 KY-908 Address safety concerns, substandard PL
roadway geometrics, and pavement DN
conditions on KY-908 from Reservoir RW
Road to Helen Mills Road. 1.5 miles (MP UT
6.705-8.182)
CN SPP 750,000
Project Cost: 750,000 0 0 0
184 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Martin 80413 KY-292 Improve safety and geometrics of KY 292 PL
from the intersection of KY 40 in Warfield DN SPP 2,000,000
north to the intersection of KY 908. RW SPP 1,115,000
(MP13.16 - 23.5) UT SPP 2,200,000
CN SPP 23,800,000
Project Cost: 3,115,000 2,200,000 23,800,000 0
Total for Martin county PL
DN 2,000,000 138,760
RW 1,115,000
UT 2,320,000 2,200,000
CN 750,000 24,230,000 129,290,000 20,745,066
Total Amounts: 6,185,000 26,430,000 129,290,000 20,883,826
Mason 10013.1000US-68 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US-68 OVER OHIO RIVER (081B00069N) DN BRO 300,000
RW
UT
CN BRO 2,000,000
Project Cost: 0 2,300,000 0 0
Mason 10091 US-62 BRIDGE PROJECT IN MASON COUNTY ON PL
(081B00041N) US-62X AT OHIO DN BRX 4,000,000
RIVER-MYVLLE- CSX R RW
UT
CN BRX 40,000,000
Project Cost: 44,000,000 0 0 0
Mason 10092 KY-1234 BRIDGE PROJECT IN MASON COUNTY ON PL
(081B00047N) KY-1234 AT INDIAN RUN DN BRX 76,747
CREEK RW
UT
CN BRX 511,649
Project Cost: 588,396 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 185
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Mason 80413 KY-9 Improve the operational efficiency for PL
northbound traffic on KY-9 (AA Highway) DN
at the intersection with Kenton Station RW
Drive (hospital entrance) (MP10.6-10.9) UT
CN SPP 1,000,000
Project Cost: 1,000,000 0 0 0
Total for Mason county PL
DN 4,076,747 300,000
RW
UT
CN 41,511,649 2,000,000
Total Amounts: 45,588,396 2,300,000 0 0
McCracken 142 US-62 Address issues with service, congestion PL
and safety from US 45 to I-24 in Paducah. DN
See March, 2002 Paducah-McCracken RW
County Transportation Study. (2024CCN) UT STP1 2,800,000
CN
Project Cost: 2,800,000 0 0 0
McCracken 153.3000 KY-1286 Improve KY 1286 from US 62(MP 5.000) to PL
Perkins Creek Bridge (MP 5.896, DN
B00167N). (Priority Section 3) (2022CCN) RW
(2024CCR) UT
CN STP1 4,760,000
Project Cost: 0 4,760,000 0 0
McCracken 153.4000 KY-1286 Improve KY 1286 from Perkins Creek PL
Bridge (MP 5.896, B00167N) to KY 998 DN
(MP 6.916). (Priority Section 4) (2022CCN) RW
(2024CCR) UT
CN STP1 5,220,000
Project Cost: 0 5,220,000 0 0
186 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
McCracken 1115.1000 US-60 RELOCATION AND MINOR WIDENING OF PL
US-60 FROM CLARKS RIVER TO US-62 DN NH 500,000
JCT.(10CCR)(14CCR)(LET W/ 1-1115.20) RW NH 3,500,000
(16CCR) UT NH 3,000,000
CN NH 13,000,000
Project Cost: 500,000 6,500,000 13,000,000 0
McCracken 4903 US-45 Upgrade navigational lighting for the US 45 PL
(Irvin S Cobb) Bridge. 073B00001N DN SPP 70,000
RW
UT
CN SPP 900,000
Project Cost: 70,000 900,000 0 0
McCracken 10163 US-60 BRIDGE PROJECT IN MCCRACKEN PL
COUNTY ON (073B00062N) US-62 AT DN BRO 732,741
P&L RAILWAY RW
UT
CN BRO 4,884,941
Project Cost: 0 0 0 5,617,682
McCracken 10198 US-45 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US-45 OVER OHIO RIVER (073B00001N) DN BRX 150,000
RW
UT
CN BRX 1,000,000
Project Cost: 1,150,000 0 0 0
McCracken 10261 I -24 Planning and Phase I Engineering for the PL
future expansion or replacement of the DN
I-24 Ohio River Bridge. (Shared Cost w/ RW
Illinois) (073B00100N) UT
CN BRO 1,375,000 1,375,000
Project Cost: 1,375,000 1,375,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 187
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
McCracken 20040 US-60 ADDRESS CONDITION OF US-60X FROM PL
MILEPOINT 0 TO MILEPOINT 0.7 DN STP5 36,000
RW
UT
CN STP5 414,000
Project Cost: 0 0 450,000 0
McCracken 80305 I -24 ADDRESS SAFETY, CONGESTION, AND PL
FUTURE CAPACITY ISSUES FROM US 60 DN NH 2,080,000
TO US 68 IN PADUCAH. SEE MARCH, RW NH 550,000
2002 PADUCAH-MCCRACKEN COUNTY UT NH 2,240,000
TRANSPORTATION STUDY. (2024CCN)
CN NH 39,200,000
Project Cost: 2,080,000 550,000 2,240,000 39,200,000
McCracken 80315 KY-998 IMPROVE MOBILITY, SAFETY AND PL
ADDRESS GEOMETRIC DEFICIENCIES ON DN SPP 1,500,000
KY 998 (OLIVET CHURCH ROAD) FROM RW SPP 2,750,000
KY 1286 (FRIENDSHIP ROAD) TO US 62. UT SPP 3,000,000
(2024CCN)
CN SPP 10,000,000
Project Cost: 1,500,000 2,750,000 3,000,000 10,000,000
McCracken 80317 KY-731 BASED ON THE 2019 PADUCAH SUA, ID PL
"Q". RECONFIGURE THE INTERSECTION DN
OF KY 731 AND LABELLE AVE. A RW SPP 2,000,000
ROUNDABOUT SHOULD BE CONSIDERED. UT SPP 3,500,000
THIS IS BASED ON 33 CRASHES IN 3
CN SPP 5,500,000
Project Cost: 5,500,000 5,500,000 0 0
McCracken 80404 I-24 Address safety, congestion, and future PL
capacity issues from Exit 3 to Exit 7 on DN NH 2,000,000
I-24 RW NH 1,500,000
UT NH 1,000,000
CN NH 30,000,000
Project Cost: 2,000,000 1,500,000 1,000,000 30,000,000
188 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
McCracken 80405 KY-998 Widen on KY 998 (Olivet Church Road) PL
from KY 1286 (Friendship Road) to US 60 DN SPP 300,000
to improve level of service and safety. RW SPP 1,600,000
See 2013 Planning Study UT SPP 600,000
CN SPP 2,400,000
Project Cost: 300,000 2,200,000 2,400,000 0
McCracken 80406 US-60 Improve safety, congestion, mobility, and PL
access at the Intersection of US 60 with DN
Coleman Rd. and James Sanders Blvd. RW NH 750,000
UT NH 750,000
CN NH 2,500,000
Project Cost: 1,500,000 2,500,000 0 0
Total for McCracken county PL
DN 6,600,000 36,000 732,741
RW 2,750,000 9,900,000
UT 7,050,000 3,600,000 6,240,000
CN 2,375,000 20,255,000 15,814,000 84,084,941
Total Amounts: 18,775,000 33,755,000 22,090,000 84,817,682
McCreary 10057 KY-92 BRIDGE PROJECT IN MCCREARY COUNTY PL
ON (074B00007N) KY-92 AT S. FORK OF DN FBP 2,208,703
CUMBERLAND RI RW
UT
CN
Project Cost: 0 0 0 2,208,703
McCreary 10061 CR-1314 BRIDGE PROJECT IN MCCREARY COUNTY PL
ON (074C00010N) WIBORG LOOP RD AT DN FBP2 317,874
NS (CNO&TP) SYSTEM RW
UT
CN FBP2 2,119,163
Project Cost: 0 0 2,437,037 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 189
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
McCreary 80004 KY-92 PRELIMINARY ENGINEERING AND PL SPP 500,000
ENVIRONMENTAL CORRIDOR STUDY FOR DN
IMPROVING SAFETY AND MAKING KY-92 RW
A SCENIC ROUTE FROM MONTICELLO TO UT
STEARNS (FLEXIBLE SOLUTIONS)
CN
Project Cost: 500,000 0 0 0
McCreary 80103 CR-1199 Improve mobility and safety RR crossing PL
elimination by constructing bridge and DN
realigning KY 1470, approx 0.177 miles RW
west of CR1199A (Dick Wilson Rd) and UT SPP 720,000
extending easterly to US 27. (2020CCN)
CN SPP 8,420,000
Project Cost: 720,000 8,420,000 0 0
McCreary 80406 US-27 Improve safety and mobility along US27 at PL
KY2792/ KY1651 and widen approach DN
routes 1500 feet on each side of US 27 in RW
Pine Knot UT NH 1,500,000
CN NH 3,200,000
Project Cost: 0 0 1,500,000 3,200,000
Total for McCreary county PL 500,000
DN 317,874 2,208,703
RW
UT 720,000 1,500,000
CN 8,420,000 2,119,163 3,200,000
Total Amounts: 1,220,000 8,420,000 3,937,037 5,408,703
McLean 8812 KY-136 REPLACE, IMPROVE ALIGNMENTS AND PL
APPROACHES, AND ADDRESS SAFETY DN
ISSUES WITH BRIDGES ON KY-136 IN RW
MCLEAN COUNTY FROM KY-56 TO OHIO UT
COUNTY LINE. (075B00034N,
CN SPP 7,560,000
Project Cost: 7,560,000 0 0 0
190 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
McLean 10135 KY-56 BRIDGE PROJECT IN WEBSTER COUNTY PL
ON (117B00012N) KY-56 AT GREEN DN FBP 1,927,758
RIVER RW
UT
CN FBP 12,851,723
Project Cost: 0 0 0 14,779,481
McLean 10152 KY-140 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY 140 OVER PORTERS DITCH DN BRX 112,724
(075B00041N) RW
UT
CN BRX 751,490
Project Cost: 0 0 864,214 0
McLean 80420 KY-140 Address safety concerns of intersection PL
of KY 140 and KY 815 in McLean County DN SPP 280,000
(MP 7.239-7.259) RW SPP 350,000
UT SPP 600,000
CN SPP 1,200,000
Project Cost: 0 280,000 950,000 1,200,000
Total for McLean county PL
DN 280,000 112,724 1,927,758
RW 350,000
UT 600,000
CN 7,560,000 751,490 14,051,723
Total Amounts: 7,560,000 280,000 1,814,214 15,979,481
Meade 80305 KY-313 ADDRESS TRAVEL TIME RELIABILITY PL
AND IMPROVE INTERSECTIONS ALONG DN SPP 2,240,000
KY 313 FROM HARDIN COUNTY TO KY RW SPP 940,000
1638 IN BRANDENBURG. (2024CCN) UT
CN
Project Cost: 2,240,000 0 940,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 191
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Meade 80309 KY-313 ADDRESS SAFETY AND MOBILITY PL
ALONG KY 313 (BRANDENBURG DN
BYPASS) FROM KY 448 TO KY 228 IN RW SPP 830,000
BRANDENBURG. (2024CCN) UT SPP 1,460,000
CN SPP 24,000,000
Project Cost: 0 830,000 1,460,000 24,000,000
Total for Meade county PL
DN 2,240,000
RW 830,000 940,000
UT 1,460,000
CN 24,000,000
Total Amounts: 2,240,000 830,000 2,400,000 24,000,000
Menifee 102 KY-713 Complete spot improvement to modernize PL
the roadway on KY 713 in the Fagan area DN STP2 600,000
from approximately Milepoint 6.6 to RW STP2 450,000
approximately Milepoint 7.25. UT STP2 250,000
CN STP2 2,500,000
Project Cost: 600,000 700,000 2,500,000 0
Menifee 250 US-460 Reconstruction of US 460 from Lucky PL
Stop to KY 713 @ Means. (2024CCN) DN
RW STP2 3,750,000
UT STP2 12,730,000
CN STP2 15,840,000
Project Cost: 3,750,000 12,730,000 15,840,000 0
Menifee 8805 US-460 WIDEN EXISTING ROADWAY AND PL
IMPROVE VERTICAL AND HORIZONTAL DN
CURVES. NEW CONSTRUCTION. RW SPP 9,200,000
COMPLETES US 460 UPGRADES IN UT SPP 4,240,000
MENIFEE COUNTY FROM MP 14.35 TO
CN SPP 42,650,000
Project Cost: 0 9,200,000 4,240,000 42,650,000
192 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Menifee 10054 KY-713 BRIDGE PROJECT IN MENIFEE COUNTY ON PL
(083B00024N) KY-713 AT BEAVER CR DN FBP2 193,448
@MENIFEE HISCH RW
UT
CN FBP2 1,289,656
Project Cost: 0 0 0 1,483,104
Menifee 80200 US-460 IMPROVE SAFETY, CORRECT PL
GEOMETRICS, AND ENHANCE REGIONAL DN
CONNECTIVITY ON US 460 FROM THE RW SPP 7,500,000
INTERSECTION OF KY 1240 TO 0.7 MILES UT SPP 3,600,000
EAST OF THE MORGAN COUNTY LINE
CN SPP 37,120,000
Project Cost: 7,500,000 3,600,000 37,120,000 0
Menifee 80201 US-460 Improve safety, correct geometrics, and PL
enhance regional connectivity on US 460 DN
from the bridge over Dog Trot Fork (MP RW
3.3) to Rothwell (MP 4.8). (2022CCN) UT
(2024CCR)
CN STPF 13,220,000
Project Cost: 13,220,000 0 0 0
Menifee 80403 US-460 Improve safety, correct geometrics, and PL
enhance regional connectivity on US 460 DN NH 1,200,000
from the intersection Becraft Rd. (MP 1.3) RW NH 1,850,000
to bridge over Dog Trot Fork (MP 3.25) UT NH 1,350,000
CN NH 12,250,000
Project Cost: 1,200,000 3,200,000 12,250,000 0
Menifee 80412 KY-36 Improve safety and mobility on KY 36 from PL
0.1 miles south of Suiter Branch Rd. to the DN SPP 2,000,000
intersection with US 460 (MP 6.136). RW SPP 3,250,000
UT SPP 6,500,000
CN SPP 16,500,000
Project Cost: 0 2,000,000 9,750,000 16,500,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 193
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Menifee county PL
DN 1,800,000 2,000,000 193,448
RW 11,250,000 11,500,000 3,250,000
UT 17,930,000 10,740,000
CN 13,220,000 67,710,000 60,439,656
Total Amounts: 26,270,000 31,430,000 81,700,000 60,633,104
Mercer 417 CS-1237 IMPROVE SYSTEM MOBILITY ALONG PL
MOBERLY ROAD FROM KY 390 TO KY DN
1989 IN NORTHWEST HARRODSBURG. RW
(12CCR) (2020CCN) (2024CCR) UT
CN SPP 2,760,000
Project Cost: 0 0 2,760,000 0
Mercer 80417 US-127 Improve safety & access with turn lanes PL
onto Adams Ln from US127 (2 left & 1 SB DN SPP 150,000
right). RW
UT
CN SPP 350,000
Project Cost: 500,000 0 0 0
Mercer 80424 US-127 Improve access onto US 127 from the PL
Industrial Park North of the Harrodsburg DN
Bypass. Consider design/build. RW
UT
CN SPP 1,750,000
Project Cost: 1,750,000 0 0 0
Total for Mercer county PL
DN 150,000
RW
UT
CN 2,100,000 2,760,000
Total Amounts: 2,250,000 0 2,760,000 0
194 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Metcalfe 112.1000 KY-90 SUMMER SHADE BYPASS. (06CCR) PL
(2006BOPC)(08CCR)(12CCR)(14CCR) DN
(2024CCN) RW SPP 5,180,000
UT SPP 4,900,000
CN SPP 20,720,000
Project Cost: 10,080,000 0 0 20,720,000
Metcalfe 8955 KY-163 IMPROVE HIGHWAY SAFETY AND PL
SYSTEMS MOBILITY IN THE KY 163 DN STP2 2,710,000
CORRIDOR BETWEEN KY 90 (MP 2.907) RW STP2 12,870,000
AND THE PROPOSED WEST EDMONTON UT STP2 10,130,000
BYPASS (MP 9.777). (16CCN)(18CCN)
CN STP2 43,800,000
Project Cost: 2,710,000 23,000,000 0 43,800,000
Metcalfe 80306 US-68 INTERSECTION IMPROVEMENTS AT US-68 PL
AND KY-80. OPTIONS INCLUDE DN SPP 330,000
REALIGNMENT OF NORTH APPROACH, RW SPP 310,000
WIDENING FOR TURN LANES, AND A UT SPP 310,000
ROUNDABOUT. (2024CCN)
CN SPP 1,240,000
Project Cost: 330,000 310,000 310,000 1,240,000
Metcalfe 80309 LN-9008 IMPROVE SAFETY AND ADDRESS PL
GEOMETRIC DEFICIENCIES ON THE LB DN SPP 1,940,000
NUNN CUMBERLAND EXPRESSWAY AT RW SPP 330,000
EXIT 27 INTERCHANGE. (2024CCN) UT SPP 380,000
CN SPP 11,160,000
Project Cost: 1,940,000 330,000 380,000 11,160,000
Metcalfe 80400 KY-640 Reconstruct profile grade of 800 feet PL
length of roadway to minimize road DN SPP 100,000
closure due to flooding RW SPP 40,000
UT SPP 130,000
CN SPP 500,000
Project Cost: 100,000 170,000 500,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 195
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Metcalfe 80416 KY-90 Improve safety and mobility on KY 90 PL
between the Barren County Line and KY DN
640 in Summer Shade. (MP 0-3.283) RW SPP 750,000
UT SPP 750,000
CN SPP 4,000,000
Project Cost: 750,000 750,000 4,000,000 0
Metcalfe 80417 KY-1243 Improve safety and the alignment on KY PL
1243 from Wayne Porter Road to Ratliff DN SPP 900,000
Mitchell Road. (MP 6.011-9.09) RW SPP 2,500,000
UT SPP 1,500,000
CN SPP 7,000,000
Project Cost: 0 900,000 4,000,000 7,000,000
Total for Metcalfe county PL
DN 5,080,000 900,000
RW 5,930,000 13,550,000 2,500,000
UT 4,900,000 11,010,000 2,190,000
CN 4,500,000 83,920,000
Total Amounts: 15,910,000 25,460,000 9,190,000 83,920,000
Monroe 128.1100 KY-214 OPERATION OF TURKEY NECK BEND PL
FERRY FOR FY 2027-2032.(12CCR) DN
(2020CCR) (2024CCR) RW
UT
CN SPP 1,250,000 1,250,000 1,250,000 1,250,000
Project Cost: 1,250,000 1,250,000 1,250,000 1,250,000
Monroe 80003 KY-100 REPLACE BRIDGE ON KY-100 BETWEEN PL
MP 14.7 AND 14.9. (18CCN) DN BRX 204,133
RW
UT
CN BRX 1,360,887
Project Cost: 0 1,565,020 0 0
196 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Monroe 80401 KY-163 Reconstruct or realign KY 163 (Celina PL
Road) from Tennessee State Line to DN
Tompkinsville Bypass RW SPP 6,000,000
UT SPP 1,500,000
CN SPP 30,000,000
Project Cost: 0 6,000,000 1,500,000 30,000,000
Monroe 80418 KY-100 Improve safety and mobility on KY 100 at PL
the narrow bridge over East Fork Barren DN SPP 300,000
River. (MP 13.5-13.6) RW SPP 100,000
UT SPP 200,000
CN SPP 1,500,000
Project Cost: 300,000 100,000 200,000 1,500,000
Monroe 80419 KY-100 Improve safety and mobility on KY 100 at PL
the narrow bridge over Spring Creek. DN
(MP1.72-1.77) RW
UT
CN SPP 600,000
Project Cost: 600,000 0 0 0
Monroe 80420 KY-100 Improve safety and mobility on KY 100 at PL
the narrow bridge over Indian Creek. (MP DN
4-4.1) RW
UT
CN SPP 800,000
Project Cost: 800,000 0 0 0
Total for Monroe county PL
DN 300,000 204,133
RW 6,100,000
UT 1,700,000
CN 2,650,000 2,610,887 1,250,000 32,750,000
Total Amounts: 2,950,000 8,915,020 2,950,000 32,750,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 197
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Montgomery 411 KY-1991 UPGRADE HINKSTON PIKE IN MT. PL
STERLING FROM NEW MIDLAND TRAIL TO DN
THE NEW INDUSTRIAL PARK ENTRANCE RW
(INCLUDES EXTENSION OF INDUSTRIAL UT SPP 980,000
ACCESS ROAD TO HINKSTON PIKE).
CN SPP 9,050,000
Project Cost: 0 980,000 0 9,050,000
Montgomery 8810 US-60 WIDEN EXISTING PAVEMENT & IMPROVE PL
VERTICAL & HORIZONTAL CURVES DN
FROM EXISTING MT STERLING BYPASS RW
(KY 686) TO 500' W OF BENTBROOK UT
SUBDIVISION. ADD FULL WIDTH
CN SPP 12,320,000
Project Cost: 0 12,320,000 0 0
Montgomery 10057 KY-3362 BRIDGE PROJECT IN MONTGOMERY PL
COUNTY ON (087B00053N) KY-3362 AT DN FBP2 153,841
GRASSY LICK CREEK RW
UT
CN FBP2 1,025,604
Project Cost: 0 0 0 1,179,445
Montgomery 80408 Reconstruction of KY 2346 (Airport Road) PL
DN SPP 500,000
RW SPP 150,000
UT SPP 250,000
CN SPP 6,250,000
Project Cost: 500,000 150,000 250,000 6,250,000
Montgomery 80423 US-460 Reconstruct US-460 from Cardinal Ln to PL
US-60 in Mount Sterling. This should DN
include a consistent urban typical and RW STP1 3,600,000
other geometric improvements. UT STP1 5,000,000
CN STP1 14,650,000
Project Cost: 3,600,000 5,000,000 0 14,650,000
198 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Montgomery county PL
DN 500,000 153,841
RW 3,600,000 150,000
UT 5,980,000 250,000
CN 12,320,000 30,975,604
Total Amounts: 4,100,000 18,450,000 250,000 31,129,445
Morgan 8004 PF-9999 WEST LIBERTY BYPASS - CONSTRUCT PL
NEW ROUTE FROM US 460 @ KY 2498 DN SPP 1,800,000
TO US 460 @ KY 172. (00CCN) RW SPP 4,030,000
UT SPP 1,240,000
CN SPP 21,170,000
Project Cost: 1,800,000 4,030,000 1,240,000 21,170,000
Morgan 8402 KY-7 RECONSTRUCT KY-7 FROM MILE POST PL
2.7 TO MILE POST 5.6 (JUNCTION 519 TO DN
SOUTH SIDE OF WRIGLEY HILL) RW
UT STP2 1,850,000
CN STP2 14,500,000
Project Cost: 0 1,850,000 14,500,000 0
Morgan 10079 KY-437 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-437 OVER BIRCH FK OF WILLIAMS DN FBP 138,338
CRK (088B00064N) RW
UT
CN FBP 922,254
Project Cost: 1,060,592 0 0 0
Morgan 20031 KY-882 ADDRESS CONDITION OF KY-882 FROM PL
MILEPOINT 0 TO MILEPOINT 2.468 DN STP4 152,000
RW
UT
CN STP4 1,748,000
Project Cost: 0 1,900,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 199
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Morgan 20032 KY-985 ADDRESS CONDITION OF KY-985 FROM PL
MILEPOINT 0 TO MILEPOINT 2.015 DN STP4 140,000
RW
UT
CN STP4 1,610,000
Project Cost: 0 1,750,000 0 0
Morgan 20033 KY-1260 ADDRESS CONDITION OF KY-1260 FROM PL
MILEPOINT 0 TO MILEPOINT 2.8 DN STP4 160,000
RW
UT
CN STP4 1,840,000
Project Cost: 2,000,000 0 0 0
Morgan 80202 US-460 Improve safety and substandard PL
geometrics on US 460 from the Menifee DN SPP 580,000
County Line to approximately milepoint 0.8. RW SPP 500,000
(2022CCN) (2024CCR) UT SPP 180,000
CN SPP 5,858,000
Project Cost: 580,000 500,000 180,000 5,858,000
Morgan 80307 US-460 Improve safety and reliability of US 460 PL
from the intersection of KY 1081 to the DN SPP 1,200,000
Magoffin County line (2024CCN) RW SPP 500,000
UT SPP 750,000
CN SPP 10,000,000
Project Cost: 1,200,000 500,000 750,000 10,000,000
Morgan 80400 US-460 Planning study on US 460 to assess PL SPP 500,000
needs and program future projects from DN
the Menifee Co. line to Salyersville RW
UT
CN
Project Cost: 500,000 0 0 0
200 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Morgan county PL 500,000
DN 3,878,338 292,000
RW 5,030,000
UT 1,850,000 2,170,000
CN 2,762,254 3,358,000 14,500,000 37,028,000
Total Amounts: 7,140,592 10,530,000 16,670,000 37,028,000
Muhlenberg 8803 KY-2533 STRAIGHTEN DEAN ROAD INTERSECTION PL
OF 189 BYPASS TO KY 181 NORTH DN
NEAR THE INTERSECTION WITH THE WKY RW SPP 1,730,000
PARKWAY, WENDELL FORD NATIONAL UT SPP 1,120,000
GUARD CENTER, AND JOB CORP.
CN SPP 7,590,000
Project Cost: 1,730,000 1,120,000 7,590,000 0
Muhlenberg 22164 WK-9001 ADDRESS CONDITION OF Wendell H. Ford PL
Western KY Parkway FROM MILEPOINT DN NHPM 670,000
54.317 TO MILEPOINT 59.92 RW
UT
CN NHPM 6,651,254
Project Cost: 7,321,254 0 0 0
Muhlenberg 80201 WK-9001 WESTERN KENTUCKY PKY - PL
RECONSTRUCT INTERCHANGE AT US 431 DN
AT CENTRAL CITY (2022CCN) (2024CCR) RW
UT SPP 2,090,000
CN SPP 15,600,000
Project Cost: 2,090,000 15,600,000 0 0
Muhlenberg 80405 KY-176 RECONSTRUCTION FROM GREENVILLE PL
TO THE MIDDLE SCHOOL DN SPP 1,000,000
RW SPP 2,300,000
UT SPP 1,800,000
CN SPP 9,800,000
Project Cost: 1,000,000 2,300,000 1,800,000 9,800,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 201
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Muhlenberg 80406 KY-431 Reconstruction of Rocky Creek Bridge on PL
US 431 and northern approach to the DN SPP 500,000
bridge. RW SPP 255,000
UT SPP 450,000
CN SPP 1,300,000
Project Cost: 500,000 705,000 1,300,000 0
Muhlenberg 80412 KY-171 Improve pavement width and shoulders on PL
KY-171 to improve traffic flow and DN SPP 200,000
enhance usability for commercial vehicles. RW SPP 7,700,000
UT SPP 3,000,000
CN SPP 2,100,000
Project Cost: 200,000 10,700,000 2,100,000 0
Total for Muhlenberg county PL
DN 2,370,000
RW 1,730,000 10,255,000
UT 2,090,000 4,570,000 1,800,000
CN 6,651,254 15,600,000 10,990,000 9,800,000
Total Amounts: 12,841,254 30,425,000 12,790,000 9,800,000
Nelson 396.1000 US-150 IMPROVE SAFETY, MOBILITY, AND PL
GEOMETRICS ON US-150 FROM THE DN
BLUEGRASS PARKWAY TO THE RW
NELSON/WASHINGTON COUNTY LINE. UT
(2016BOP)(18CCR)(D-Auth under 4-396)
CN STPF 15,000,000 15,000,000 15,000,000
Project Cost: 15,000,000 15,000,000 15,000,000 0
Nelson 8308.1000 US-150 WIDEN US-150 FROM KY-49 TO NEAR PL
KY-245/WAL-MART WIDENING. (06CCN) DN
(2022CCN) (2024CCR) RW
UT
CN STP1 21,000,000
Project Cost: 0 0 21,000,000 0
202 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Nelson 10065 KY-2738 BRIDGE PROJECT IN NELSON COUNTY ON PL
(090B00109N) KY-2738 AT EAST FORK DN BRX 78,525
SIMPSON CREEK RW
UT
CN BRX 523,503
Project Cost: 0 0 0 602,028
Nelson 80254 PF-9999, IMPROVE CONNECTIVITY WEST OF PL
US-31 BARDSTOWN BY CONSTRUCTION NEW DN SPP 7,840,000
ROUTE FROM THE BLUEGRASS RW SPP 12,500,000
PARKWAY BEGINNING WEST OF EXIT 21 UT
TO KY245 (2022CCN). (2024CCR)
CN
Project Cost: 7,840,000 0 12,500,000 0
Nelson 80255 PF-9999, IMPROVE MOBILITY AND CONNECTIVITY PL
US-31 WEST OF BARDSTOWN FROM KY 245 TO DN
US 31E NEAR COX'S CREEK. (2022CCN) RW STPF 5,000,000
(2024CCR) UT STPF 3,000,000
CN STPF 18,000,000
Project Cost: 5,000,000 3,000,000 18,000,000 0
Nelson 80356 KY-55 Address geometric deficiencies along KY PL
55 near pleasant view road in Bloomfield. DN SPP 340,000
(2024CCN) RW SPP 1,000,000
UT SPP 200,000
CN SPP 1,500,000
Project Cost: 340,000 1,000,000 200,000 1,500,000
Nelson 80361 PF-9999 Construct new interchange on BG PL
Parkway at KY 1858. Partial eligibility for DN NH 3,360,000
Interchange only as NH funds. (2024CCN) RW NH 12,000,000
UT NH 3,000,000
CN SPP 70,000,000
Project Cost: 3,360,000 0 15,000,000 70,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 203
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Nelson 80363 US-31 Improve traffic operations, mobility and PL
passing opportunities along US 31 E DN
(Louisville - Bardstown Rd) from KY 509 RW
to Bullitt County Line. Consider a 2+1 UT
configuration and/or innovative
CN STPF 20,500,000
Project Cost: 0 0 0 20,500,000
Nelson 80416 US-62 ADDRESS CONGESTION ALONG US 62 IN PL
BARDSTOWN FROM KY 245 TO KY 605. DN
(MP 15.894-17.209) RW SPP 1,500,000
UT SPP 1,300,000
CN SPP 6,500,000
Project Cost: 1,500,000 1,300,000 6,500,000 0
Nelson 80418 KY-509 Bridge Replacement (090B00101N) KY PL
509 (MP 2.220-2.240) DN FBP 225,000
RW FBP 15,000
UT FBP 50,000
CN FBP 1,500,000
Project Cost: 1,790,000 0 0 0
Nelson 80419 BG-9002 Preliminary Engineering, Environmental, PL
and Design for installation of DN SPP 200,000
approximately 10 miles of priority safety RW
locations of cable median barrier along the UT
Bluegrass Parkway (BG9002)
CN SPP 5,000,000
Project Cost: 0 200,000 5,000,000 0
Total for Nelson county PL
DN 11,765,000 200,000 78,525
RW 6,515,000 1,000,000 24,500,000
UT 50,000 4,300,000 3,200,000
CN 16,500,000 15,000,000 65,500,000 92,523,503
Total Amounts: 34,830,000 20,500,000 93,200,000 92,602,028
204 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Nicholas 205 KY-36 IMPROVE THE KY-36/KY-32 PL
INTERSECTION NEAR THE NICHOLAS DN
COUNTY SCHOOL PROPERTY (12CCR) RW
(16CCR)(2020CCR) (2022CCR) UT STP2 1,620,000
(2024CCR)
CN STP2 6,720,000
Project Cost: 1,620,000 6,720,000 0 0
Nicholas 8811 KY-36 RECONSTRUCT KY 36/KY 928 PL
INTERSECTION. (14CCN)(16CCR)(18CCN) DN
(2024CCR) RW SPP 440,000
UT
CN SPP 1,680,000
Project Cost: 440,000 1,680,000 0 0
Nicholas 22360 US-68 ADDRESS CONDITION OF US-68 FROM PL
MILEPOINT 10.73 TO MILEPOINT 12.13 DN STP4 121,600
RW
UT
CN STP4 1,398,400
Project Cost: 1,520,000 0 0 0
Nicholas 80306 KY-36 Improve safety, geometric deficiencies, PL
and promote connectivity along KY-36 DN SPP 2,430,000
between US-68 (mile-point 0.864) and RW SPP 3,600,000
KY-13 (mile-point 3.910). (2024CCN) UT SPP 4,640,000
CN SPP 29,760,000
Project Cost: 2,430,000 3,600,000 4,640,000 29,760,000
Nicholas 80407 KY-386 Improve access along KY 386 (Carpenter PL
Pike) from US 68 to new industrial site. DN
RW SPP 625,000
UT SPP 830,000
CN SPP 1,750,000
Project Cost: 0 1,455,000 1,750,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 205
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Nicholas county PL
DN 2,551,600
RW 440,000 4,225,000
UT 1,620,000 830,000 4,640,000
CN 1,398,400 8,400,000 1,750,000 29,760,000
Total Amounts: 6,010,000 13,455,000 6,390,000 29,760,000
Ohio 8951 KY-54 IMPROVE SAFETY ON KY 54 BY PL
UPGRADING MP 7.0 TO MP 8.0 TO THREE DN
LANES INCLUDING CURB AND GUTTER RW SPP 2,020,000
AND ADDRESSING TWO SHARP TURNS. UT SPP 2,640,000
(16CCN)(18CCN) (2020CCR) (2022CCR)
CN SPP 7,300,000
Project Cost: 2,020,000 2,640,000 7,300,000 0
Ohio 10123 KY-69 BRIDGE PROJECT IN OHIO COUNTY ON PL
(092B00015N) KY-69 AT SMITH CREEK DN FBP 350,943
RW
UT
CN FBP 2,339,618
Project Cost: 0 0 0 2,690,561
Ohio 10131 KY-505 BRIDGE PROJECT IN OHIO COUNTY ON PL
(092B00159N) KY-505 AT BR-INDIAN DN BRX 148,460
CAMP CREEK RW
UT
CN BRX 989,736
Project Cost: 0 0 1,138,196 0
Ohio 22134 I -165 ADDRESS CONDITION OF I-165 FROM PL
MILEPOINT 35.064 TO MILEPOINT 47.221 DN NHPM 3,200,000
RW
UT
CN NHPM 32,000,000
Project Cost: 0 0 0 35,200,000
206 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Ohio 22136 I -165 ADDRESS CONDITION OF I-165 FROM PL
MILEPOINT 47.221 TO MILEPOINT 59.474 DN NHPM 1,100,000
RW
UT
CN NHPM 11,000,000
Project Cost: 0 0 12,100,000 0
Ohio 80303 US-231 ADDRESS LEFT TURN LANE ISSUES ON PL
US-231 AT BOTH PERDUE ENTRANCES. DN NH 850,000
(2024CCN) RW NH 910,000
UT NH 980,000
CN NH 3,890,000
Project Cost: 850,000 1,890,000 3,890,000 0
Ohio 80408 KY-69 Address the safety concerns of KY-69 PL
from Sunnydale Road to KY-54 at DN
Fordsville. RW SPP 4,500,000
UT SPP 5,000,000 5,000,000
CN SPP 2,550,000
Project Cost: 0 9,500,000 5,000,000 2,550,000
Ohio 80409 KY-69 Reconstruct KY-69 from KY-85 in PL
Centertown to KY-276 (Goshen Road). DN SPP 1,500,000
(This is a breakout of IP20150399.) RW SPP 3,000,000
UT SPP 5,000,000
CN SPP 15,000,000
Project Cost: 1,500,000 3,000,000 5,000,000 15,000,000
Total for Ohio county PL
DN 2,350,000 1,248,460 3,550,943
RW 2,020,000 8,410,000
UT 8,620,000 10,000,000
CN 23,179,736 51,889,618
Total Amounts: 4,370,000 17,030,000 34,428,196 55,440,561
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 207
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Oldham 234 KY-146, KY-393 RECONSTRUCT FROM 140FEET PL
KY-393 SOUTH OF RAILROAD CROSSING (CSX) DN
EXTENDING NORTHWEST TOWARDS KY RW
146 ENDING AT STATION 12+00 (DESIGN UT
UNDER 5-230.00). (CONSTRUCTION
CN STPF 12,200,000 10,000,000
Project Cost: 12,200,000 10,000,000 0 0
Oldham 304.1000 KY-22 Reconstruct KY 22 from KY 329 to Abbott PL
Lane, Including Rail Crossing Improvement DN
in the vicinity of KY 329 (Railroad Ave) RW SPP 4,335,000
and CSX Railroad to improve safety and UT SPP 2,875,000
freight mobility through Crestwood (KY
CN SPP 12,130,000
Project Cost: 7,210,000 12,130,000 0 0
Oldham 483.1000 I -71 WIDEN I-71 FROM FOUR TO SIX LANES PL
FROM KY-329 (MP 14.1) TO KY-393 (MP DN
18.0). (2022CCR) (2024CCR) RW
UT
CN NH 37,500,000 27,000,000
Project Cost: 37,500,000 27,000,000 0 0
Oldham 483.2000 I -71 WIDEN I-71 FROM FOUR TO SIX LANES PL
FROM KY-393 (MP 18.0) TO KY-53 (MP DN
22.4). (16CCN) (2024CCR) RW NH 2,420,000
UT NH 1,040,000
CN NH 40,000,000
Project Cost: 3,460,000 40,000,000 0 0
Oldham 10126 KY-1694 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY 1694 OVER HARRODS CREEK DN FBP2 745,433
(093B00025N) RW
UT
CN FBP2 4,969,553
Project Cost: 0 5,714,986 0 0
208 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Oldham 80005 I -71 IMPROVE THE INTERCHANGE OF I 71 AND PL
KY 329. (18CCN) (2020CCR) (DESIGNED DN
UNDER 5-483.10) (2022CCR) (2024CCR) RW
UT
CN NH 8,200,000
Project Cost: 8,200,000 0 0 0
Oldham 80209 KY-53 Improve safety and reduce congestion on PL
KY 53 from I-71 to Zhale Smith Road. DN
Includes consideration of a five lane RW STPF 820,000
widening and bike/ ped accommodations. UT STPF 350,000
(2022CCN) (2024CCR)
CN STPF 17,400,000
Project Cost: 1,170,000 17,400,000 0 0
Oldham 80210 KY-146 Improve safety and reduce congestion on PL
KY 146 (LaGrange Road) from KY 329B DN
(KY 329 Bypass) to KY 393. Includes RW SPP 9,425,000
consideration of a four lane widening and UT SPP 6,925,000
bike/ped accommodations. (2022CCN)
CN SPP 40,600,000
Project Cost: 9,425,000 6,925,000 40,600,000 0
Oldham 80211 KY-524 Landslide repair on Westport Road PL
(KY-524) from JCT. US-42 West, north 1.0 DN
mile. (2002BOPC)(NOT REQUIRED) RW
(2022CCN) UT
CN SPP 4,000,000
Project Cost: 4,000,000 0 0 0
Oldham 80307 US-42 IMPROVE TRAFFIC FLOW, MINIMIZE PL
CONGESTION, AND ADDRESS SAFETY DN
ISSUES ON US 42 BETWEEN RIDGMOOR RW NH 7,500,000
DRIVE AND KY 1694 (GUM STREET). UT NH 5,000,000
INCLUDES CONSIDERATION OF A THREE
CN NH 30,000,000
Project Cost: 12,500,000 30,000,000 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 209
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Oldham 80313 I-71 IMPROVE SAFETY AND REDUCE PL
CONGESTION AT THE I-71/KY 53 DN
(NORTH/SOUTH FIRST AVENUE) RW
INTERCHANGE. INCLUDES UT
CONSIDERATION OF AN ADDITIONAL
CN NH 6,500,000
Project Cost: 6,500,000 0 0 0
Oldham 80314 KY-362 IMPROVE SAFETY, ACCESS, AND PL
ADDRESS GEOMETRIC DEFICIENCIES DN
ALONG KY 362 FROM THE RW SPP 1,820,000
OLDHAM/SHELBY COUNTY LINE TO KY UT SPP 1,500,000
146 (IN AND SOUTH OF PEWEE VALLEY).
CN SPP 22,420,000
Project Cost: 0 3,320,000 0 22,420,000
Oldham 80325 KY-146 REDUCE CONGESTION, IMPROVE SAFETY PL
AND ENHANCE MOBILITY ON KY 146 IN DN
BUCKNER FROM KY 1817 (NEW CUT RW SPP 1,140,000
ROAD) (MP 6.81) TO KY 393 (MP 7.42). UT SPP 1,130,000
(2024CCN)
CN SPP 5,580,000
Project Cost: 2,270,000 5,580,000 0 0
Oldham 80345 KY-22 IMPROVE SAFETY AND REDUCE PL
CONGESTION, ALONG US 22 FROM DN
HAUNZ LANE TO KY 329. (2024CCN) RW
UT SPP 1,040,000
CN SPP 4,600,000
Project Cost: 1,040,000 4,600,000 0 0
Total for Oldham county PL
DN 745,433
RW 25,640,000 1,820,000
UT 11,435,000 8,425,000
CN 68,400,000 151,679,553 40,600,000 22,420,000
Total Amounts: 105,475,000 162,669,986 40,600,000 22,420,000
210 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Owen 8702 KY-22 WIDEN KY 22 FROM INTERSECTION WITH PL
KY 845 TO THE OWEN/GRANT COUNTY DN
LINE.(12CCN)(14CCR)(16CCR) RW SPP 3,300,000
(2024CCN) UT SPP 1,350,000
CN SPP 21,600,000
Project Cost: 3,300,000 1,350,000 0 21,600,000
Owen 80319 KY-355 RECONSTRUCTION KY 355 FROM KY 22 PL
IN GRATZ TO KY 1982 NEAR PERRY DN SPP 4,860,000
PARK. (2024CCN) RW SPP 6,250,000
UT SPP 2,400,000
CN SPP 85,800,000
Project Cost: 4,860,000 8,650,000 0 85,800,000
Owen 80412 KY-330 Improve safety and mobility and address PL
geometric deficiencies along KY 330 DN SPP 5,000,000
(Owenton Road) from Canby Lane to KY RW SPP 8,000,000
607 (New Columbus Road). UT SPP 3,000,000
CN SPP 40,000,000
Project Cost: 5,000,000 8,000,000 3,000,000 40,000,000
Owen 80422 KY-1883 Resurfacing KY 1883 (MP 1.299 - 7.887) PL
DN
RW
UT
CN STP5 870,100
Project Cost: 870,100 0 0 0
Owen 80423 KY-3548 Improve safety and mobility along KY 35 PL
from US 127 to the Gallatin County line. DN SPP 3,000,000
(MP 0-4.132) RW SPP 2,500,000
UT SPP 1,500,000
CN SPP 25,000,000
Project Cost: 0 0 5,500,000 26,500,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 211
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Owen county PL
DN 9,860,000 3,000,000
RW 3,300,000 14,250,000 2,500,000
UT 3,750,000 3,000,000 1,500,000
CN 870,100 172,400,000
Total Amounts: 14,030,100 18,000,000 8,500,000 173,900,000
Owsley 173 KY-708 REPLACE BRIDGE OVER MOORES FORK PL
AND REALIGN ROADWAY. DN BRX 145,000
RW
UT
CN BRX 1,450,000
Project Cost: 0 1,595,000 0 0
Owsley 20041 KY-30 ADDRESS CONDITION OF KY-30 FROM PL
MILEPOINT 3.45 TO MILEPOINT 8.606 DN STP4 264,000
RW
UT
CN STP4 3,036,000
Project Cost: 0 3,300,000 0 0
Total for Owsley county PL
DN 409,000
RW
UT
CN 4,486,000
Total Amounts: 0 4,895,000 0 0
Pendleton 8508.1000 KY-22, RELOCATE KY 22 FROM THE PL
PF-9999 INTERSECTION OF FRYER ROAD AND KY DN SPP 3,440,000
330 TO US 27 (ALIGNMENT H FROM 1988 RW SPP 11,590,000
STUDY) (2022CCN) (2024CCR) UT SPP 2,030,000
CN SPP 64,250,000
Project Cost: 3,440,000 11,590,000 2,030,000 64,250,000
212 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Pendleton 10059 US-27 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US 27 OVER SO.FK. LICKING RIVER DN FBP 2,349,709
(096B00021N) RW
UT
CN
Project Cost: 0 0 0 2,349,709
Pendleton 80253 US-27 IMPROVE SAFETY AND MOBILITY ON US PL
27 AT THE KY INTERSECTION (MILEPOINT DN STPF 420,000
11.6 TO MILEPOINT 12) (2022CCN) RW STPF 550,000
(2024CCR) UT STPF 190,000
CN STPF 4,060,000
Project Cost: 420,000 740,000 4,060,000 0
Pendleton 80258 KY-177 RECONSTRUCTION FROM KY 3185 IN PL
BUTLER TO KY 467 (2022CCN) DN SPP 2,240,000
RW
UT
CN
Project Cost: 2,240,000 0 0 0
Pendleton 80306 US-27 IMPROVE SAFETY AND MOBILITY ON US PL
27 AT THE KY 22 INTERSECTION. DN
(2024CCN) RW STPF 390,000
UT STPF 650,000
CN STPF 7,800,000
Project Cost: 390,000 650,000 7,800,000 0
Pendleton 80310 KY-177 RECONSTRUCT KY 177 FROM LICKING PL
RIVER BRIDGE IN BUTLER TO KY 3185. DN SPP 2,170,000
(2024CCN) RW SPP 580,000
UT SPP 1,120,000
CN SPP 26,400,000
Project Cost: 2,170,000 580,000 1,120,000 26,400,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 213
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Pendleton 80408 KY-17 Improve safety and mobility and address PL
geometric deficiencies along KY 17 from DN SPP 1,000,000
US 27 to KY 1853 (Bryan Griffin Road). RW SPP 750,000
UT SPP 1,000,000
CN SPP 7,000,000
Project Cost: 1,000,000 750,000 1,000,000 7,000,000
Total for Pendleton county PL
DN 9,270,000 2,349,709
RW 390,000 13,470,000
UT 840,000 4,150,000
CN 11,860,000 97,650,000
Total Amounts: 9,660,000 14,310,000 16,010,000 99,999,709
Perry 209.1000 KY-476 IMPROVE KY 476 FROM BRIDGE OVER PL
NORTH FORK KY RIVER (MP. 0.45) TO DN SPP 160,000
NORTH OF WALKER CORNETT ROAD IN RW
WABACO. (SECTION 1) UT SPP 580,000
CN SPP 3,780,000
Project Cost: 160,000 580,000 3,780,000 0
Perry 209.2000 KY-476 IMPROVE KY 476 FROM KY-15X IN PL
WALKERTOWN TO BRIDGE OVER NORTH DN SPP 330,000
FORK KY RIVER. RW SPP 720,000
UT SPP 700,000
CN SPP 4,200,000
Project Cost: 330,000 720,000 700,000 4,200,000
Perry 269.2000 KY-15 RECONSTRUCTION OF KY 15 FROM PL
BONNYMAN TO NEAR KY 28. (14CCN) DN
(2020CCN) (2022CCR) (2024CCR) RW SPP 13,750,000
UT SPP 6,050,000
CN SPP 73,080,000
Project Cost: 13,750,000 6,050,000 73,080,000 0
214 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Perry 8903 HR-9006 NEW INTERCHANGE OFF OF A NEW EXIT PL
55 HAL ROGERS PARKWAY. (16CCN) DN
(18CCN) (2024CCR) RW
UT
CN NH 12,000,000
Project Cost: 12,000,000 0 0 0
Perry 10056 KY-476 BRIDGE PROJECT IN PERRY COUNTY ON PL
(097B00005N) KY-476 AT JAKES CREEK DN BRX 168,143
RW
UT
CN BRX 1,120,951
Project Cost: 1,289,094 0 0 0
Perry 10084 CR-1540 ADDRESS DEFICIENCIES OF BRIDGE ON PL
BRIDGE RD OVER LEATHERWOOD CREEK DN BRZ 127,184
(097C00060N) RW
UT
CN BRZ 847,895
Project Cost: 975,079 0 0 0
Perry 22203 HR-9006 ADDRESS CONDITION OF Hal Rogers PL
Daniel Boone Parkway FROM MILEPOINT DN STP4 410,000
51.026 TO MILEPOINT 56.1 RW
UT
CN STP4 4,094,627
Project Cost: 0 4,504,627 0 0
Perry 80305 KY-1440 Reconstruct roadway to eliminate flooding PL
beginning at the intersection with KY 550. DN SPP 710,000
(2024CCN) RW SPP 830,000
UT SPP 1,180,000
CN SPP 5,760,000
Project Cost: 710,000 830,000 1,180,000 5,760,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 215
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Perry 80306 KY-550 Improve drainage issues and construct PL
sidewalk on KY 550 from MP 1.2 to MP 1.7 DN SPP 680,000
near the Galen College of Nursing. RW SPP 1,660,000
(2024CCN) UT SPP 1,300,000
CN SPP 2,020,000
Project Cost: 680,000 1,660,000 1,300,000 2,020,000
Perry 80308 PF-9999 Construct a new access road to East PL
Perry Sports Complex development and a DN
connector to Nautilus Drive (2024CCN) RW
UT
CN SPP 1,080,000 1,890,000
Project Cost: 0 0 1,080,000 1,890,000
Perry 80416 KY-451 Reconstruction from Woodland Park PL
Bridge to KY 15X in Hazard. DN SPP 700,000
(MP2.999-3.47) RW SPP 500,000
UT SPP 1,000,000
CN SPP 5,000,000
Project Cost: 700,000 500,000 1,000,000 5,000,000
Total for Perry county PL
DN 2,875,327 410,000
RW 13,750,000 3,710,000
UT 6,630,000 4,180,000
CN 13,968,846 4,094,627 77,940,000 18,870,000
Total Amounts: 30,594,173 14,844,627 82,120,000 18,870,000
Pike 147 KY-1426 MITIGATE OR ELIMINATE ROCKFALL PL
HAZARDS AND IMPROVE ROADWAY DN
FOR BETTER FLOW AND EFFICIENCY IN RW
ORDER TO HANDLE THE EXPECTED UT
CONGESTION ARISING FROM EVENTS AT
CN PROT 15,000,000 10,000,000 7,400,000
Project Cost: 15,000,000 10,000,000 7,400,000 0
216 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Pike 198 KY-194 IMPROVE KY 194 FROM US 119 RAMP PL
NEAR SMITH FARMS BOTTOM (CR 1458) DN
TO NEAR DESKINS BRANCH CULVERT. RW
(18CCR) (2020CCR) UT
CN STPF 9,000,000
Project Cost: 9,000,000 0 0 0
Pike 281 KY-194 CURVE REVISION AND PASSING LANES PL
ON KY-194 NEAR DESKINS BRANCH DN
(08CCR)(12CCR) RW
UT
CN STP2 12,030,200
Project Cost: 12,030,200 0 0 0
Pike 346 US-460 IMPROVE SAFETY AND REDUCE PL
CONGESTION AT THE US-460 AND DN
KY-1460 INTERSECTION. (2020CCR) RW
(2022CCR) (2024CCR) UT
CN NH 6,060,000
Project Cost: 0 0 6,060,000 0
Pike 10169 KY-1056 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY 1056 OVER Tug Fork River DN BRX 175,000
(098B00171N) (Border bridge with RW
WVDOT) UT
CN BRX 1,750,000
Project Cost: 0 1,925,000 0 0
Pike 10171 US-52 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US 52 OVER Tug Fork, CR 15, NSRR DN FBP 150,000
(098B00263N) (Border bridge with RW
WVDOT) UT
CN FBP 1,000,000
Project Cost: 1,150,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 217
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Pike 10172 US-52 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US 52 OVER Tug Fork, CR 15, NSRR DN FBP 150,000
(098B00263S) (Border bridge with RW
WVDOT) UT
CN FBP 1,000,000
Project Cost: 1,150,000 0 0 0
Pike 10173 US-52 ADDRESS DEFICIENCIES OF BRIDGE ON PL
US 52 OVER Tug Fork, KY 292 DN BRX 305,000
(098B00265N) (Border bridge with RW
WVDOT) UT
CN BRX 3,050,000
Project Cost: 3,355,000 0 0 0
Pike 80308 KY-1469 Improve substandard geometrics in the PL
curve near Marshall Branch. (2024CCN) DN
RW SPP 175,000
UT SPP 250,000
CN SPP 1,910,000
Project Cost: 425,000 1,910,000 0 0
Pike 80309 US-23 Make template changes to improve sight PL
distance, drainage, and ingress/egress DN
through this commercial section of US 23 RW NH 230,000
(2024CCN) UT NH 1,320,000
CN NH 4,000,000
Project Cost: 0 230,000 1,320,000 4,000,000
Pike 80351 KY-122 Replace bridge (098B00064N) on KY 122 PL
(MP 13.45-13.65) DN FBP 430,237
RW
UT
CN FBP 2,868,244
Project Cost: 0 0 3,298,481 0
218 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Pike 80403 KY-199 Improve geometric and drainage issues PL
between MP 8.93 and 9.10. DN
RW SPP 150,000
UT SPP 250,000
CN SPP 475,000
Project Cost: 400,000 475,000 0 0
Pike 80404 KY-1460 Studies for possible road way PL SPP 1,000,000
realignments, roadway widening, curve DN
reconfigurations, etc. RW
UT
CN
Project Cost: 1,000,000 0 0 0
Total for Pike county PL 1,000,000
DN 605,000 175,000 430,237
RW 325,000 230,000
UT 500,000 1,320,000
CN 41,080,200 14,135,000 16,328,244 4,000,000
Total Amounts: 43,510,200 14,540,000 18,078,481 4,000,000
Powell 163.2000 KY-213 IMPROVE SAFETY, UPGRADE PL
GEOMETRICS, AND ADDRESS CAPACITY DN
ISSUES FOR KY 213 FROM KY 615 TO RW SPP 3,600,000
BOTTOM OF MOUNTAIN. (PRIORITY UT SPP 1,740,000
SECTION 2)(2018BOP) (2022CCN)
CN SPP 9,300,000
Project Cost: 3,600,000 1,740,000 9,300,000 0
Powell 170 KY-11 Improve safety and traffic operations PL
along KY 11/KY 15 in Stanton from east of DN
Halls Lane to west of Stonegate Drive by RW
widening and providing a two-way UT
left-turn lane. (2024CCN)
CN SPP 3,920,000
Project Cost: 3,920,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 219
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Powell 176 KY-15 Minor widening to improve redundancy of PL
Regional Travel. DN
RW
UT
CN PROT 7,200,000
Project Cost: 7,200,000 0 0 0
Powell 194 KY-9000 MOUNTAIN PARKWAY AT EXIT 16: PL
INSTALL ROADWAY LIGHTING AS A DN NH 110,000
SAFETY MEASURE DUE TO FLOODING RW
CONCERNS. UT
CN NH 1,000,000
Project Cost: 110,000 1,000,000 0 0
Powell 20004 KY-9000 ADDRESS CONDITION OF Bert T. Combs PL
Mountain Parkway FROM MILEPOINT DN STP4 630,000
11.913 TO MILEPOINT 19.228 RW
UT
CN STP4 6,297,100
Project Cost: 6,927,100 0 0 0
Powell 80250 KY-11 CONSTRUCT A BRIDGE ON KY 11 PL
(CAMPTON RD MP 3.4 TO 3.85) ACROSS DN
THE BERT T. COMBS MOUNTAIN RW SPP 5,000,000
PARKWAY UT SPP 5,000,000
CN SPP 12,890,000
Project Cost: 5,000,000 5,000,000 12,890,000 0
Powell 80405 KY-11 Improve drainage on KY 11 from PL
Derickson Lane to Ewen Street DN SPP 300,000
RW SPP 500,000
UT SPP 100,000
CN SPP 1,900,000
Project Cost: 300,000 500,000 100,000 1,900,000
220 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Powell 80406 KY-11 Improve access to Red River Gorge area PL
by reconstructing ramps and terminals at DN SPP 1,500,000
Exit 33 of the Mountain Parkway RW SPP 250,000
UT SPP 250,000
CN SPP 7,000,000
Project Cost: 1,500,000 250,000 250,000 7,000,000
Total for Powell county PL
DN 2,540,000
RW 8,600,000 750,000
UT 6,740,000 350,000
CN 17,417,100 1,000,000 22,190,000 8,900,000
Total Amounts: 28,557,100 8,490,000 22,540,000 8,900,000
Pulaski 59.6000 KY-80, Somerset Northern Bypass Section 4; PL
PF-9999 From East of the KY 39 Interchange, to KY DN
461 / KY 80 Interchange (8-59.25 - BUILD RW
Grant Project)(Congressional KYD UT
Earmark - $45M)
CN NH 16,000,000 17,000,000
Project Cost: 16,000,000 17,000,000 0 0
Pulaski 121 KY-196 HORIZONTAL AND VERTICAL PL
REALIGNMENT OF KY-196 AT WHITE OAK DN
CREEK FROM 1.0 MILE E OF WARNER RW SPP 530,000
ROAD TO 0.3 MILE W OF SIEVERS ROAD. UT SPP 520,000
(10CCR)(14CCR) (2024CCN)
CN SPP 3,450,000
Project Cost: 530,000 520,000 3,450,000 0
Pulaski 169 KY-39 IMPROVE SAFETY AND MOBILITY ALONG PL
KY 39 BETWEEN KY 80 AND OAK LEAF DN STP1 710,000
LANE. (2020CCR) (2024CCR) RW STP1 2,530,000
UT STP1 1,150,000
CN STP1 7,980,000
Project Cost: 710,000 2,530,000 1,150,000 7,980,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 221
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Pulaski 272 US-27 Reduce congestion and improve safety PL
and mobility along US 27 between General DN
Burnside Island and Cumberland River RW
Bridge. UT NH 3,000,000
(2024CCN)
CN NH 15,220,000
Project Cost: 3,000,000 15,220,000 0 0
Pulaski 10063 KY-1956 BRIDGE PROJECT IN PULASKI COUNTY PL
ON (100B00015N) KY-1956 AT LINE DN BRX 312,402
CREEK RW
UT
CN BRX 2,082,679
Project Cost: 0 0 0 2,395,081
Pulaski 10065 KY-934 BRIDGE PROJECT IN PULASKI COUNTY PL
ON (100B00048N) KY-934 AT BRUSHY DN BRX 31,693
CREEK RW
UT
CN BRX 211,288
Project Cost: 0 0 0 242,981
Pulaski 10066 CR-1254, BRIDGE PROJECT IN PULASKI COUNTY PL
KY-751 ON (100B00066N) KENO RD (KY-751) AT DN BRX 641,804
NS (CNO&TP) SYSTEM RW
UT
CN BRX 4,278,690
Project Cost: 0 4,920,494 0 0
Pulaski 10086 CR-1622 ADDRESS DEFICIENCIES OF BRIDGE ON PL
ED DICK RD OVER ROCK LICK CREEK DN BRZ 158,893
(100C00069N) RW
UT
CN BRZ 1,059,288
Project Cost: 1,218,181 0 0 0
222 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Pulaski 80104 KY-90 REDUCE CONGESTION AND IMPROVE PL
SAFETY, CAPACITY AND MOBILITY DN
ALONG KY 90 BETWEEN WAYNE RW SPP 6,300,000
COUNTY LINE AND NEW CUMBERLAND UT SPP 2,270,000
RIVER BRIDGE (2020CCN) (2022CCR)
CN SPP 21,280,000
Project Cost: 6,300,000 0 2,270,000 21,280,000
Pulaski 80301 KY-1642 Improve safety and reduce congestion PL
along KY 1642 from 0.178 mile west of DN SPP 750,000
KY 1577 to KY 914 (2024CCN) RW SPP 1,500,000
UT SPP 2,250,000
CN SPP 3,972,000
Project Cost: 750,000 1,500,000 2,250,000 3,972,000
Pulaski 80302 KY-461 Address safety, capacity and access PL
issues along KY-461 from south of Buck DN
Creek extending northerly to RW SPP 7,640,000
Pulaski/Rockcastle Line (as a continuation UT SPP 6,670,000
of 8-59.25). (2024CCN)
CN SPP 51,240,000
Project Cost: 14,310,000 0 51,240,000 0
Pulaski 80310 KY-914 Minor widening along KY-914 by adding PL
turning lanes and relocating an existing DN
entrance into adjacent property. RW
(2024CCN) UT
CN SPP 1,100,000
Project Cost: 1,100,000 0 0 0
Pulaski 80312 KY-3262 Improve geometrics and safety along KY PL
3262 from Baker Road to approximately DN SPP 514,800
0.5mi northeast of Baker Road (2024CCN) RW SPP 640,000
UT SPP 510,000
CN SPP 4,720,000
Project Cost: 514,800 640,000 510,000 4,720,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 223
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Pulaski 80350 KY-1642 Improve safety and congestion along KY PL
1642 at KY 1577 (MP 13.4 -13.7) DN
(2024CCN) RW
UT SPP 1,500,000
CN SPP 3,640,000
Project Cost: 1,500,000 3,640,000 0 0
Pulaski 80353 US-27 Improve sight distance at the left turn PL
lanes along US 27 at KY 635 traffic light DN SPP 100,000
(MP 22.5 -22.8) (2024CCN) RW
UT SPP 150,000
CN SPP 780,000
Project Cost: 100,000 150,000 780,000 0
Pulaski 80402 KY-761 Improve safety and horizontal geometrics PL
along KY 761 from 0.141 miles south of DN SPP 475,000
Bucanan Road to 0.147 miles south of RW SPP 300,000
Hudson Branch Road. UT SPP 360,000
CN SPP 2,775,000
Project Cost: 475,000 660,000 2,775,000 0
Pulaski 80403 US-27 Conduct Planning Study along US 27 from PL SPP 729,400
Pitman Creek Bridge to KY 2227/KY 3091 DN
(Light #1) to assess access management RW
and safety. UT
CN
Project Cost: 729,400 0 0 0
Pulaski 80407 US-27 Conduct Planning Study along US 27 from PL SPP 729,400
Pitman Creek Bridge to KY 2227/KY 3091 DN
(Light #1) to assess access management RW
and safety. UT
CN
Project Cost: 729,400 0 0 0
224 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Pulaski county PL 1,458,800
DN 2,708,693 641,804 344,095
RW 14,470,000 4,970,000
UT 11,170,000 1,030,000 6,180,000
CN 18,159,288 40,138,690 58,245,000 40,245,967
Total Amounts: 47,966,781 46,780,494 64,425,000 40,590,062
Robertson 8711 KY-616 IMPROVE CURVE ON KY 616 AND PL
IMPROVE ROADWAY FROM THE NEW DN
ROBERTSON COUNTY SCHOOL TO MT RW
OLIVET. (12CCN)(14CCR)(18CCN) UT
(2020CCR) (2022CCR) (2024CCR)
CN SPP 4,480,000
Project Cost: 4,480,000 0 0 0
Robertson 80312 US-62 IMPROVE THE INTERSECTION OF US 62 PL
AND KY 165 IN MOUNT OLIVET. DN
(2024CCN) RW SPP 2,100,000
UT SPP 1,040,000
CN SPP 2,800,000
Project Cost: 0 3,140,000 2,800,000 0
Total for Robertson county PL
DN
RW 2,100,000
UT 1,040,000
CN 4,480,000 2,800,000
Total Amounts: 4,480,000 3,140,000 2,800,000 0
Rockcastle 10088 KY-1249 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-1249 OVER W.FK. SKEGG CREEK DN BRZ 222,691
(102B00051N) RW
UT
CN BRZ 1,484,604
Project Cost: 0 0 1,707,295 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 225
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Rockcastle 20018 I -75 ADDRESS CONDITION OF I-075 FROM PL
MILEPOINT 60.1 TO MILEPOINT 65.22 (64.5 DN NHPM 630,000
CARDINAL) RW
UT
CN NHPM 6,339,713
Project Cost: 0 0 6,969,713 0
Rockcastle 80303 KY-461 Address capacity and access issues PL
along KY-461 from Pulaski/Rockcastle DN
County Line to KY 1250. (2024CCN) RW SPP 6,960,000
UT SPP 6,610,000
CN SPP 46,310,000
Project Cost: 13,570,000 0 46,310,000 0
Rockcastle 80304 KY-461 Address safety, capacity and access PL
issues along KY-461 from KY 1250 to US DN SPP 1,672,000
150. (2024CCN) RW SPP 4,600,000
UT SPP 4,380,000
CN SPP 29,680,000
Project Cost: 6,272,000 4,380,000 29,680,000 0
Rockcastle 80306 US-150 Address capacity issues from KY-461 to PL
US-25 in Mt. Vernon to continue corridor DN
improvements to US 150 as identified in RW STP1 2,840,000
the 1998 planning study. (2024CCN) UT STP1 3,120,000
CN STP1 18,170,000
Project Cost: 5,960,000 0 18,170,000 0
Total for Rockcastle county PL
DN 1,672,000 852,691
RW 14,400,000
UT 9,730,000 4,380,000
CN 101,984,317
Total Amounts: 25,802,000 4,380,000 102,837,008 0
226 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Rowan 234 KY-801 Extend KY 801 from its intersection with PL SPP 320,000
KY 158 at Sharkey to KY 32 near the DN SPP 3,920,000
Fleming/Rowan county line. (2024CCR) RW SPP 9,600,000
UT SPP 5,600,000
CN SPP 50,400,000
Project Cost: 4,240,000 9,600,000 5,600,000 50,400,000
Rowan 8406.1000 KY-377 IMPROVE SAFETY AND CONNECTIVITY PL
AND REDUCE CONGESTION ON KY-377 DN
FROM KY-32 TO JUST SOUTH OF CLEAR RW
FORK ROAD. (2022BOP) (2024CCN) UT
CN STP2 20,760,000 20,000,000
Project Cost: 20,760,000 20,000,000 0 0
Rowan 8406.2000 KY-377 IMPROVE SAFETY AND CONNECTIVITY PL
AND REDUCE CONGESTION ON KY-377 DN
FROM JUST SOUTH OF CLEARK FORK RW
ROAD TO JUST NORTH OF KY 799 (BIG UT STP2 11,760,000
PERRY ROAD). (2024CCN)
CN STP2 39,600,000
Project Cost: 11,760,000 39,600,000 0 0
Rowan 22048 I -64 ADDRESS CONDITION OF I-064 FROM PL
MILEPOINT 134.75 TO MILEPOINT 138.3 DN NHPM 800,000
RW
UT
CN NHPM 8,000,000
Project Cost: 8,800,000 0 0 0
Rowan 22050 I -64 ADDRESS CONDITION OF I-064 FROM PL
MILEPOINT 147.9 TO MILEPOINT 148.665 DN NHPM 230,000
RW
UT
CN NHPM 2,259,115
Project Cost: 2,489,115 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 227
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Rowan 80108 CR-1391 WIDEN AND SOFTEN CURVE ON CR 1391 PL
(BRATTON BRANCH RD) AT WALMART DN SPP 25,000
(2020CCN) RW SPP 60,000
UT SPP 80,000
CN SPP 270,000
Project Cost: 25,000 140,000 270,000 0
Rowan 80307 KY-32 Improve safety and reduce congestion on PL
KY 32 (Flemingsburg Road) between the DN
intersections of CS 1203 (Trademore RW NH 3,000,000
Drive) and CS1001 (Fraley Drive) and in UT NH 7,540,000
the vicinity of the I-64 interchange.
CN NH 31,000,000
Project Cost: 3,000,000 7,540,000 31,000,000 0
Rowan 80308 KY-32 Reduce congestion and improve mobility PL
on KY 32 (Flemingsburg Road) between DN SPP 1,820,000
the intersections with KY 3531 (Viking RW SPP 2,300,000
Drive) and CS1020 (Mabry Drive). UT SPP 3,920,000
(2024CCN)
CN SPP 18,000,000
Project Cost: 1,820,000 6,220,000 18,000,000 0
Rowan 80309 KY-32, US-60 Improve safety and reduce congestion at PL
the intersection of US 60 (West Wilkinson DN
Blvd.) and KY 32 (Flemingsburg Road). RW STP1 440,000
(2024CCN) UT STP1 600,000
CN STP1 4,350,000
Project Cost: 1,040,000 4,350,000 0 0
Total for Rowan county PL 320,000
DN 6,795,000
RW 3,440,000 11,960,000
UT 12,360,000 11,540,000 5,600,000
CN 31,019,115 63,950,000 49,270,000 50,400,000
Total Amounts: 53,934,115 87,450,000 54,870,000 50,400,000
228 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Russell 156 US-127 Reduce congestion and improve capacity, PL
safety and mobility on US 127 between DN
the west bypass of Jamestown to the RW
Cumberland Parkway. See segment 12 in UT
June 1998 Advance (2024CCR)
CN NH 26,300,000
Project Cost: 26,300,000 0 0 0
Russell 166 US-127 Reduce congestion and improve safety, PL
capacity and mobility along US 127 from DN
the Cumberland Parkway to Lakeway RW NH 1,700,000
drive KY 379 in Russell Springs. UT NH 2,000,000
CN NH 8,500,000
Project Cost: 3,700,000 8,500,000 0 0
Russell 20020 KY-80 ADDRESS CONDITION OF KY-80 FROM PL
MILEPOINT 4.1 TO MILEPOINT 6.6 DN STP5 224,000
RW
UT
CN STP5 2,576,000
Project Cost: 0 0 2,800,000 0
Russell 22209 LN-9008 ADDRESS CONDITION OF Louie B. Nunn PL
Cumberland Parkway FROM MILEPOINT DN NHPM 370,000
57.791 TO MILEPOINT 62.176 RW
UT
CN NHPM 3,667,044
Project Cost: 0 0 4,037,044 0
Russell 80250 US-127 IMPROVE CONGESTION AND SAFETY PL
ALONG US 127 AT KY 1381 (VOILS DN SPP 260,000
ROAD) AND SK LANE IN RUSSELL RW SPP 1,050,000
SPRINGS (MILEPOINT 17.2 TO MILEPOINT UT SPP 1,040,000
17.45) (2022CCN)
CN SPP 2,080,000
Project Cost: 260,000 1,050,000 1,040,000 2,080,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 229
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Russell 80316 KY-3278 IMPROVE GEOMETRICS ALONG KY 3278. PL
(2024CCN) DN
RW SPP 200,000
UT SPP 400,000
CN SPP 890,000
Project Cost: 0 200,000 400,000 890,000
Russell 80404 KY-80 Improve safety, mobility, and congestion PL
along KY 80 from US 127 to Eastern City DN SPP 771,300
Limit of Russell Springs. RW SPP 1,285,500
UT SPP 1,028,400
CN SPP 5,142,000
Project Cost: 771,300 1,285,500 1,028,400 5,142,000
Total for Russell county PL
DN 1,031,300 594,000
RW 1,700,000 2,535,500
UT 2,000,000 2,468,400
CN 26,300,000 8,500,000 6,243,044 8,112,000
Total Amounts: 31,031,300 11,035,500 9,305,444 8,112,000
Scott 20051 I -75 ADDRESS CONDITION OF I-075 FROM PL
MILEPOINT 134.386 TO MILEPOINT DN NHPM 690,000
136.758 RW
UT
CN NHPM 6,910,000
Project Cost: 7,600,000 0 0 0
Scott 80102 KY-2906 IMPROVE CAPACITY AND ACCESS ON PL
KY 2906 FROM US 460 TO US 62 DN
(2020CCN) (2022CCR) (2024CCR) RW STP1 5,700,000
UT STP1 1,750,000
CN STP1 9,520,000
Project Cost: 7,450,000 9,520,000 0 0
230 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Scott 80318 PF-9999 Provide a safe and efficient connection PL
between KY 32 (Long Lick Pike) and KY DN SPP 690,000
1143 (Georgetown Bypass). (2024CCN) RW SPP 650,000
UT SPP 380,000
CN SPP 2,790,000
Project Cost: 690,000 650,000 380,000 2,790,000
Scott 80319 CS-1010, Address safety issues on KY 1962 PL
CS-1115, (Lemon's Mill Road) From Military Street in DN SPP 1,000,000
KY-1962 Georgetown to Lisle Road at I-75. RW SPP 1,430,000
(2024CCN) UT SPP 750,000
CN SPP 4,800,000
Project Cost: 1,000,000 1,430,000 750,000 4,800,000
Scott 80414 US-460 Improve roadway capacity & typical PL
section on US 460 from E Main St to 300ft DN NH 750,000
W of Cherry Blossom Way RW NH 2,000,000
UT NH 1,500,000
CN NH 7,000,000
Project Cost: 750,000 2,000,000 1,500,000 7,000,000
Scott 80415 PF-9999 EXTEND LEXUS WAY (KY 3552) FROM PL
CHERRY BLOSSOM WAY (US 62) TO DN
OLD OXFORD ROAD (CS 1414) (NOTE: RW SPP 429,000
$2,043,200 ($1,635,200 FEDERAL UT SPP 400,000
CONGRESSIONAL COMMUNITY PROJECT
CN SPP 15,750,000
Project Cost: 0 429,000 400,000 15,750,000
Total for Scott county PL
DN 3,130,000
RW 5,700,000 4,509,000
UT 1,750,000 3,030,000
CN 6,910,000 9,520,000 30,340,000
Total Amounts: 17,490,000 14,029,000 3,030,000 30,340,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 231
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Shelby 8958 KY-55 WIDEN KY 55X FROM TWO TO FIVE PL
LANES FROM US 60 (MP 0.0) NORTH TO DN SPP 1,650,000
KY 43 (MP 1.354).(16CCN) (2024CCN) RW SPP 220,000
UT SPP 920,000
CN SPP 12,440,000
Project Cost: 1,650,000 220,000 920,000 12,440,000
Shelby 10025 CR-1009 BRIDGE PROJECT IN SHELBY COUNTY ON PL
(106C00007N) CLORE JACKSON RD AT DN BRZ 155,771
FOX RUN RW
UT
CN BRZ 1,038,473
Project Cost: 1,194,244 0 0 0
Shelby 10089 KY-148 BRIDGE PROJECT IN SHELBY COUNTY ON PL
(106B00017N) KY 148 AT GUIST CREEK DN BRX 564,722
RW
UT
CN BRX 3,764,812
Project Cost: 0 0 0 4,329,534
Shelby 80308 KY-55 ADDRESS ACCESS MANAGEMENT AND PL SPP 250,000
SAFETY ISSUES ALONG KY 55X FROM DN SPP 2,090,000
KY 43 TO THE ENTRANCE OF THE RW SPP 200,000
SHELBYVILLE BYPASS (KY 55). UT SPP 816,000
(2024CCN)
CN SPP 16,020,000
Project Cost: 2,340,000 200,000 816,000 16,020,000
Shelby 80312 PF-9999 IMPROVE CONNECTIVITY FROM KY 53 AT PL
THE OLD SEVEN MILE PIKE INTERSECTION DN
TO US 60/ROCKET LANE INTERSECTION. RW SPP 2,000,000
(2024CCN) UT SPP 1,400,000
CN SPP 13,690,000
Project Cost: 0 2,000,000 1,400,000 13,690,000
232 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Shelby 80318 KY-55 ADDRESS SAFETY AND IMPROVE PL
TRAFFIC FLOW WITH OPERATIONAL DN
IMPROVEMENTS ON KY 55 AT OLD RW
BRUNERSTOWN ROAD. THIS PROJECT UT SPP 110,000
WILL CONSIDER A RIGHT-TURN LANE ON
CN SPP 830,000
Project Cost: 110,000 830,000 0 0
Shelby 80319 KY-55 ADDRESS SAFETY AND IMPROVE PL
TRAFFIC FLOW AT THE KY 55/US 60 DN SPP 270,000
INTERSECTION IN SHELBYVILLE. RW SPP 110,000
PROJECT WILL CONSIDER THE ADDITION UT SPP 170,000
OF A RIGHT-TURN LANE SOUTHBOUND
CN SPP 670,000
Project Cost: 1,220,000 0 0 0
Shelby 80326 US-60 CONSTRUCT PEDESTRIAN FACILITIES ON PL
THE NORTH SIDE OF US 60 FROM THE DN
MASONIC HOME TO ROCKET LANE. RW
(2024CCN) UT
CN STP1 1,140,000
Project Cost: 1,140,000 0 0 0
Shelby 80409 KY-55 Address safety, improve roadway PL
geometrics, improve traffic operations, DN
and consider access management on KY RW SPP 305,000
55 from south of Logan Station Road (MP UT SPP 305,000
5.24) to the I-64 interchange (MP 6.03).
CN SPP 6,840,000
Project Cost: 0 305,000 305,000 6,840,000
Shelby 80410 KY-1399 Improve safety, reliability, geometric PL SPP 350,000
deficiencies along KY 1399/Veechdale DN SPP 3,000,000
Road (CR 1231) from KY 1848 to KY 148. RW SPP 3,000,000
UT SPP 2,100,000
CN SPP 22,050,000
Project Cost: 350,000 3,000,000 5,100,000 22,050,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 233
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Shelby 80411 US-60 Reduce Congestion and Improve Safety PL
along US 60 from Discovery Boulevard DN NH 1,240,000
(MP 7.537) to KY 55 (Freedoms Way) (MP RW NH 620,000
8.324). UT NH 620,000
CN NH 13,880,000
Project Cost: 1,240,000 1,240,000 0 13,880,000
Shelby 80425 KY-362 Improve the intersection of KY 1531 PL
(Aiken Road) and KY 362 (Ash DN
Avenue/Aiken Road) RW
UT
CN SPP 2,330,000
Project Cost: 2,330,000 0 0 0
Shelby 80426 KY-362 Address safety and traffic operations on PL
KY 362 (Aiken Road) at Persimmon Ridge DN
Drive (CR 1339) RW
UT
CN SPP 590,000
Project Cost: 590,000 0 0 0
Total for Shelby county PL 600,000
DN 5,405,771 3,000,000 564,722
RW 110,000 3,345,000 3,000,000
UT 280,000 620,000 5,541,000
CN 5,768,473 830,000 88,684,812
Total Amounts: 12,164,244 7,795,000 8,541,000 89,249,534
Simpson 8856 US-31 IMPROVE US-31W FROM KY-1008 TO PL
KY-621. (14CCN)(16CCR) (2020CCR) DN
(2024CCR) RW STPF 4,200,000
UT STPF 8,880,000
CN STPF 13,760,000
Project Cost: 4,200,000 8,880,000 13,760,000 0
234 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Simpson 10046 KY-664 BRIDGE PROJECT IN SIMPSON COUNTY PL
ON (107B00033N) KY-664 AT NEELEY DN BRX 167,953
BRANCH RW
UT
CN BRX 1,119,686
Project Cost: 0 0 1,287,639 0
Simpson 80310 KY-1171 IMPROVE MOBILITY ALONG KY 1171 PL
(NORTH STREET) FROM THE DN SPP 1,290,000
INTERSECTION WITH US 31W TO THE RW SPP 1,690,000
INTERSECTION WITH KY 1008 IN UT SPP 1,620,000
FRANKLIN. (2024CCN)
CN SPP 5,270,000
Project Cost: 1,290,000 3,310,000 5,270,000 0
Simpson 80316 KY-1008 IMPROVE MOBILITY BY COMPLETING THE PL
KY 1008 BYPASS AROUND FRANKLIN. DN SPP 3,410,000
(2024CCN) RW SPP 13,000,000
UT SPP 3,720,000
CN SPP 21,080,000
Project Cost: 3,410,000 16,720,000 21,080,000 0
Simpson 80321 KY-585 IMPROVE SAFETY ON KY 585 AT LICK PL
CREEK FROM MP 3.45 TO 3.75. DN SPP 970,000
(2024CCN) RW SPP 650,000
UT SPP 620,000
CN SPP 2,480,000
Project Cost: 970,000 1,270,000 2,480,000 0
Total for Simpson county PL
DN 5,670,000 167,953
RW 4,200,000 15,340,000
UT 14,840,000
CN 43,709,686
Total Amounts: 9,870,000 30,180,000 43,877,639 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 235
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Spencer 8954.2000 KY-155, Improve safety and traffic operations on PL
KY-55 KY 55 from KY 1169 to KY 155 and on KY DN SPP 780,000
155 from KY 55 to MP 2.0 (total length RW SPP 1,080,000
2.71 miles)(Portion of 5-8954.0). UT SPP 5,070,000
(2024CCN)
CN SPP 20,720,000
Project Cost: 780,000 6,150,000 20,720,000 0
Spencer 8954.3000 KY-55 Improve traffic operations on KY 55 from PL
KY 1169 to KY 155 (MP 10.5 - 11.3) DN SPP 440,000
(Portion of 5-8954.0). (2024CCN) RW SPP 210,000
UT SPP 150,000
CN SPP 2,800,000
Project Cost: 440,000 210,000 150,000 2,800,000
Spencer 10162 KY-1795 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY 1795 OVER BEECH CREEK DN BRZ 668,118
(108B00024N) RW
UT
CN BRZ 4,454,122
Project Cost: 0 0 0 5,122,240
Spencer 80213 KY-55 REDUCE CONGESTION, IMPROVE PL
SAFETY, AND ENHANCE MOBILITY ON DN SPP 250,000
KY 55 FROM KY 44 TO INDUSTRIAL DR. RW
(MP 6.610 TO MP 6.838) (2022CCN) UT SPP 40,000
CN SPP 620,000
Project Cost: 250,000 40,000 620,000 0
Spencer 80254 KY-44 IMPROVE CAPACITY, RELIEVE PL
CONGESTION, AND IMPROVE SAFETY DN SPP 8,630,000
ALONG KY 44 FROM GOOSE CREEK RW SPP 6,750,000
ROAD (CR 1121) TO OAK TREE WAY (CS UT SPP 5,720,000
1053) (MILEPOINT 1.202 TO MILEPOINT
CN SPP 36,810,000
Project Cost: 8,630,000 6,750,000 5,720,000 36,810,000
236 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Spencer 80255 KY-44 IMPROVE CAPACITY, RELIEVE PL
CONGESTION, AND IMPROVE SAFETY DN SPP 1,770,000
ALONG KY 44 FROM COXS LANE (CR RW SPP 1,350,000
1087) NEAR THE BULLITT/SPENCER CO UT SPP 1,140,000
LINE TO GOOSE CREEK ROAD (CR 1121)
CN SPP 6,980,000
Project Cost: 1,770,000 1,350,000 1,140,000 6,980,000
Spencer 80256 KY-55 IMPROVE SAFETY AND TRAFFIC PL
OPERATIONS ON KY 55 FROM KY 44 IN DN SPP 1,720,000
TAYLORSVILLE TO KY 1169 RW SPP 40,000
(NORMANDY ROAD) BY PROVIDING UT SPP 440,000
ADDITIONAL TURNING AND PASSING
CN SPP 6,020,000
Project Cost: 1,720,000 480,000 6,020,000 0
Spencer 80257 KY-55 IMPROVE SAFETY AND TRAFFIC PL
OPERATIONS ON KY 55 FROM KY 155 DN SPP 3,270,000
NEAR ELK CREEK TO KY 148 AT RW SPP 2,280,000
FINCHVILLE. PROJECT LIMITS ARE ON KY UT SPP 1,590,000
55 IN SPENCER COUNTY FROM KY 155
CN SPP 24,830,000
Project Cost: 3,270,000 2,280,000 1,590,000 24,830,000
Spencer 80315 KY-44 ADDRESS SAFETY AND GEOMETRIC PL
ISSUES ON KY 44 AT JUNCTION KY 1251 DN SPP 1,020,000
TO CURVE AFTER HUNTER'S TRACE RW SPP 920,000
ROAD. (2024CCN) UT SPP 820,000
CN SPP 5,760,000
Project Cost: 1,020,000 920,000 820,000 5,760,000
Spencer 80327 US-31 IMPROVE SAFETY AT THE US 31E/KY 523 PL
INTERSECTION. (2024CCN) DN STPF 400,000
RW STPF 400,000
UT STPF 450,000
CN STPF 1,020,000
Project Cost: 400,000 850,000 1,020,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 237
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Spencer county PL
DN 18,280,000 668,118
RW 13,030,000
UT 6,000,000 9,420,000
CN 28,380,000 81,634,122
Total Amounts: 18,280,000 19,030,000 37,800,000 82,302,240
Statewide 65.1900 CO-0 BRIDGE REPAIRS ON VARIOUS BRIDGES PL
FOR FY 2026 THROUGH FY 2032. DN
(2024CCR) RW
UT
CN BRO 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 65.2000 CO-0 BRIDGE REPAIRS ON VARIOUS BRIDGES PL
FOR FY 2026 THROUGH FY 2032. DN
(2024CCR) RW
UT
CN BRX 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost: 1,000,000 1,000,000 1,000,000 1,000,000
Statewide 65.2100 CO-0 BRIDGE REPAIRS ON VARIOUS OFF PL
SYSTEM BRIDGES FOR FY 2026 DN
THROUGH FY 2032. (2024CCR) RW
UT
CN BRZ 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost: 1,000,000 1,000,000 1,000,000 1,000,000
Statewide 65.2200 CO-0 BRIDGE REPAIRS ON VARIOUS BRIDGES PL
FOR FY 2026-2032. (FBP PROGRAM) DN
(2024CCR) RW
UT
CN FBP 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
238 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Statewide 65.2300 CO-0 BRIDGE REPAIRS ON VARIOUS BRIDGES PL
FOR FY 2026-2032. (FBP2 PROGRAM) DN
RW
UT
CN FBP2 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost: 2,000,000 2,000,000 2,000,000 2,000,000
Statewide 66.1900 CO-0 'ITS' AND 'TSMO' ACTIVITIES ON VARIOUS PL
NHS ROUTES IN KENTUCKY FOR FY 2027 DN
THROUGH FY 2032. (2024CCR) RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 66.2100 CO-0 Transportation Systems Management and PL
Operations (TSMO) activities on various DN
routes for FY-2022 through FY 2028. RW
(2024CCR) UT
CN SPP 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost: 2,000,000 2,000,000 2,000,000 2,000,000
Statewide 195.1600 CO-0 STATEWIDE TRANSPORTATION PL
ALTERNATIVES PROGRAM FOR FY 2026 DN
THROUGH FY 2032 (2024CCR) RW
UT
CN TAP 12,300,000 12,300,000 12,300,000 12,300,000
Project Cost: 12,300,000 12,300,000 12,300,000 12,300,000
Statewide 219.1800 CO-0 NON-ATTAINMENT AREAS STATEWIDE PL
CMAQ FUNDED PROJECTS FOR FY 2026 DN
THROUGH FY 2032. (2024CCR) RW
UT
CN CM 8,100,000 8,100,000 8,100,000 8,100,000
Project Cost: 8,100,000 8,100,000 8,100,000 8,100,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 239
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Statewide 224.1400 CO-0 PAVEMENT REHAB ON STATE (NON RS) PL
SYSTEM ROUTES IN KENTUCKY FOR FY DN
2026 THROUGH FY 2032. (2024CCR) RW
UT
CN STP5 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 233 CO-0 INSTALLATION OF HIGH MAST LIGHTING PL
AT THE I-24 REST AREA IN CHRISTIAN DN
COUNTY, KENTUCKY. (2024BOP) RW
UT
CN SPP 1,040,000
Project Cost: 1,040,000 0 0 0
Statewide 239 CO-0 PROMOTING RESILIENT OPERATIONS FOR PL
TRANSFORMATIVE, EFFICIENT, AND DN
COST SAVING TRANSPORTATION RW
(PROTECT) PROGRAM FORMULA FUNDS. UT
CN PROT 5,000,000 5,000,000
Project Cost: 0 5,000,000 0 5,000,000
Statewide 244 CO-0 STATEWIDE CARBON REDUCTION PL
PROGRAM. DN
RW
UT
CN CARB 14,600,000 14,600,000 14,600,000 14,600,000
Project Cost: 14,600,000 14,600,000 14,600,000 14,600,000
Statewide 327.1600 CO-0 STATEWIDE BRIDGE INSPECTION FOR FY PL
2026 THROUGH FY 2032. (2024CCR) DN
RW
UT
CN BRX 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
240 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Statewide 337.1500 CO-0 STATEWIDE I-STATE ROUTES FOR FY PL
2026 THROUGH FY 2032. (2024CCR) DN
RW
UT
CN NHPM 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 346.1600 CO-0 STATEWIDE OFF-SYSTEM BRIDGE PL
INSPECTION FOR FY 2026 THROUGH FY DN
2032. (2024CCR) RW
UT
CN BRZ 3,000,000 3,000,000 3,000,000 3,000,000
Project Cost: 3,000,000 3,000,000 3,000,000 3,000,000
Statewide 352.1600 CO-0 RAILWAY-HIGHWAY CROSSINGS PL
PROGRAM ON VARIOUS ROUTES FOR FY DN
2026 THROUGH FY 2032. (2024CCR) RW
UT
CN RRP 3,140,000 4,220,000 4,220,000 4,220,000
Project Cost: 3,140,000 4,220,000 4,220,000 4,220,000
Statewide 369.1000 CO-0 PAVEMENT REHABILITATION FOR PL
VARIOUS NHS ROUTES IN KENTUCKY DN
FOR FY 2026 THROUGH FY 2032. RW
(2024CCR) UT
CN NHPM 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 388.1000 CO-0 OHIO RIVER BRIDGES FRACTURE PL
CRITICAL FOR FY 2026 THROUGH FY DN
2032. (2024CCR) RW
UT
CN BRX 4,000,000 4,000,000 4,000,000 4,000,000
Project Cost: 4,000,000 4,000,000 4,000,000 4,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 241
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Statewide 391.0600 CO-0 STATEWIDE HIGHWAY PROJECT DESIGN PL
ACTIVITIES FOR FY 2026 THROUGH FY DN STPF 1,000,000 1,000,000 1,000,000 1,000,000
2032. (2024CCR) RW
UT
CN
Project Cost: 1,000,000 1,000,000 1,000,000 1,000,000
Statewide 391.0700 CO-0 STATEWIDE HIGHWAY PROJECT DESIGN PL
ACTIVITIES FOR FY 2022 THROUGH FY DN SPP 5,000,000 5,000,000 5,000,000 5,000,000
2028. (2024CCR) RW
UT
CN
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 400.0700 CO-0 UPGRADE NAVIGATIONAL LIGHTING FOR PL
BRIDGES OVER MAJOR STREAMS AND DN
WATERWAYS FOR FY 2026 THROUGH RW
FY 2032. (2024CCR) UT
CN BRX 500,000 500,000 500,000 500,000
Project Cost: 500,000 500,000 500,000 500,000
Statewide 510.0500 CO-0 HONORING BORDER STATES PL
COMMITMENTS FOR EXISTING DN
BRIDGES(CANNOT BE MOVED) FOR FY RW
2026 THROUGH FY 2032. (2024CCR) UT
CN BRX 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost: 2,000,000 2,000,000 2,000,000 2,000,000
Statewide 511.0400 CO-0 STATEWIDE CORRECTIONS OF ROCK PL
FALL OR EMBANKMENT STABILIZATION DN
FOR FY 2022 THROUGH FY 2028. RW
(2024CCR) UT
CN SPP 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost: 1,000,000 1,000,000 1,000,000 1,000,000
242 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Statewide 514.0100 CO-0 PREVENTATIVE MAINTENANCE FOR PL
BRIDGE STRUCTURES FOR FY 2026 DN
THROUGH FY 2032. (2024CCR) RW
UT
CN BRX 2,500,000 2,500,000 2,500,000 2,500,000
Project Cost: 2,500,000 2,500,000 2,500,000 2,500,000
Statewide 518.0100 CO-0 STATEWIDE CORRECTIONS OF PL
ROCKFALL OR EMBANKMENT DN
STABILIZATION ON NH ROUTES FOR FY RW
2026 THROUGH FY 2032. (2020CCR) UT
(2024CCR)
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 518.0300 CO-0 STATEWIDE CORRECTIONS OF PL
ROCKFALL OR EMBANKMENT DN
STABILIZATION ON NON NH ROUTES FOR RW
FY 2026 THROUGH FY 2032. (2024CCR) UT
CN STPF 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 600 CO-0 Statewide NHS Rest Area Repairs. PL
(2024CCR) DN
RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 600.1000 CO-0 STATEWIDE NHS REST AREA / WELCOME PL
CENTERS / WEIGH STATION REPAIRS. DN
(2024CCR) RW
UT
CN SPP 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 243
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Statewide 601 CO-0 Additional Parking at NHS Rest Area and PL
Weigh Stations. (2024CCR) DN
RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 610 CO-0 ADDRESS SAFETY IMPROVEMENT NEEDS PL
FOR STATE-OWNED DAMS DN
CONSTRUCTED TO FACILIATE RW
KENTUCKY'S HIGHWAY SYSTEM. UT
CN SPP 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Statewide 611 CO-0 PLANNING FUNDS TO SCOPE PROJECTS PL SPP 2,500,000 2,500,000 2,500,000 2,500,000
FOR CONSIDERATION IN FUTURE DN
HIGHWAY PLANS. RW
UT
CN
Project Cost: 2,500,000 2,500,000 2,500,000 2,500,000
Statewide 911.0900 CO-0 STATEWIDE SAFETY PROGRAM FOR FY PL
2026 THROUGH FY 2032. (HSIP) DN
(2024CCR) RW
UT
CN SAF 71,300,000 71,300,000 71,300,000 71,300,000
Project Cost: 71,300,000 71,300,000 71,300,000 71,300,000
Statewide 911.5000 CO-0 STATEWIDE SAFETY FUNDING TO BE PL
USED ALONGSIDE FEDERAL HSIP DN
FUNDING TO ENHANCE ROADWAY RW
SAFETY IN KENTUCKY. (2022CCR) UT
CN SPP 2,500,000 2,500,000 2,500,000 2,500,000
Project Cost: 2,500,000 2,500,000 2,500,000 2,500,000
244 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Statewide 1063.1600 CO-0 STATEWIDE UNDERWATER BRIDGE PL
INSPECTION FOR FY 2026 THROUGH FY DN
2032. (2024CCR) RW
UT
CN BRX 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost: 1,000,000 1,000,000 1,000,000 1,000,000
Statewide 1071.0800 CO-0 STATEWIDE PROGRAM TO FUND BRIDGE PL
SCOUR COUNTER-MEASURES FOR DN
STATE-MAINTAINED BRIDGES FOR FY RW
2026 THROUGH FY 2032. (2024CCR) UT
CN BRX 3,000,000 3,000,000 3,000,000 3,000,000
Project Cost: 3,000,000 3,000,000 3,000,000 3,000,000
Statewide 1074.0800 CO-0 STATEWIDE BRIDGE REPLACEMENT PL
PROGRAM FOR FY 2026 THROUGH FY DN
2032. (2024CCR) RW
UT
CN BRX 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost: 1,000,000 1,000,000 1,000,000 1,000,000
Statewide 2700.1400 CO-0 PAVEMENT PREVENTATIVE PL
MAINTENANCE PROGRAM FOR FY 2026 DN
THROUGH FY 2032 STP5 FUNDING. RW
(2024CCR) UT
CN STP5 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost: 2,000,000 2,000,000 2,000,000 2,000,000
Statewide 3011.0100 CO-0 AMERICANS WITH DISABILITIES ACT PL
(ADA) TRANSITION PLAN DN
IMPLEMENTATION PROJECTS FY 2026 RW
THROUGH FY 2032. (2024CCR) UT
CN STPF 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 245
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Statewide 8500.1600 CO-0 SCHOOL TURN LANE PROJECTS FOR PL
NEW SCHOOLS FOR FY 2022 THROUGH DN
FY 2028. (2022CCR) (2024CCR) RW
UT
CN SPP 2,500,000 2,500,000 2,500,000 2,500,000
Project Cost: 2,500,000 2,500,000 2,500,000 2,500,000
Statewide 8601 CO-0 ADVANCE CONSTRUCTION PL
COMMITMENTS FOR MOUNTAIN DN
PARKWAY EXPANSION; I-65 CENTRAL RW
CORRIDOR; AND OTHER ACTIVE UT
DESIGN/BUILD PROJECTS.
CN NH 31,000,000 31,000,000 31,000,000 31,000,000
Project Cost: 31,000,000 31,000,000 31,000,000 31,000,000
Statewide 9660 CO-0 GARVEE BOND DEBT SERVICE PL
PAYMENTS FOR THE BRENT SPENCE DN
BRIDGE PROJECT AND THE I-69 ORX RW
BRIDGE PROJECT. UT
CN GAR 38,600,000 38,600,000 38,600,000 38,600,000
Project Cost: 38,600,000 38,600,000 38,600,000 38,600,000
Total for Statewide county PL 2,500,000 2,500,000 2,500,000 2,500,000
DN 6,000,000 6,000,000 6,000,000 6,000,000
RW
UT
CN 281,080,000 286,120,000 281,120,000 286,120,000
Total Amounts: 289,580,000 294,620,000 289,620,000 294,620,000
Taylor 443 KY-70 IMPROVE SAFETY, ACCESS, PL
GEOMETRICS AND DRAINAGE ON KY-70 DN SPP 1,680,000
IN CAMPBELLSVILLE FROM US-68 TO RW SPP 3,130,000
COUNTRY VIEW COURT (CS-1305) UT
CN
Project Cost: 1,680,000 3,130,000 0 0
246 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Taylor 80154.3000KY-210 ADDRESS SAFETY ON KY 210 FROM PL
JUST EAST OF CORINTH CHURCH DN
(MP0.60) TO KY 883 (MP14.20) IN RW SPP 2,880,000
TAYLOR COUNTY. (2024CCN) UT SPP 5,520,000
CN SPP 46,000,000
Project Cost: 8,400,000 0 0 46,000,000
Taylor 80256 KY-70 ADDRESS SAFETY AND GEOMETRIC PL
DEFICIENCIES ALONG KY 70 FROM 0. DN SPP 840,000
MILES EAST OF ROBERTS RD (NEAR RW SPP 1,880,000
ELKHORN BAPTIST CHURCH) TO NEAR UT
KY 76 (MILEPOINT 3.1 TO MILEPOINT 4.1)
CN
Project Cost: 840,000 0 1,880,000 0
Taylor 80257 KY-3350, EXTEND KY 3350 (CAMPBELLSVILLE PL
PF-9999 BYPASS) FROM ky 289 TO US 68 ON THE DN
EAST SIDE OF CAMPBELLSVILLE. RW SPP 3,450,000
(2022CCN) (2024CCR) UT SPP 1,800,000
CN SPP 13,000,000
Project Cost: 0 3,450,000 1,800,000 13,000,000
Taylor 80420 KY-658 ADDRESS CONGESTION AND SAFETY PL
ALONG KY 658 AND KY 3518 IN DN
CAMPBELLSVILLE BETWEEN US 68 AND RW SPP 3,000,000
KY 70 AND IMPROVE THE INTERSECTION UT SPP 1,500,000
AT US 68. (MP 0-0.665)
CN SPP 6,000,000
Project Cost: 3,000,000 1,500,000 6,000,000 0
Taylor 80421 KY-210 Address congestion and improve PL
intersections along KY 210 in DN
Campbellsville from Arbor Lane to US 68. RW SPP 1,500,000
(MP 15.669-16.626) UT SPP 1,500,000
CN SPP 10,000,000
Project Cost: 0 1,500,000 1,500,000 10,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 247
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Total for Taylor county PL
DN 2,520,000
RW 5,880,000 8,080,000 1,880,000
UT 5,520,000 1,500,000 3,300,000
CN 6,000,000 69,000,000
Total Amounts: 13,920,000 9,580,000 11,180,000 69,000,000
Todd 170 KY-848 Upgrade connection for new industrial site PL
on KY 848 (Haddensville Road). DN
(2024CCR) RW
UT
CN SPP 5,220,000
Project Cost: 0 0 0 5,220,000
Todd 80402 US-79 Widen US 79 from MP 3.0 to Logan County PL
line. (Estimates based on preliminary DN
engineering. Design funds allocated under RW
Logan Co. Item No. 03-80050) UT
CN NH 25,800,000
Project Cost: 25,800,000 0 0 0
Todd 80422 KY-181 Improve safety and access on KY 181 PL
from US 421 to Elkton city limits (MP DN
0.21-10.955) RW SPP 16,000,000
UT SPP 7,900,000
CN SPP 31,600,000
Project Cost: 0 16,000,000 7,900,000 31,600,000
Total for Todd county PL
DN
RW 16,000,000
UT 7,900,000
CN 25,800,000 36,820,000
Total Amounts: 25,800,000 16,000,000 7,900,000 36,820,000
248 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Trigg 22010 I -24 ADDRESS CONDITION OF I-024 FROM PL
MILEPOINT 64.472 TO MILEPOINT 69.83 DN NHPM 1,200,000
RW
UT
CN NHPM 12,000,000
Project Cost: 0 0 0 13,200,000
Trigg 80306 CR-1005 ADDRESS SAFETY CONCERNS ON PL
GLENWOOD RD (CR-1005) FROM KY 272 DN
TO US 68/80 FROM MP 0.0 TO MP 2.1 RW SPP 750,000
(2024CCN) UT SPP 500,000
CN SPP 7,000,000
Project Cost: 0 750,000 500,000 7,000,000
Trigg 80307 CR-1014 ADDRESS SAFETY CONCERNS ON KINGS PL
CHAPEL RD (CR-1004) FROM KY 272 TO DN SPP 1,560,000
US 68/80 FROM MP 0.0 TO MP 3.7 RW SPP 2,000,000
(2024CCN) UT SPP 1,500,000
CN SPP 10,000,000
Project Cost: 1,560,000 2,000,000 1,500,000 10,000,000
Trigg 80313 KY-276 "IMPROVE KY 276 FROM KY139 (MP 0.00) PL
TO US68 (MP 14.121). THIS NARROW 2 DN SPP 3,800,000
LANE ROAD SERVES AS A BY-PASS RW SPP 1,125,000
WHEN I-24 IS SHUTDOWN NEAR CADIZ, UT SPP 2,800,000
KY. CORRIDOR IMPROVEMENTS,
CN SPP 25,000,000
Project Cost: 3,800,000 3,925,000 0 25,000,000
Trigg 80318 KY-276 IMPROVE KY 276 FROM KY139 (MP 0.00) PL
TO US68 (MP 14.121). THIS NARROW 2 DN SPP 3,800,000
LANE ROAD SERVES AS A BY-PASS RW
WHEN I-24 IS SHUTDOWN NEAR CADIZ, UT
KY. CORRIDOR IMPROVEMENTS,
CN
Project Cost: 3,800,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 249
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Trigg 80402 KY-139 On KY 139 south of US 68 Bypass PL
address flooding concerns and narrow DN SPP 1,500,000
lanes that creates a safety problems for RW SPP 1,000,000
over size vehicles and farm equipment. UT SPP 1,500,000
CN SPP 7,000,000
Project Cost: 1,500,000 2,500,000 7,000,000 0
Total for Trigg county PL
DN 10,660,000 1,200,000
RW 4,875,000
UT 4,300,000 2,000,000
CN 7,000,000 54,000,000
Total Amounts: 10,660,000 9,175,000 9,000,000 55,200,000
Trimble 905 US-421 ADDRESS SAFETY ISSUES AND ACCESS PL
AT THE INTERSECTION OF DN STP2 350,000
US-421/KY-1226 AT MP 11.5. (12CCR) RW STP2 830,000
(2020CCR) (2024CCR) UT STP2 640,000
CN STP2 1,250,000
Project Cost: 350,000 1,470,000 1,250,000 0
Trimble 10164 CR-1301 ADDRESS DEFICIENCIES OF BRIDGE ON PL
JOYCE MILLS RD OVER TRIB TO CORN DN BRZ 107,000
CREEK (112C00034N) RW
UT
CN BRZ 711,000
Project Cost: 0 0 0 818,000
Trimble 80309 KY-36 IMPROVE SAFETY, TRUCK MOBILITY, PL
AND ADDRESS GEOMETRIC DEFICIENCIES DN SPP 500,000
ALONG KY 36 FROM US 421 TO 250 FEET RW SPP 1,000,000
EAST OF SCHOOL HOLLOW ROAD IN UT SPP 250,000
MILTON. (2024CCN)
CN SPP 1,875,000
Project Cost: 500,000 1,000,000 250,000 1,875,000
250 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Trimble 80337 US-421 CONSTRUCT PEDESTRIAN FACILITIES PL
ALONG US 421 FROM CUTSHAW LANE DN
TO TRIMBLE COUNTY HIGH SCHOOL/KY RW SPP 110,000
625 AND ALONG KY 625 TO BEDFORD UT SPP 70,000
ELEMENTARY SCHOOL (TOTAL 0.983 MI.)
CN SPP 1,440,000
Project Cost: 0 110,000 70,000 1,440,000
Trimble 80414 I-71 Improve safety and reduce congestion on PL
I-71 from the Henry/Trimble County line to DN
the Trimble/Carroll County line. RW NH 100,000
UT NH 100,000
CN NH 7,200,000
Project Cost: 200,000 7,200,000 0 0
Trimble 80415 US-421 Construct a realignment of US 421 through PL
Milton between the Milton-Madison Bridge DN SPP 2,388,000
(MP 18.78) and extending south to RW SPP 10,604,000
reconnect to the existing US 421 near MP UT SPP 1,903,000
15.45.
CN SPP 46,815,000
Project Cost: 2,388,000 10,604,000 1,903,000 46,815,000
Total for Trimble county PL
DN 3,238,000 107,000
RW 100,000 12,544,000
UT 100,000 640,000 2,223,000
CN 7,200,000 1,250,000 50,841,000
Total Amounts: 3,438,000 20,384,000 3,473,000 50,948,000
Union 10177 KY-56 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-56 OVER OHIO RIVER AT DN BRX 150,000
SHAWNEETOW (113B00045N) RW
UT
CN BRX 1,000,000
Project Cost: 1,150,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 251
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Union 80202 US-60 Address safety and service concerns of PL
US-60 from the KY-950 to KY-492. DN
(2022CCN) RW STP2 3,500,000
UT STP2 8,000,000
CN STP2 10,000,000
Project Cost: 3,500,000 8,000,000 10,000,000 0
Union 80203 KY-56 Address the service, safety and condition PL
of KY 56 from Morganfield to KY 141. DN
(2022CCN) (2024CCR) RW SPP 3,680,000
UT SPP 3,800,000
CN SPP 20,237,000
Project Cost: 3,680,000 3,800,000 20,237,000 0
Union 80314 US-60 Reconstruct US 60 from Waverly to PL
Corydon (2024CCN) DN
RW STP2 2,000,000
UT STP2 2,000,000
CN STP2 7,000,000
Project Cost: 2,000,000 2,000,000 7,000,000 0
Union 80315 US-60 Reconstruct US 60 from the Morganfield PL
Bypass to Waverly. (2024CCN) DN
RW STP2 3,500,000
UT STP2 3,000,000
CN STP2 12,500,000
Project Cost: 0 3,500,000 3,000,000 12,500,000
Total for Union county PL
DN 150,000
RW 9,180,000 3,500,000
UT 13,800,000 3,000,000
CN 1,000,000 37,237,000 12,500,000
Total Amounts: 10,330,000 17,300,000 40,237,000 12,500,000
252 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Warren 20 I -65 COMPLETE I65/US68 (GLASGOW PL
ROAD)DIAMOND INTERCHANGE BY DN
ADDING NORTHBOUND ON-RAMP AND RW NH 530,000
SOUTHBOUND OFF-RAMP. (2024CCR) UT NH 1,655,000
CN NH 9,100,000
Project Cost: 530,000 1,655,000 9,100,000 0
Warren 110.4000 KY-185 IMPROVE KY 185 FROM 0.32 MILES PL
SOUTH OF THE AUSTIN RAYMER ROAD DN
TO 0.08 MILES SOUTH OF THE BRIDGE RW SPP 800,000
OVER IVY CREEK. (2018BOP) (2022CCR) UT SPP 680,000
CN SPP 10,150,000
Project Cost: 1,480,000 10,150,000 0 0
Warren 182 KY-622 RECONSTRUCT KY 622 (PLANO RD) TO PL
ELIMINATE TWO RIGHT-ANGLE CURVES. DN
(2022CCR) (2024CCR) RW SPP 2,880,000
UT SPP 2,720,000
CN SPP 5,200,000
Project Cost: 2,880,000 2,720,000 0 5,200,000
Warren 212 US-31 CONSTRUCT A DOUBLE CROSSOVER PL
DIAMOND (DCD) ON US-31W AT THE DN STP1 1,500,000
I-165 INTERCHANGE IN BOWLING GREEN. RW
UT
CN
Project Cost: 1,500,000 0 0 0
Warren 8854 KY-234 MAJOR WIDENING/RECONSTRUCTION OF PL
CEMETERY ROAD (KY-234) FROM DN
FOUNTAIN TRACE TO ROGER PORTER RW SPP 5,400,000
ROAD (MP 7.878 TO MP 9.625).(14CCN) UT SPP 4,800,000
(2020CCN) (2022CCR) (2024CCR)
CN SPP 6,380,000
Project Cost: 5,400,000 4,800,000 6,380,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 253
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Warren 10049 KY-185 BRIDGE PROJECT IN WARREN COUNTY PL
ON (114B00003N) KY-185 AT BARREN DN BRX 1,448,144
RIVER RW
UT
CN BRX 9,654,291
Project Cost: 0 0 11,102,435 0
Warren 10051 US-68 BRIDGE PROJECT IN WARREN COUNTY PL
ON (114B00076N) KY-880 AT JENNINGS DN BRX 92,466
CREEK RW
UT
CN BRX 924,665
Project Cost: 1,017,131 0 0 0
Warren 10052 I -65 BRIDGE PROJECT IN WARREN COUNTY PL
ON (114B00095N) I-65 AT BARREN RIVER DN BRO 2,785,992
RW
UT
CN BRO 18,573,282
Project Cost: 0 0 21,359,274 0
Warren 22132 I -165 ADDRESS CONDITION OF I-165 FROM PL
MILEPOINT 0.521 TO MILEPOINT 7.121 DN STP5 500,000
RW
UT
CN STP5 5,017,600
Project Cost: 5,517,600 0 0 0
Warren 80051 KY-3225 SAFETY IMPROVEMENTS AND PL
REHABILITATION ON KY-3225. KEEP DN
EXISTING FOOTPRINT BY REPLACING RW SPP 1,420,000
CURBLINE IN SAME LOCATION FROM MP UT SPP 130,000
0 TO MP 1(18CCN) (2022CCR)
CN SPP 1,460,000
Project Cost: 1,420,000 130,000 1,460,000 0
254 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Warren 80201 CR-1704, Reduce congestion and increase safety PL
CS-1432, on Cave Mill Road/Dishman Lane from the DN
CS-2281 end of the three-lane section near RW
Raintree Drive (MP 0.570) just east of UT SPP 6,450,000
Grider Pond Road. (2022CCN) (2024CCR)
CN SPP 12,400,000
Project Cost: 0 6,450,000 0 12,400,000
Warren 80214 KY-101 Construct a two-lane roundabout at the PL
intersection of KY 101 and the I-65 DN
southbound entrance and exit ramps in RW
Smiths Grove. Widen the existing I-65 UT SPP 2,710,000
southbound exit ramp to two lanes and
CN SPP 5,176,000
Project Cost: 2,710,000 5,176,000 0 0
Warren 80301 CS-1334 MINOR WIDENING OF CS-1344/CR1235 PL
(SMALLHOUSE RD) FROM ELROD RD TO DN
US 231 (CAMPBELL LANE). SCOPE RW SPP 6,500,000
INCLUDES INTERSECTION UT SPP 6,200,000
IMPROVEMENTS, CONTINUOUS CENTER
CN SPP 9,920,000
Project Cost: 0 6,500,000 6,200,000 9,920,000
Warren 80302 US-31 IMPROVE SAFETY AND MOBILITY ON US PL
31W FROM FREEPORT ROAD TO KY 101. DN NH 1,940,000
(2024CCN) RW NH 7,150,000
UT NH 7,440,000
CN NH 23,560,000
Project Cost: 1,940,000 0 14,590,000 23,560,000
Warren 80304 KY-101 IMPROVE SAFETY AND MOBILITY ON KY PL
101 BETWEEN THE ALLEN COUNTY LINE DN SPP 970,000
AND I 65. (2024CCN) RW SPP 1,630,000
UT SPP 2,480,000
CN SPP 9,920,000
Project Cost: 970,000 4,110,000 0 9,920,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 255
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Warren 80305 KY-622 IMPROVE SAFETY AND MOBILITY ON KY PL
622 FROM I 165 TO US 231. (2024CCN) DN SPP 1,290,000
RW SPP 2,600,000
UT SPP 3,720,000
CN SPP 6,820,000
Project Cost: 1,290,000 2,600,000 3,720,000 6,820,000
Warren 80307 US-31 IMPROVE SAFETY AND MOBILITY ON US PL
31W FROM KY 3225 TO KY 957, DN NH 1,940,000
INCLUDING THE RECONSTRUCTION OF RW NH 6,500,000
THE INTERCHANGE WITH KY 446. UT NH 7,440,000
(2024CCN)
CN NH 14,880,000
Project Cost: 1,940,000 13,940,000 0 14,880,000
Warren 80311 US-31 CONSTRUCT DUAL-LANE ROUNDABOUT PL
AT BROADWAY AVE AND US 31W DN STP1 3,120,000
BYPASS. (2024CCN) RW STP1 10,000,000
UT STP1 5,000,000
CN STP1 5,000,000
Project Cost: 3,120,000 10,000,000 5,000,000 5,000,000
Warren 80320 US-68 MODERNIZE US 68 BETWEEN VICTORIA PL
STREET AND CLAY STREET. (2024CCN) DN
RW NH 330,000
UT NH 1,240,000
CN NH 1,860,000
Project Cost: 330,000 1,240,000 1,860,000 0
Warren 80322 I -65 IMPROVE SAFETY AND MOBILITY ON KY PL
234 AT I 65, INCLUDING THE DN NH 1,940,000
RECONSTRUCTION OF THE RW NH 330,000
INTERCHANGE. (2024CCN) UT NH 310,000
CN NH 3,720,000
Project Cost: 1,940,000 330,000 310,000 3,720,000
256 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Warren 80326 PF-9999 SCOPING STUDY FOR OUTER BELTLINE PL
EXTENDING KY 3145 TO NORTHERN DN STPF 7,500,000
WARREN COUNTY. (2024CCN) RW
UT
CN
Project Cost: 7,500,000 0 0 0
Warren 80327 US-68 MAJOR WIDENING OF 68X PL
(RUSSELLVILLE RD) INCLUDING DN NH 2,600,000
CONSTRUCTION OF ROUNDABOUTS AT RW NH 3,900,000
INTERSECTIONS WITH MORGANTOWN RD UT NH 5,800,000
AND UNIVERSITY BLVD. SCOPE
CN NH 11,160,000
Project Cost: 2,600,000 9,700,000 11,160,000 0
Warren 80328 CR-1240 CONSTRUCT NEW INTERCHANGE ON PL
I-165 (NATCHER EXPRESSWAY) AT DN SPP 1,300,000
ELROD ROAD. INCLUDES NEW RW SPP 11,900,000
CONSTRUCTION FOR SEGMENTS OF UT SPP 10,620,000
ELROD ROAD AND MINOR WIDENING OF
CN SPP 31,580,000
Project Cost: 1,300,000 11,900,000 10,620,000 31,580,000
Warren 80404 CR-1266 Improve safety and mobility on Dillard PL
Road (CR 1266) from US 31W (Nashville DN SPP 1,146,000
Road) to Neal Howell Road (CR 1241). RW SPP 3,766,600
UT SPP 5,850,000
CN SPP 12,540,000
Project Cost: 1,146,000 3,766,600 5,850,000 12,540,000
Warren 80410 KY-242 Reconstruct KY 242 to improve sight PL
distance at the intersections of Dismon DN SPP 350,000
Stone Rd, Upper Gable Way, and RW SPP 200,000
Southaven Blvd. UT SPP 500,000
CN SPP 600,000
Project Cost: 350,000 700,000 600,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 257
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Warren 80423 KY-240 Reconstruct KY 240 from US 68 to US PL
31W including intersection improvements DN SPP 4,200,000
at US 68 and an improved connection to RW SPP 8,000,000
Tri-County Industrial Park (MP 0.0-4.5) UT SPP 6,000,000
CN SPP 30,000,000
Project Cost: 0 4,200,000 14,000,000 30,000,000
Total for Warren county PL
DN 26,188,466 4,200,000 4,234,136
RW 11,360,000 47,326,600 15,150,000
UT 3,390,000 33,215,000 45,140,000
CN 5,942,265 15,326,000 58,787,573 165,540,000
Total Amounts: 46,880,731 100,067,600 123,311,709 165,540,000
Washington 164.2000 KY-555 IMPROVE MOBILITY ON THE KY 555 PL
HEARTLAND PARKWAY CORRIDOR DN
FROM KY 53 TO BLUEGRASS PARKWAY RW
(2022CCN) (2024CCR) UT
CN NH 14,440,000
Project Cost: 14,440,000 0 0 0
Washington 396.3000 US-150 ADDRESS SAFETY, MOBILITY, AND PL
GEOMETRIC ISSUES ALONG US 150 IN DN
WASHINGTON COUNTY FROM 0.7 MILES RW
EAST OF GRUNDY HOME ROAD UT
(MILEPOINT 2.50) TO US 150X (MP 6.557)
CN STPF 11,520,000
Project Cost: 11,520,000 0 0 0
Washington 20043 US-150 ADDRESS CONDITION OF US-150 FROM PL
MILEPOINT 7.6 TO MILEPOINT 7.9 DN STP4 60,000
RW
UT
CN STP4 690,000
Project Cost: 0 750,000 0 0
258 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Washington 80352 KY-152 Address geometric deficiencies along KY PL
152 from US 150 (MP 8.815) to MP. 9.9 . DN SPP 1,400,000
(2024CCN) RW SPP 940,000
UT SPP 2,170,000
CN
Project Cost: 1,400,000 0 3,110,000 0
Total for Washington county PL
DN 1,400,000 60,000
RW 940,000
UT 2,170,000
CN 25,960,000 690,000
Total Amounts: 27,360,000 750,000 3,110,000 0
Wayne 10073 CR-1006 BRIDGE PROJECT IN WAYNE COUNTY ON PL
(116C00042N) EAST RALEIGH CREEK AT DN BRZ 113,769
RALEIGH CREEK RW
UT
CN BRZ 758,460
Project Cost: 0 0 872,229 0
Wayne 20022 KY-90 ADDRESS CONDITION OF KY-90 FROM PL
MILEPOINT 12.29 TO MILEPOINT 12.872 DN STP5 240,000
RW
UT
CN STP5 2,760,000
Project Cost: 0 0 0 3,000,000
Wayne 22374 KY-90 ADDRESS CONDITION OF KY-90 FROM PL
MILEPOINT 12.9 TO MILEPOINT 17.7 DN STP5 320,000
RW
UT
CN STP5 3,680,000
Project Cost: 0 0 4,000,000 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 259
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Wayne 80105 KY-90 REDUCE CONGESTION AND IMPROVES PL
SAFETY, CAPACITY AND MOBILITY OF DN
KY 90 BETWEEN KY 90X/KY 1275 AND RW
KY 3106 (2020CCN) (2022CCR) UT SPP 2,400,000
(2024CCR)
CN SPP 17,500,000
Project Cost: 2,400,000 17,500,000 0 0
Wayne 80308 KY-1765 Improve safety and mobility along KY 1765 PL SPP 200,000
between KY 1275 and end of state DN SPP 630,000
maintenance near Conley Bottom boat RW SPP 3,520,000
dock. (2024CCN) UT SPP 2,020,000
CN SPP 10,210,000
Project Cost: 830,000 3,520,000 2,020,000 10,210,000
Wayne 80309 KY-90 MINOR WIDENING BY ADDING OFFSET PL
LEFT TURNING LANES INTO KY 1568 AND DN
FRAZER CHAPEL ROAD. (2024CCN) RW SPP 180,000
UT SPP 240,000
CN SPP 1,040,000
Project Cost: 420,000 1,040,000 0 0
Wayne 80314 KY-92 IMPROVE VERTICAL GEOMETRICS PL
ALONG KY 92 NEAR KY 789 TO IMPROVE DN
SIGHT DISTANCE. ADD TURNING LANES RW SPP 2,150,000
AND MINOR WIDENING FROM ALONG KY UT SPP 2,020,000
92 FROM 789 TO KY 90. (2024CCI)
CN SPP 19,720,000
Project Cost: 0 2,150,000 2,020,000 19,720,000
Wayne 80408 KY-90 Improve mobility and safety along KY 90 at PL
KY 3284 / KY 90X and widen approach DN
routes approximately 1500 feet on each RW SPP 200,000
side of KY 90 in Monticello. UT SPP 240,000
CN SPP 1,800,000
Project Cost: 440,000 1,800,000 0 0
260 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Wayne 80409 KY-90 Improve mobility, safety and access PL SPP 260,000
management along KY 90X from Dugan DN
Street to KY 90 E intersection. RW
UT
CN
Project Cost: 260,000 0 0 0
Wayne 80410 KY-90 Address mobility and safety along KY 90 PL
From Gregory Street to Hospital Street in DN SPP 294,300
Monticello RW SPP 523,200
UT SPP 523,200
CN SPP 2,943,000
Project Cost: 294,300 523,200 523,200 2,943,000
Total for Wayne county PL 460,000
DN 924,300 433,769 240,000
RW 380,000 6,193,200
UT 2,880,000 4,563,200
CN 20,340,000 4,438,460 35,633,000
Total Amounts: 4,644,300 26,533,200 9,435,429 35,873,000
Webster 228 KY-138 RECONSTRUCT BETWEEN KY 120 AND PL
RR BRIDGE AT SLAUGHTERS TO DN
ALLEVIATE FLOODING. (12CCR)(18CCN) RW SPP 200,000
(2020CCR) (2022CCR) (2024CCR) UT SPP 312,000
CN SPP 1,360,000
Project Cost: 512,000 1,360,000 0 0
Webster 10138 KY-132 BRIDGE PROJECT IN WEBSTER COUNTY PL
ON (117B00038N) KY-132 AT UNNAMED DN
STREAM RW BRX 10,000
UT BRX 10,000
CN BRX 1,190,000
Project Cost: 0 0 0 1,210,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 261
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Webster 10159 KY-2836 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-2836 OVER SLOVER CREEK DN BRZ 180,514
(117B00122N) RW
UT
CN BRZ 1,203,429
Project Cost: 0 0 1,383,943 0
Webster 10182 KY-2839 ADDRESS DEFICIENCIES OF BRIDGE ON PL
KY-2839 OVER BR TO JACKSON DITCH DN FBP 212,990
(117B00121N) RW
UT
CN FBP 1,419,934
Project Cost: 1,632,924 0 0 0
Webster 20064 I -69 ADDRESS CONDITION OF I-069 FROM PL
MILEPOINT 134.982 TO MILEPOINT 136.5 DN NHPM 130,000
RW
UT
CN NHPM 1,307,504
Project Cost: 0 1,437,504 0 0
Webster 22092 I -69 ADDRESS CONDITION OF I-069 FROM PL
MILEPOINT 136.5 TO MILEPOINT 137.141 DN NHPM 50,000
RW
UT
CN NHPM 554,500
Project Cost: 604,500 0 0 0
Webster 80316 KY-630 Address service concerns of KY 630 PL
from KY 132 in Dixon to the Hopkins DN SPP 760,000
County Line (2024CCN) RW SPP 2,750,000
UT SPP 1,620,000
CN SPP 8,540,000
Project Cost: 760,000 2,750,000 1,620,000 8,540,000
262 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Webster 80402 KY-132 Address right turn issues at entrance to PL
Canaan Ridge Park DN SPP 250,000
RW SPP 100,000
UT SPP 300,000
CN SPP 900,000
Project Cost: 250,000 400,000 900,000 0
Webster 80403 KY-56 Address service and safety concern of PL
KY-56 from US-41 in Sebree to the DN SPP 600,000
McLean County Line. This is a breakout of RW SPP 660,000
Project 02 117 D0056 1.00 UT SPP 1,100,000
CN SPP 5,500,000
Project Cost: 600,000 660,000 1,100,000 5,500,000
Total for Webster county PL
DN 1,872,990 130,000 180,514
RW 200,000 3,510,000 10,000
UT 312,000 300,000 2,720,000 10,000
CN 1,974,434 2,667,504 2,103,429 15,230,000
Total Amounts: 4,359,424 6,607,504 5,003,943 15,250,000
Whitley 8954 PF-9999 CONSTRUCT A NEW ENTRANCE TO THE PL
UNIVERSITY OF THE CUMBERLANDS DN SPP 410,000
FROM SOUTH 2ND ST UP THE HILL TO TIE RW
INTO HUTTON WAY. (16CCN) (2024CCN) UT SPP 70,000
CN SPP 2,180,000
Project Cost: 410,000 2,250,000 0 0
Whitley 22107 I -75 ADDRESS CONDITION OF I-075 FROM PL
MILEPOINT 11.27 TO MILEPOINT 20.045 DN NHPM 2,400,000
RW
UT
CN NHPM 24,000,000
Project Cost: 26,400,000 0 0 0
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 263
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Whitley 80107 US-25 IMPROVE SAFETY AND MOBILITY ON US PL
25W (MILEPOINT 13.3 TO MILEPOINT 14.6) DN
INCLUDED IN THIS RECONSTRUCTION RW STP1 1,500,000
WILL BE APPROXIMATELY 1.3 MILES OF UT STP1 1,500,000
ROADWAY TO BE WIDENED/IMPROVED,
CN STP1 10,000,000 9,000,000
Project Cost: 1,500,000 1,500,000 10,000,000 9,000,000
Whitley 80307 CR-1412 Resurfacing of High Top Road (2024CCN) PL
DN
RW
UT
CN SPP 380,000
Project Cost: 380,000 0 0 0
Whitley 80308 CS-1132 Widen existing South 2nd street to PL
improve geometric deficiencies along DN SPP 1,040,000
route (2024CCN) RW SPP 3,500,000
UT SPP 1,500,000
CN SPP 3,000,000
Project Cost: 1,040,000 5,000,000 0 3,000,000
Whitley 80310 US-25 Improve safety by lowering vertical crest PL
on US25W and realigning High Top Road DN
intersection with US25W (2024CCN) RW SPP 210,000
UT SPP 250,000
CN SPP 400,000
Project Cost: 210,000 250,000 400,000 0
Whitley 80353 I -75 Widen I-75 from MP 19.2 in Whitley County PL
to MP 23.5 South of Corbin (2024CCN) DN
RW NH 530,000
UT NH 500,000
CN NH 50,000,000
Project Cost: 0 1,030,000 0 50,000,000
264 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Whitley 80354 I -75 Widen I-75 from MP 14.4 in Whitley County PL
to MP 19.2 (2024CCN) DN NH 2,500,000
RW NH 500,000
UT NH 500,000
CN
Project Cost: 0 2,500,000 1,000,000 0
Whitley 80355 I -75 Widen I-75 from MP 10.1 in Whitley county PL
to MP 14.4 (2024CCN) DN
RW NH 500,000
UT NH 500,000
CN
Project Cost: 0 0 0 1,000,000
Whitley 80405 KY-92 Construct southern backage road with PL
roundabout at KY92 and implement DN SPP 637,000
access management west of Penny Lane. RW SPP 1,000,000
Concept 1 from the 11-1 planning study UT SPP 1,000,000
CN SPP 6,370,000
Project Cost: 637,000 1,000,000 1,000,000 6,370,000
Whitley 80406 US-25 Improve mobility and congestion along PL
US25W from 14th Street to KY312. DN SPP 200,000
Construct roundabouts at each end of the RW SPP 50,000
Main StreetKentucky Avenue couplet. UT SPP 50,000
CN SPP 2,363,000
Project Cost: 200,000 50,000 50,000 2,363,000
Whitley 80407 KY-727 Address safety and surface condition PL
issues on KY 727 (West 5th Street) from DN SPP 500,000
Poplar Street to West 4th Street in Corbin. RW SPP 1,000,000
UT SPP 2,050,000
CN SPP 5,500,000
Project Cost: 500,000 1,000,000 2,050,000 5,500,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 265
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Whitley 80408 KY-296 Address safety concerns and horizontal PL
alignment with curve just passed Brush DN SPP 300,000
Arbor Road, as well as adding sidewalks RW SPP 1,000,000
to roadway. UT SPP 500,000
CN SPP 3,000,000
Project Cost: 300,000 1,000,000 500,000 3,000,000
Whitley 80415 US-25 Improve safety by reconstructing PL
intersection of US-25W and Angel Road DN
RW NH 500,000
UT NH 300,000
CN NH 1,250,000
Project Cost: 800,000 1,250,000 0 0
Whitley 80416 US-25 Improve safety by rescontructing PL
intersection of US-25W and Hightop Road DN NH 400,000
RW NH 500,000
UT NH 300,000
CN NH 1,250,000
Project Cost: 400,000 500,000 300,000 1,250,000
Whitley 80417 CR-1305 Safety improvements & congestion relief PL
on KY92 by providing circulation through DN
the corridor RW SPP 1,357,000
UT SPP 1,000,000
CN SPP 6,370,000
Project Cost: 2,357,000 6,370,000 0 0
Whitley 80418 KY-727 Improve safety by correcting substandard PL
geometry DN SPP 1,000,000
RW SPP 2,000,000
UT SPP 2,250,000
CN SPP 3,500,000
Project Cost: 1,000,000 2,000,000 2,250,000 3,500,000
266 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Whitley 80427 US-25 Intersection Improvements on 18th Street PL
(US 25W) DN
RW
UT SPP 295,000
CN SPP 500,000
Project Cost: 795,000 0 0 0
Whitley 80428 KY-312 Convert Master Street (KY 312) from rural PL
to urban section with curb, gutter and DN SPP 250,000
storm sewers. RW SPP 250,000
UT SPP 1,330,000
CN SPP 1,600,000
Project Cost: 250,000 1,580,000 1,600,000 0
Whitley 80429 KY-830 North Hamlin Ave/Roy Kidd Ave PL
intersection realignment to include curb & DN
gutter and sidewalks on each side RW
UT
CN SPP 400,000
Project Cost: 400,000 0 0 0
Whitley 80432 CS-2017 Improve curb and gutter on 7th Street from PL
Steele Street to Sycamore Avenue DN SPP 100,000
RW SPP 25,000
UT SPP 145,000
CN SPP 200,000
Project Cost: 470,000 0 0 0
Total for Whitley county PL
DN 7,237,000 2,500,000
RW 3,592,000 9,830,000 500,000 500,000
UT 1,740,000 5,150,000 6,650,000 500,000
CN 25,480,000 9,800,000 12,000,000 83,983,000
Total Amounts: 38,049,000 27,280,000 19,150,000 84,983,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 267
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Wolfe 177 KY-15 Minor widening to improve redundancy of PL
Regional travel. (2024CCR) DN
RW
UT
CN PROT 7,430,000
Project Cost: 7,430,000 0 0 0
Wolfe 80352 KY-715 Reconstruct KY 715 from intersection PL
with KY 11 (0.0) to the intersection with DN SPP 2,600,000
KY 15 (MP 5.765). (2024CCN) RW
UT
CN
Project Cost: 2,600,000 0 0 0
Wolfe 80417 KY-191 Reconstruct KY 191 from the Mountain PL
Parkway Exit/Underpass to KY 3356 (MP DN SPP 1,140,000
3.096 - 6.808) RW SPP 3,985,000
UT SPP 1,560,000
CN SPP 11,400,000
Project Cost: 1,140,000 3,985,000 1,560,000 11,400,000
Wolfe 80418 KY-191 Hill and curve correction on KY 191 PL
between Hazel Green and KY 205 DN
(02CCN)(08CCR)(10CCR). THIS PROJECT RW SPP 400,000
REPLACES SYP 10-8102. UT SPP 900,000
CN SPP 2,900,000
Project Cost: 400,000 900,000 0 2,900,000
Total for Wolfe county PL
DN 3,740,000
RW 400,000 3,985,000
UT 900,000 1,560,000
CN 7,430,000 14,300,000
Total Amounts: 11,570,000 4,885,000 1,560,000 14,300,000
268 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Woodford 117 US-60 IMPROVE US 60 (VERSAILLES ROAD) PL
FROM THE BLUEGRASS DN
PARKWAY/HUNTERTOWN PIKE TO RW
PISGAH PIKE. UT
CN NH 6,910,000
Project Cost: 0 0 6,910,000 0
Woodford 8905 US-60 ACCESS MANAGEMENT IMPROVEMENTS PL
ON US 60 FROM LEXINGTON ROAD AT DN
WOODFORD FEED TO MARSAILLES RW
DRIVE (MP 9.38 TO MP 9.70).(16CCN) UT SPP 800,000
(18CCN) (2022CCR) (2024CCR)
CN SPP 910,000
Project Cost: 800,000 910,000 0 0
Woodford 8908 EXTEND FALLING SPRINGS BLVD FROM PL
TYRONE PIKE (US-62) TO CLIFTON ROAD DN
(KY-1964) RW SPP 3,510,000
UT SPP 5,180,000
CN SPP 9,550,000
Project Cost: 0 8,690,000 9,550,000 0
Woodford 80200 KY-1659 Reconstruct McCracken Pike (KY-1659) PL
on a new horizontal alignment to minimize DN
pedestrian and vehicle conflicts near RW
Woodford Reserve Distillery (ROW to be UT
provided by County) (2022CCN)
CN SPP 1,660,000
Project Cost: 1,660,000 0 0 0
Woodford 80252 US-62 RECONSTRUCT INTERSECTION AT US 62 PL
(ROSE HILL AVE & TYRONE PK) AND KY DN SPP 370,000
1964 (CLIFTON RD) IN VERSAILLES RW SPP 500,000
(2022CCN) UT SPP 1,000,000
CN SPP 2,000,000
Project Cost: 370,000 500,000 1,000,000 2,000,000
2028-2032 HIGHWAY PRECONSTRUCTION PLAN 269
County Item No. Route Description Phase Fund FY2029 FY2030 FY2031 FY2032
Woodford 80320 KY-341 Improve safety and mobility on KY 341 PL
beginning at I-64 to approximately 0.8 DN SPP 650,000
miles north. (2024CCN) RW SPP 630,000
UT SPP 780,000
CN SPP 3,500,000
Project Cost: 650,000 1,410,000 3,500,000 0
Woodford 80357 US-60 Safety improvements on US 60X from PL
Main Street to Maple Street in Versailles DN SPP 275,000
(MP 0.940-1.234). (2024CCN) RW
UT SPP 6,600,000
CN SPP 3,000,000
Project Cost: 275,000 6,600,000 3,000,000 0
Woodford 80400 KY-2113 Intersection improvements at KY 2113/US PL
62 and KY2113/KY 33. Consider DN
design/build. RW
UT
CN SPP 2,000,000
Project Cost: 2,000,000 0 0 0
Total for Woodford county PL
DN 1,295,000
RW 4,640,000
UT 800,000 12,560,000 1,000,000
CN 3,660,000 910,000 22,960,000 2,000,000
Total Amounts: 5,755,000 18,110,000 23,960,000 2,000,000
270 2028-2032 HIGHWAY PRECONSTRUCTION PLAN
Fund Summary
Fund Description FY 2029 FY 2030 FY 2031 FY 2032 Total
APD APD 46,000,000 47,190,000 0 0 93,190,000
BRO BRO 69,838,397 73,532,900 73,789,468 75,665,468 292,826,233
BRO2 BRO2 83,705,000 80,949,000 80,949,000 80,949,000 326,552,000
BRX BRX 76,259,574 74,019,073 75,787,833 69,829,376 295,895,856
BRZ BRZ 33,522,722 19,197,211 17,731,513 18,589,734 89,041,180
CARB CARB 14,600,000 14,600,000 14,600,000 14,600,000 58,400,000
CM CM 8,100,000 8,100,000 8,100,000 8,100,000 32,400,000
FBP FBP 100,440,008 88,142,357 96,917,227 104,475,601 389,975,193
FBP2 FBP2 19,887,528 15,436,853 15,064,489 11,075,690 61,464,560
GAR GAR 38,600,000 38,600,000 38,600,000 38,600,000 154,400,000
GR GR 155,000 0 0 0 155,000
NH NH 980,320,953 1,293,897,618 1,209,475,000 3,940,144,628 7,423,838,199
NHPM NHPM 236,351,411 179,651,412 143,892,049 156,822,232 716,717,104
PROT PROT 62,240,000 19,890,000 21,080,000 5,000,000 108,210,000
RRP RRP 3,140,000 4,220,000 4,220,000 4,220,000 15,800,000
SAF SAF 71,300,000 71,300,000 71,300,000 71,300,000 285,200,000
SAH SAH 1,800,000 1,800,000 1,800,000 1,800,000 7,200,000
SLO SLO 26,800,000 26,800,000 26,800,000 26,800,000 107,200,000
SLX SLX 7,800,000 7,800,000 7,800,000 7,800,000 31,200,000
SNK SNK 8,600,000 8,600,000 8,600,000 8,600,000 34,400,000
SPP SPP 1,414,208,100 2,047,679,700 2,805,780,000 4,858,010,200 11,125,678,000
STP1 STP1 67,120,000 75,380,000 113,430,000 86,390,000 342,320,000
STP2 STP2 210,675,200 352,658,000 230,240,000 170,460,000 964,033,200
STP3 STP3 8,481,221 20,767,854 0 0 29,249,075
STP4 STP4 21,772,290 21,682,627 13,707,000 7,511,514 64,673,431
STP5 STP5 31,859,700 26,760,960 25,225,000 29,000,000 112,845,660
STPF STPF 231,634,000 310,991,000 206,782,000 407,770,000 1,157,177,000
TAP TAP 12,300,000 12,300,000 12,300,000 12,300,000 49,200,000
Total Amount 3,887,511,104 4,941,946,565 5,323,970,579 10,215,813,443 24,369,241,691

Set out the last four years of the Six-Year Road Plan.

Sponsors

Rep. Jason Petrie (R) sponsors HJR 75, and 3 members have co-sponsored it.

Committees

HJR 75 went before 5 committees: Committee On Committees, Appropriations and Revenue, Rules, Committee on Committees and Transportation.

Committee On Committees
Committee On Committees
Referred to · Mar 3, 2026 · 52 Bills
Appropriations and Revenue
Appropriations and Revenue
Referred to · Mar 4, 2026 · 156 Bills
Rules
Rules
Referred to · Mar 10, 2026 · 7 Bills
Committee on Committees
Committee on Committees
Referred to · Mar 11, 2026
Transportation
Transportation
Referred to · Mar 13, 2026

History

HJR 75 has taken 34 actions since Mar 3, 2026, the latest on Apr 13, 2026.

ChamberAction
Apr 13, 2026
House
signed by Governor (Acts Ch. 144)
Apr 1, 2026
Senate
reported favorably, to Rules with Committee Substitute (1)
Apr 1, 2026
Senate
posted for passage in the Regular Orders of the Day for Wednesday, April 01 2026
Apr 1, 2026
Senate
3rd reading, adopted 38-0 with Committee Substitute (1)
Apr 1, 2026
House
received in House

Votes

HJR 75 went to 3 roll calls across both chambers, the latest on Apr 1, 2026 at 380.

ChamberQuestion
Yea
Nay
Apr 1, 2026
Senate
Senate: Adopt w/ SCS 1 RSN# 4107
38
0
Apr 1, 2026
House
House: Veto Override RCS# 415
91
0
Mar 10, 2026
House
House: Adopt RCS# 225
95
4

Source: apps.legislature.ky.gov · legiscan.com